Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

10 Percy St

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Back Water Valve (Sewer only)

    Applied Jan 19, 2017 · issued Jan 19, 2017 · completed Feb 2, 2017 · Permit 17 106375 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 498 Queen St E · Minor variance

    To legalize and to maintain the conversion of a rooming house into eight residential dwelling units, within this lawfully existing building.

    240 m away · filed Mar 7, 2025 · Deferred

  • 29 Sackville St · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a partial rooftop structure (pergola and wood deck above the existing flat roof dwelling), attached to the enclosed stair enclosure.

    200 m away · filed Jun 6, 2024 · Approved

  • 1 Ashby Pl · Minor variance

    To alter the existing two-storey rowhouse by reconstructing new rear decks on the first and second storeys. The second storey deck will be constructed with a canopy.

    110 m away · filed Aug 30, 2023 · Approved

  • 457 Queen St E · Minor variance

    To alter the existing two-storey townhouse by creating three secondary suites and constructing a third storey addition, a partial fourth storey (mezzanine) addition with a rear deck and a rear three storey addition with a rear ground floor deck. Each floor, including the basement, will contain one dwelling unit. Note: This proposal was considered and approved by the Committee of Adjustment in Decision A0838/19TEY; however, the applicant is requesting condition 2 to be revised in that Decision.

    240 m away · filed Dec 6, 2021 · Approved

  • 38 St Paul St · Minor variance

    To construct a two-storey detached dwelling (containing two dwelling units) with a front porch, two rear decks to provide two separate entry ways, a rear basement walkout and a rear second storey deck. Also, one parking space will be provided, abutting the laneway.

    250 m away · filed Sep 7, 2021 · Approved

  • 498 King St E · Minor variance

    To alter the existing three-storey mixed-use building by converting the existing commercial located at the ground floor and part of the basement into one residential unit. The remainder of the basement will be used as storage for the residential units. Interior alterations will be provided for the existing two residential units on the second and third floor. A rooftop mechanical room, rooftop access enclosure and rooftop terrace will be added. The altered building will consist of three residential units and no commercial space.

    110 m away · filed Dec 4, 2019 · Withdrawn

  • 507 King St E · Minor variance

    To alter the existing four-storey mixed-use building by performing interior renovations to support office uses, by creating an open rooftop amenity space, and by constructing a rear fourth storey amenity space addition and front and rear fourth storey additions for rooftop access via stair and elevator.

    150 m away · filed Oct 4, 2019 · Approved

  • 457 Queen St E · Minor variance

    To alter the existing two-storey townhouse by creating three secondary suites and constructing a third storey addition, a partial fourth storey (mezzanine) addition with a rear deck and a rear three storey addition with a rear ground floor deck. Each floor, including the basement, will contain one dwelling unit.

    240 m away · filed Jul 31, 2019 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.