Toronto address · Ward 11, University-Rosedale
1 Palmerston Gdns
The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Drains and site services · Back water valve (Sewer only)
Proposal to install a backwater valve on the sanitary line in an existing SFD-semi dwelling.
Applied Mar 1, 2024 · issued Mar 4, 2024 · Permit 24 120915 DRN
- Inspections under way
Small residential project · Interior alterations
Interior alterations to convert existing bedroom and bathroom into large bathroom at second floor
Applied Aug 21, 2007 · issued Aug 21, 2007 · Permit 07 254876 BLD
- Inspections under way
Plumbing
Plumbing - Interior alterations to convert existing bedroom and bathroom into large bathroom at second floor
Applied Aug 21, 2007 · issued Aug 21, 2007 · Permit 07 254876 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Approved
9 storeys · 65 homes · Mixed use
450 m away · Site plan · Approved · filed Feb 22, 2022
Neighbours’ Committee of Adjustment files within 250 m
774 Markham St · Minor variance
To alter the existing three-storey semi-detached dwelling by enclosing the rear third storey balcony into habitable space.
210 m away · filed Jun 15, 2026 · Approved
60 Olive Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with stairs. The existing rear ground level deck will be demolished.
60 m away · filed May 20, 2026 · Approved
871 Palmerston Ave · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a rear second storey addition (above the rear one-storey portion of the dwelling).
210 m away · filed Apr 7, 2026 · Approved
844 Manning Ave · Minor variance
To construct a new one-storey detached ancillary building (one-car garage) in the rear yard, abutting the laneway.
210 m away · filed Jul 10, 2025 · Approved
786 Markham St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by construct a front third storey dormer addition with a balcony.
190 m away · filed Jun 27, 2025 · Approved
869 Palmerston Ave · Minor variance
To alter the existing two-storey townhouse by constructing a rear second storey addition.
210 m away · filed Jun 13, 2025 · Approved
745 Palmerston Ave · Minor variance
To construct a new one-storey ancillary building (detached garage and trellis) in the rear yard, abutting the laneway. The existing rear one-storey garage will be demolished.
240 m away · filed Feb 4, 2025 · Approved
6 Follis Ave · Minor variance
To construct a new three-storey detached dwelling with a front basement walkout and terrace, a front covered porch with a staircase, and a front third storey balcony. Also, to construct a new one-storey ancillary structure (carport containing one vehicular parking space) in the rear yard, fronting Max Hartstone Lane.
200 m away · filed Jan 20, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.