Toronto address · Ward 13, Toronto Centre
10 Salisbury Ave
The City of Toronto has 4 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Drains and site services · Back water valve (Sewer only)
Install a back water valve
Applied Jan 20, 2022 · issued Jan 21, 2022 · Permit 22 105963 DRN
- Closed
Plumbing
Plumbing - PROPOSED INTERIOR BASEMENT ALTERATION
Applied Dec 27, 2021 · issued Dec 27, 2021 · completed Sep 15, 2022 · Permit 21 235329 PLB
- Closed
Small residential project · Finishing basements
Proposed interior basement alteration
Applied Nov 8, 2021 · issued Dec 1, 2021 · completed Sep 15, 2022 · Permit 21 235329 BLD
- Closed
Small residential project · Other
Admin permit in connection with bp # 06-166300
Applied Aug 14, 2006 · issued Aug 14, 2006 · completed Jan 19, 2022 · Permit 06 166313 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
10 storeys · 60 homes · Mixed use
280 m away · Rezoning · Under appeal · filed Mar 17, 2023
- Under review
238-280 Wellesley Street East, 77 Howard Street and 650 Parliament Street
47 storeys · 3,182 homes · Mixed use
460 m away · Site plan · Under review · filed Apr 27, 2022
Neighbours’ Committee of Adjustment files within 250 m
21 Metcalfe St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear (east) ground floor addition and a rear third storey addition with a rear roof deck.
200 m away · filed Mar 11, 2026 · Approved
32 Salisbury Ave · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a rear third storey addition (enclosing a portion of the existing terrace).
100 m away · filed Jun 11, 2025 · Approved
603 1/2 Parliament St · Minor variance
To legalize and to maintain the existing three-storey non-residential building, which was converted from a residential building, without an authorized building permit. The existing non-residential use (law office) will be maintained.
210 m away · filed Jul 18, 2024 · Approved
49 Salisbury Ave · Minor variance
To alter the existing two-and-one-half storey semi-detached dwelling by constructing a west side one-storey addition with new basement area below, and a west side three-storey elevator addition. Also the existing west side deck will be demolished. This site has heritage designation.
160 m away · filed May 13, 2024 · Approved
17 Metcalfe St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition above the existing rear two-storey portion of the dwelling.
210 m away · filed Apr 22, 2024 · Approved
49 Metcalfe St · Minor variance
To alter the existing three-storey semi-detached dwelling by demolishing the existing front covered porch, constructing a new covered front porch with stairs and relocating the air conditioner unit from the front of the lot (encroaching beyond the front yard lot line) to the front corner of the lot (partially encroaching beyond the front yard lot line), as approved by Minor Variance Decision A1380/22TEY. This current application is necessitated to correctly identify variances that were not included in the previous Minor Variance Decision.
80 m away · filed Dec 28, 2023 · Approved
51 Metcalfe St · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a new front porch (to replace the existing front porch).
70 m away · filed Dec 6, 2023 · Approved
294 Carlton St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition (with a third storey deck above), and a third storey addition.
250 m away · filed Oct 2, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.