Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 24, Scarborough-Guildwood

1 Toyota Pl

The City of Toronto has 22 building permits since 2017 (7 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation · HVAC: groups D & E

    Proposal to install two packaged cooling only rooftop units to supply supplemental cooling to two existing rooms.

    Applied Apr 13, 2023 · issued May 4, 2023 · Permit 23 133651 MSA

    Permit issued
  • Demolition

    Proposal for demolition of office portable, decommissioning services

    Applied Mar 23, 2023 · issued May 8, 2023 · completed May 30, 2023 · Permit 23 126052 DEM

    Closed
  • Heating and ventilation

    HVAC - Proposed interior alterations to new office on the first floor (west building0

    Applied Jan 30, 2023 · issued Feb 21, 2023 · completed Apr 14, 2023 · Permit 23 108363 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposed interior alterations to new office on the first floor (west building)

    Applied Jan 30, 2023 · issued Feb 9, 2023 · completed Apr 13, 2023 · Permit 23 108363 BLD

    Closed
  • Addition or alteration · Interior alterations

    Propose interior alterations.

    Applied Oct 4, 2022 · issued Oct 25, 2022 · completed Jan 30, 2023 · Permit 22 212898 BLD

    Closed
  • Heating and ventilation

    HVAC - Propose interior alterations.

    Applied Oct 4, 2022 · issued Oct 28, 2022 · completed Jan 25, 2023 · Permit 22 212898 HVA

    Closed
  • Designated structure · Sign building permit related

    In conjunction with a car dealership on the premises, proposal to erect and display one illuminated ground sign displaying static copy, located on the north frontage, perpendicular to Highway 401. The proposed sign contains two sign faces, measuring 9.04 metres vertically by 3.3 metres horizontally at a height of 9.45 metres.***TOYOTA***

    Applied Jan 2, 2018 · issued Feb 1, 2018 · completed Jul 31, 2019 · Permit 18 100161 DST

    Closed
  • Temporary structure · Certified tents

    Install a certified tent for Toyo to display products - Certified tent 14-240364 - Install May 3 removed May 11/16

    Applied Mar 23, 2016 · issued Mar 29, 2016 · completed Apr 10, 2018 · Permit 16 131407 TPS

    Closed
  • Designated structure · Sign building permit related

    To erect and display three static illuminated ground signs.**TOYOTA**

    Applied Feb 3, 2016 · issued Feb 18, 2016 · completed May 24, 2017 · Permit 16 112503 DST

    Closed
  • Temporary structure · Certified tents

    install 40 x 60 certified tent #14-240264 - Install Nov. 9/15- remove Nov. 17/15 -for Product Exhibition

    Applied Oct 1, 2015 · issued Oct 16, 2015 · completed Apr 10, 2018 · Permit 15 231562 TPS

    Closed
  • Temporary structure · Certified tents

    Temporary certified tent (#14-240264) area 40x60 from Sept 9 - 17/15,

    Applied Aug 12, 2015 · issued Aug 25, 2015 · completed Apr 10, 2018 · Permit 15 205781 TPS

    Closed
  • Temporary structure · Certified tents

    Install 40x60 frame tent from May 26 2014 to June 03 2014Certified tent Number is 11-144601

    Applied Apr 11, 2014 · issued Apr 17, 2014 · completed Apr 10, 2018 · Permit 14 141603 TPS

    Closed
Show 10 more permits
  • Temporary structure · Certified tents

    Install 40x60 frame tent Sept. 29 to Oct 9/13Certified tent Number is 10-256161

    Applied Sep 6, 2013 · issued Oct 8, 2013 · completed Apr 10, 2018 · Permit 13 231780 TPS

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    install backflow preventer

    Applied Jul 30, 2012 · issued Aug 24, 2012 · completed Jul 14, 2026 · Permit 12 220619 PSA

    Closed
  • Temporary structure · Certified tents

    install 40 x 60 frame tent on Nov 21st until Nov 29th (certified 10-256161)

    Applied Oct 17, 2011 · issued Oct 27, 2011 · completed Apr 10, 2018 · Permit 11 293930 TPS

    Closed
  • Temporary structure · Certified tents

    install 40 x 60 frame tent on April 25/11 remove April 30/11 (Cet. #10-256161)

    Applied Mar 14, 2011 · issued Mar 28, 2011 · completed Apr 10, 2018 · Permit 11 144601 TPS

    Closed
  • Heating and ventilation

    HVAC - interior renovations of exisitng storage space into office space including addition of windows skylighs, finishes and related mechanical, electrical and structural

    Applied Jul 10, 2008 · issued Sep 3, 2008 · Permit 08 180497 HVA

    Inspections under way
  • Addition or alteration · Multiple projects

    interior renovations of exisitng storage space into office space including addition of windows skylighs, finishes and related mechanical, electrical and structural

    Applied Jul 10, 2008 · issued Aug 20, 2008 · Permit 08 180497 BLD

    Inspections under way
  • Addition or alteration · Multiple projects

    Truck well infill, addition of dock levellors, replacement of overhead doors, addition of a canopy and trailer pads at docks 1 and 2.

    Applied Nov 23, 2006 · issued Dec 6, 2006 · Permit 06 155421 BLD (revision 01)

    Revision issued
  • Addition or alteration · Multiple projects

    Truck well infill, addition of dock levellors, replacement of overhead doors, addition of a canopy and trailer pads at docks 1 and 2.

    Applied Jul 11, 2006 · issued Sep 11, 2006 · Permit 06 155421 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - INTERIOR ALTERATIONS "TOYOTA CANADA INC" - Interior Alterations

    Applied Aug 19, 2004 · issued Nov 23, 2004 · Permit 04 167701 HVA

    Inspections under way
  • Non-residential building permit · Alteration to existing building

    Heating upgrade.minor arch/struct/elect.

    Applied Dec 28, 2000 · issued Feb 12, 2001 · Permit 00 364259 CMB

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

None on file since 2017.

Everything planned in Scarborough-Guildwood

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.