Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 20, Scarborough Southwest

1 Camilla Cres

The City of Toronto has 4 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Rev 01: Proposal for changes to the finished basement floor plan. Proposal for interior alterations and construction of two storey side and rear additions, and second storey addition to existing sfd-detached. Scope also includes front and rear deck, basement walkout and underpinning.

    Applied May 4, 2022 · issued Jun 10, 2022 · Permit 18 200938 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing - Proposal for interior alterations and construction of two storey side and rear additions, and second storey addition to existing sfd-detached. Scope also includes front and rear deck, basement walkout and underpinning.

    Applied Jan 27, 2021 · issued Jan 27, 2021 · completed Dec 31, 2025 · Permit 18 200938 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations and construction of two storey side and rear additions, and second storey addition to existing sfd-detached. Scope also includes front and rear deck, basement walkout and underpinning.

    Applied Aug 21, 2018 · issued Sep 4, 2018 · completed Nov 23, 2023 · Permit 18 200938 HVA

    Closed
  • Small residential project · Multiple projects

    Proposal for interior alterations and construction of two storey side and rear additions, and second storey addition to existing sfd-detached. Scope also includes front and rear deck, basement walkout and underpinning.

    Applied Jul 27, 2018 · issued Sep 4, 2018 · Permit 18 200938 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 658 Pharmacy Ave · Minor variance

    To convert the existing two-storey dwelling into a triplex with interior alterations. There will be a total of four dwelling units on the lot.

    200 m away · filed Jun 6, 2025 · Approved

  • 2 Dorine Cres · Minor variance

    To construct an addition to front of the existing dwelling. Previously Deferred from April 2024 Hearing.

    60 m away · filed Jan 12, 2024 · Approved

  • 8 Clairlea Cres · Minor variance

    To construct a new dwelling.

    150 m away · filed Feb 22, 2023 · Approved

  • 11 Hollydene Rd · Minor variance

    To construct a second floor addition to the existing garage and convert to a garden suite.

    200 m away · filed Jan 18, 2023 · Approved

  • 37 Karnwood Dr · Minor variance

    To construct rear and side two-storey additions to existing dwelling.

    240 m away · filed Aug 29, 2022 · Approved

  • 17 Dorine Cres · Minor variance

    To construct a two-storey rear addition, a second storey addition over the existing dwelling and a new attached garage.

    120 m away · filed Feb 19, 2020 · Approved

  • 11 Delwood Dr · Minor variance

    To construct a new two-car detached garage in the rear yard.

    190 m away · filed Apr 13, 2018 · Approved

Everything planned in Scarborough Southwest

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.