Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 6, York Centre

10 Bitteroot Rd

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Proposed interior alterations to existing dwelling to include improved kitchen layout and new finishes (no proposed changes to plumbing locations), exterior work to include structural upgrades to 2nd-storey deck, replacement of rear patio pavers, and construction of new aboove-ground hot tub deck

    Applied Aug 8, 2022 · issued Sep 8, 2022 · completed Dec 23, 2022 · Permit 22 187547 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 4700 Bathurst Street

    9 storeys · 142 homes · Residential

    500 m away · Site plan · Under review · filed Dec 3, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 90 Brighton Ave · Minor variance

    To construct a new dwelling.

    200 m away · filed May 11, 2021 · Approved

  • 6 Bitteroot Rd · Minor variance

    To construct a new dwelling.

    30 m away · filed Sep 1, 2020 · Approved

  • 100 Brighton Ave · Minor variance

    To construct a second storey addition.

    210 m away · filed Mar 11, 2020 · Approved

  • 135 Hove St · Minor variance

    To construct anew dwelling with integral garage. More than 50% of the existing dwellings walls will be demolished.

    250 m away · filed Aug 2, 2017 · Approved

  • 21 Dellbank Rd · Minor variance

    To construct a second floor addition on the east portion of the existing dwelling, including a finished basement as a secondary suite with a basement walkout.

    200 m away · filed Aug 3, 2016 · Approved

Everything planned in York Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.