Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

10 Martha Eaton Way

The City of Toronto has 6 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Garage Repair/Reconstruction

    PROPOSED: Interior parking garage concrete repairs to suspended slabs, application of traffic topping, replacement of expansion joints waterproofing, drainage repairs and garage painting.

    Applied Jun 8, 2021 · issued Jul 9, 2021 · Permit 21 167815 BLD

    Permit issued
  • Addition or alteration · Garage Repair/Reconstruction

    REV01: Revision to permit 19-208120 BLD. Concrete slab replacemetn and waterproofing same area.Proposed parking garage slab repairs in existing apartment building.

    Applied Dec 12, 2019 · completed Apr 15, 2025 · Permit 19 208120 BLD (revision 01)

    Cancelled
  • Plumbing · Backflow prevention devices (Water only)

    Installing a new back flow prevention device located in the P1 mechanical room

    Applied Sep 5, 2019 · issued Sep 18, 2019 · completed Oct 17, 2019 · Permit 19 216558 PSA

    Closed
  • Addition or alteration · Garage Repair/Reconstruction

    Proposed parking garage slab repairs in existing apartment building.

    Applied Aug 19, 2019 · issued Oct 3, 2019 · Permit 19 208120 BLD

    Permit issued
  • Addition or alteration · Garage Repair/Reconstruction

    Garage slab repairs to levels A, B. & C.

    Applied Aug 9, 2011 · issued Aug 12, 2011 · Permit 11 253911 BLD

    Permit issued
  • Residential building permit · Alteration to existing building

    Repair exisitng balconies in a condo building.

    Applied Aug 16, 2000 · issued Sep 7, 2000 · Permit 00 328631 CMB

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 29 Parkchester Rd · Minor variance

    To construct a new garden suite.

    150 m away · filed May 14, 2025 · Approved

  • 15 Parkchester Rd · Minor variance

    To construct a second storey addition above the existing dwelling and a new rear deck.

    240 m away · filed Nov 18, 2020 · Approved

  • 30 Westchester Rd · Minor variance

    To construct an east side carport, a one-storey east side addition and a new covered rear deck.

    240 m away · filed May 14, 2020 · Approved

  • 49 Parkchester Rd · Minor variance

    To construct a two-storey south side addition which will include an attached garage, a second storey addition above the existing dwelling, a new covered front porch and a new rear deck.

    180 m away · filed May 11, 2018 · Approved

  • 41 Parkchester Rd · Minor variance

    To construct a two-storey front addition, two-storey additions to the front and rear of the existing attached garage including a second storey above, and one-storey additions at the north and south sides of the existing second storey.

    150 m away · filed May 8, 2018 · Approved

  • 37 Parkchester Rd · Minor variance

    To construct a second storey addition above the existing dwelling and a new covered front porch.

    140 m away · filed Apr 24, 2017 · Approved

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.