1 Percy St

The City of Toronto has 5 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Party wall admin permits

    Party wall admin permit for work at 3 Percy St. See Permit #16-165879

    Applied Jun 1, 2016 · issued Nov 8, 2017 · completed Jan 3, 2025 · Permit 16 165896 BLD

    Closed
  • Drains and site services

    Drain - To complete alterations to the grade beam on North and East side of the dwelling, and reconstruct the ground floor framing due to structural issues within the dwelling. The chimney will be removed as part of this project. Note: Existing crawl space will remain.

    Applied Apr 9, 2015 · issued Apr 9, 2015 · completed May 20, 2026 · Permit 14 121979 DRN

    Closed
  • Heating and ventilation

    HVAC - To complete alterations to the grade beam on North and East side of the dwelling, and reconstruct the ground floor framing due to structural issues within the dwelling. The chimney will be removed as part of this project. Note: Existing crawl space will remain.

    Applied Mar 10, 2015 · issued Mar 12, 2015 · completed May 20, 2026 · Permit 14 121979 HVA

    Closed
  • Plumbing

    Plumbing - To complete alterations to the grade beam on North and East side of the dwelling, and reconstruct the ground floor framing due to structural issues within the dwelling. The chimney will be removed as part of this project. Note: Existing crawl space will remain.

    Applied Mar 10, 2015 · issued Mar 10, 2015 · completed May 20, 2026 · Permit 14 121979 PLB

    Closed
  • Small residential project · Interior alterations

    To complete alterations to the grade beam on North and East side of the dwelling, and reconstruct the ground floor framing due to structural issues within the dwelling. The chimney will be removed as part of this project. Note: Existing crawl space will remain.

    Applied Feb 26, 2014 · issued Mar 7, 2014 · Permit 14 121979 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 498 Queen St E · Minor variance

    To legalize and to maintain the conversion of a rooming house into eight residential dwelling units, within this lawfully existing building.

    200 m away · filed Mar 7, 2025 · Deferred

  • 29 Sackville St · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a partial rooftop structure (pergola and wood deck above the existing flat roof dwelling), attached to the enclosed stair enclosure.

    220 m away · filed Jun 6, 2024 · Approved

  • 1 Ashby Pl · Minor variance

    To alter the existing two-storey rowhouse by reconstructing new rear decks on the first and second storeys. The second storey deck will be constructed with a canopy.

    70 m away · filed Aug 30, 2023 · Approved

  • 97 Sumach St · Minor variance

    To convert the existing three-storey townhouse from one unit into two units by installing a secondary suite within the basement and by constructing: a two storey rear addition; a partial third storey addition with a rear third storey roof terrace; a new front porch with stairs and a canopy; and a new rear basement walkout. Also, to construct an ancillary building (detached shed) in the rear yard of the property, abutting the laneway.

    250 m away · filed Feb 28, 2022 · Approved

  • 457 Queen St E · Minor variance

    To alter the existing two-storey townhouse by creating three secondary suites and constructing a third storey addition, a partial fourth storey (mezzanine) addition with a rear deck and a rear three storey addition with a rear ground floor deck. Each floor, including the basement, will contain one dwelling unit. Note: This proposal was considered and approved by the Committee of Adjustment in Decision A0838/19TEY; however, the applicant is requesting condition 2 to be revised in that Decision.

    200 m away · filed Dec 6, 2021 · Approved

  • 38 St Paul St · Minor variance

    To construct a two-storey detached dwelling (containing two dwelling units) with a front porch, two rear decks to provide two separate entry ways, a rear basement walkout and a rear second storey deck. Also, one parking space will be provided, abutting the laneway.

    230 m away · filed Sep 7, 2021 · Approved

  • 498 King St E · Minor variance

    To alter the existing three-storey mixed-use building by converting the existing commercial located at the ground floor and part of the basement into one residential unit. The remainder of the basement will be used as storage for the residential units. Interior alterations will be provided for the existing two residential units on the second and third floor. A rooftop mechanical room, rooftop access enclosure and rooftop terrace will be added. The altered building will consist of three residential units and no commercial space.

    70 m away · filed Dec 4, 2019 · Withdrawn

  • 507 King St E · Minor variance

    To alter the existing four-storey mixed-use building by performing interior renovations to support office uses, by creating an open rooftop amenity space, and by constructing a rear fourth storey amenity space addition and front and rear fourth storey additions for rooftop access via stair and elevator.

    160 m away · filed Oct 4, 2019 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.