Toronto address · Ward 13, Toronto Centre
100 Bleecker St
The City of Toronto has 4 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Revision to add washroom on third floor. See related Building Revision application, 18-185912-BLD-01.
Applied Nov 13, 2018 · issued Nov 13, 2018 · completed Dec 19, 2018 · Permit 18 185912 PLB (revision 01)
- Closed
Small residential project · Multiple projects
Revision to add washroom on third floor. See related Plumbing Revision application, 18-185912-PLB-01.
Applied Nov 13, 2018 · issued Dec 6, 2018 · completed Sep 3, 2020 · Permit 18 185912 BLD (revision 01)
- Closed
Plumbing
Plumbing - Proposal for interior alterations, finish basement and add new roof deck.
Applied Jun 28, 2018 · issued Jul 31, 2018 · completed Dec 19, 2018 · Permit 18 185912 PLB
- Closed
Small residential project · Multiple projects
Proposal for interior alterations, finish basement and add new roof deck.
Applied Jun 28, 2018 · issued Jul 31, 2018 · completed Sep 3, 2020 · Permit 18 185912 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Submitted
- Under review
39 storeys · 456 homes · Mixed use
120 m away · Condominium · Under review · filed Nov 8, 2021
- Under appeal
39 storeys · 378 homes · Residential
140 m away · Site plan · Under appeal · filed Jul 6, 2023
- Under appeal
10 storeys · 60 homes · Mixed use
400 m away · Rezoning · Under appeal · filed Mar 17, 2023
- Under review
238-280 Wellesley Street East, 77 Howard Street and 650 Parliament Street
47 storeys · 3,182 homes · Mixed use
430 m away · Site plan · Under review · filed Apr 27, 2022
- Under review
10 storeys · 60 homes · Mixed use
470 m away · Site plan · Under review · filed Jul 4, 2025
Neighbours’ Committee of Adjustment files within 250 m
169 Carlton St · Minor variance
To construct a one-storey ancillary structure (carport), in the rear yard, abutting the laneway (Doctor O Lane), for two parking spaces.
240 m away · filed Oct 10, 2024 · Approved
20 Aberdeen Ave · Minor variance
To alter the existing three-storey townhouse dwelling by constructing a new rear one-storey addition (with basement below), a side (east) basement walkout and a rear second storey rooftop deck (above the new rear addition). The existing rear one-storey addition will be demolished.
240 m away · filed Sep 4, 2024 · Approved
194 Carlton St · Minor variance
To convert the existing two-and-one-half-storey semi-detached mixed-use building into a three-unit dwelling (triplex).
220 m away · filed Jul 5, 2024 · Approved
50 Bleecker St · Minor variance
To construct a third storey addition (enclosed staircase) to provide access to the proposed rooftop deck for Unit 2.
120 m away · filed Jun 24, 2021 · Refused
159 Wellesley St E · Consent
To obtain consent for the creation of a new easement.
220 m away · filed Dec 7, 2020 · Approved with conditions
96 Bleecker St · Minor variance
To alter the existing 2½-storey townhouse by constructing a rear third storey addition with a balcony.
0 m away · filed Jan 4, 2019 · Approved
505 Ontario St · Minor variance
To alter the existing 2½-storey townhouse by constructing a rear second and third storey addition and a rear third storey deck.
180 m away · filed Jul 26, 2018 · Approved
13 Winchester St · Minor variance
To alter two existing semi-detached buildings by constructing a rear third storey addition, a rear two-storey addition, and a three-storey central addition to connect the two buildings. There will be four parking spaces at the rear of 13-15 Winchester Street and a deck at the rear of 17-19 Winchester Street. A total of 35 dwelling units will be provided as new affordable rental housing.
230 m away · filed Apr 23, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.