Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 7, Humber River-Black Creek

100 Haynes Ave

The City of Toronto has 8 building permits since 2017 (7 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Alternative solution

    Combustible composite metal panel system, designated Alpolic/fr, an aluminum composite metal (ACM) panel system installed in limited areas on the exterior face of the building which exceeds 6 storeys will provide the level of performance required by 3.1.5.5.(1) & (2) of the 2012 OBC.

    Applied Dec 27, 2024 · completed Feb 10, 2025 · Permit 24 253987 ALT

    Approved
  • Partial permit · Partial permit - structural framing

    Part Permit - Proposal to construct a new 8-storey Student Residence consisting of 17,736 square metres, 335 residential units. See also 23-238032 WET 07 MV & 24-124627 WET 07 PAC

    Applied Dec 13, 2024 · issued Mar 20, 2025 · completed Apr 16, 2025 · Permit 24 223190 STR

    Closed
  • Alternative solution

    This Alternative Solution proposes the installation of fire hose connections in the exit stairs at the main floor landings in lieu of hose stations in the corridors located within 5 m of the exits stairs. The inherent features of this design takes into consideration the provision of a safe staging area to commence firefighting with the 65 mm hose connections at the intermediate floor landings in the exit stairs, rather than using fire hose connections on another floor level. The proposed approach is consistent with NBC Division B requirement for the standpipe system to meet NFPA 14, and elimi…

    Applied Dec 10, 2024 · completed Apr 15, 2025 · Permit 24 248922 ALT

    Approved
  • Drains and site services

    Drain - Proposal to construct a new 8-storey Student Residence consisting of 17,736 square metres, 335 residential units. See also 23-238032 WET 07 MV & 24-124627 WET 07 PAC

    Applied Oct 7, 2024 · issued Jan 27, 2025 · Permit 24 223190 DRN

    Inspections under way
  • Drains and site services · Site service

    Drain - Proposal to construct a new 8-storey Student Residence consisting of 17,736 square metres, 335 residential units. See also 23-238032 WET 07 MV & 24-124627 WET 07 PAC

    Applied Oct 7, 2024 · issued Sep 11, 2025 · Permit 24 223190 STS

    Inspections under way
  • New building

    Proposal to construct a new 8-storey Student Residence consisting of 17,736 square metres, 335 residential units. See also 23-238032 WET 07 MV & 24-124627 WET 07 PAC

    Applied Oct 7, 2024 · issued Apr 16, 2025 · Permit 24 223190 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct a new 8-storey Student Residence consisting of 17,736 square metres, 335 residential units. See also 23-238032 WET 07 MV & 24-124627 WET 07 PAC

    Applied Oct 7, 2024 · issued Jan 27, 2025 · Permit 24 223190 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct a new 8-storey Student Residence consisting of 17,736 square metres, 335 residential units. See also 23-238032 WET 07 MV & 24-124627 WET 07 PAC

    Applied Oct 7, 2024 · issued Jan 27, 2025 · Permit 24 223190 HVA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 14 Boake St · Minor variance

    To maintain the existing lodging house which will contain a total of 8 rooms and to construct a rear yard platform.

    190 m away · filed Apr 1, 2026 · Approved

Everything planned in Humber River-Black Creek

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.