Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

1 Curzon St

The City of Toronto has 6 building permits since 2017 (6 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Revision 02: Revision to permit. Proposal to revise the building use to a single family dwelling, including updates to architectural design and details in support of this change

    Applied May 20, 2026 · issued Jul 14, 2026 · Permit 24 104520 BLD (revision 03)

    Revision issued
  • Heating and ventilation

    REVISION 2 - convert to an SFDHVAC - Renovation and addition to existing three-story townhouse (with secondary suite) and renovation/conversion of existing two-story garage into a laneway suite

    Applied Mar 6, 2026 · issued Jul 29, 2026 · Permit 24 104520 HVA (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    Rev 01 - Minor revision to underpinning and foundation work.Interior alterations for a secondary suite and addition to the existing three-storey townhouse.

    Applied Jan 29, 2026 · issued Mar 3, 2026 · Permit 24 104520 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing - Renovation and addition to existing three-story townhouse (with secondary suite) and renovation/conversion of existing two-story garage into a laneway suite

    Applied Jan 25, 2024 · issued Nov 20, 2024 · Permit 24 104520 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Renovation and addition to existing three-story townhouse (with secondary suite) and renovation/conversion of existing two-story garage into a laneway suite

    Applied Jan 25, 2024 · issued Nov 20, 2024 · Permit 24 104520 HVA

    Permit issued
  • Small residential project · Multiple projects

    Interior alterations for a secondary suite and addition to the existing three-storey townhouse.

    Applied Jan 14, 2024 · issued Nov 20, 2024 · 1 home added · Permit 24 104520 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · NR addition

    To alter the existing three-storey townhouse by constructing: a first and second storey front addition; a rear third storey addition; a rear second storey covered deck; a rear third storey partially covered deck; a front basement walkout; and converting the basement into a secondary suite. In addition, the existing rear two-storey detached garage will be converted into a two-storey laneway suite with a basement, an attached carport with one parking space, and solar panels on the rooftop.

    Decision: Approved (hearing Nov 17, 2021)

    Filed Jul 23, 2021 · File A0959/21TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 58 Jones Ave · Minor variance

    To construct a new detached four-storey apartment building (containing seven residential dwelling units) with a front entrance with stairs, a side (north) covered entrance with stairs, a rear ground floor entrance with stairs and a partially enclosed waste storage in the front yard. Also, to construct a rear detached two-storey ancillary building (containing one laneway suite) with a rear (west) covered entrance and one visitor parking space, abutting the laneway. Further, to construct a rear one-storey detached ancillary building (containing 12 bicycle parking spaces). There will be a total…

    190 m away · filed Jun 25, 2026 · Approved

  • 45 Jones Ave · Minor variance

    To legalize and maintain the existing rear two-storey addition, including a basement extension below with a walkout, a rear second floor balcony (above the garage), and side (north) exterior staircases (one leading to the ground level and one leading to the second level), which was constructed without an authorized building permit.This addition will be abutting the existing one-storey detached ancillary building (garage), will not be accessible through the main portion of the dwelling and will have separate accesses to each level. There will be one residential dwelling unit on this lot.

    150 m away · filed Jul 22, 2025 · Refused

  • 23 Curzon St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a ground floor deck and stairs.

    30 m away · filed Oct 16, 2024 · Approved

  • 43 Hastings Ave · Minor variance

    To legalize and to maintain the front porch, which was constructed without an authorized building permit.

    220 m away · filed Oct 8, 2024 · Approved

  • 59 Jones Ave · Minor variance

    To legalize and to maintain the front integral garage which was constructed beyond the limits of the approved building permit. Also, to alter the new three-storey semi-detached dwelling, which is currently under construction, by permitting a rear third storey addition.

    170 m away · filed Dec 18, 2023 · Approved

  • 59 Jones Ave · Minor variance

    To legalize and to maintain the front integral garage which was constructed beyond the limits of the approved building permit. Also, to alter the new three-storey semi-detached dwelling, which is currently under construction, by permitting a rear third storey addition.

    170 m away · filed Dec 14, 2023 · Approved

  • 1170 Queen St E · Minor variance

    To convert the use of an existing two-storey mixed-use (commercial/residential) building into only commercial uses.

    110 m away · filed May 25, 2023 · Approved

  • 29 Curzon St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear second floor roof deck, and a ground level rear deck and terrace. Also, to reconstruct the enclosed front porch.

    50 m away · filed Mar 3, 2023 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.