Toronto address · Ward 11, University-Rosedale
100 Edward St
The City of Toronto has 1 Committee of Adjustment file on record for this address.
Building permits
The City lists no building permits for this address since 2017, and none still open from before.
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To construct a new 19-storey (Building 'A' - 100 Edward Street) and 22-storey (Building 'B' - 70 Edward Street & 636 Bay Street) mixed use condominium building located on seven-storey podiums connected at the second storey with five levels of below grade parking.
Decision: Refused (hearing Apr 17, 2019)
Filed May 2, 2018 · Appeal: OMB approved · File A0454/18TEY
What’s planned nearby
Development sites within 500 m
- Under review
- Approved
604-610 Bay Street and 130 Elizabeth Street
43 storeys · 827 homes · Residential
60 m away · Site plan · Approved · filed Jul 22, 2025
- Submitted
249 homes · Not stated in the file
190 m away · Site plan · Submitted · filed Sep 2, 2026
- Under review
180 Dundas Street West and 123 Edward Street
72 storeys · Non-residential
190 m away · Site plan · Under review · filed Jun 14, 2022
- Under review
22 Elm Street and 33 Gerrard Street West
Not stated in the file
200 m away · Subdivision · Under review · filed Nov 5, 2021
- Under appeal
30 storeys · 216 homes · Mixed use
220 m away · Site plan · Under appeal · filed Sep 13, 2022
Neighbours’ Committee of Adjustment files within 250 m
130 Elizabeth St · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on t…
100 m away · filed Nov 17, 2025 · Approved
700 Bay St · Consent
To obtain consent to perform a stratified severance and to create supporting easements/right-of-ways.
190 m away · filed May 8, 2021 · Approved
25 Elm St · Minor variance
To alter the existing apartment building by converting three parking spaces in the underground parking to accessible parking spaces.
200 m away · filed Mar 8, 2021 · Approved
700 Bay St · Minor variance
To alter the redevelopment plan approved under Site Specific By-laws 548-2017 and 549-2017 by increasing the height of the main building roof by one metre to accommodate mechanical components.
190 m away · filed Oct 19, 2017 · Approved
595 Bay St · Minor variance
To modify the redevelopment plan approved under Site-specific By-law 1725-2013 by altering the existing non-residential building ("Atrium on Bay") by constructing a 6-storey addition plus mechanical penthouse above the west tower, a 5-storey addition plus mechanical penthouse above the east tower, a one-storey addition between the towers, a 2-storey addition to the west/south elevation, and interior alterations creating additional floor area. A concurrent Site Plan Application (12 131388 STE) is being processed.
140 m away · filed Mar 1, 2017 · Approved
595 Bay St · Minor variance
To construct an accessible ramp on the south side of the existing commercial building (Atrium on Bay).
140 m away · filed Sep 30, 2016 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.