Toronto address · Ward 11, University-Rosedale
100 Rosedale Valley Rd
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing · Backflow prevention devices (Water only)
Installation of one backflow prevention device in former Coach House building
Applied Dec 11, 2014 · issued Dec 17, 2014 · completed Mar 26, 2026 · Permit 14 263282 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
- Approved
25 McMurrich Street and 906 Yonge Street
19 storeys · 401 homes · Mixed use
290 m away · Site plan · Approved · filed Nov 3, 2021
- Approved
874-878 Yonge Street and 9-11 Scollard Street
Not stated in the file
320 m away · Site plan · Approved · filed Jan 11, 2024
- Approved
85-97 Collier Street and 717 Church Street
300 homes · Residential
350 m away · Condominium · Approved · filed Sep 21, 2021
- Approved
22-32 Scollard Street and 21-25 Davenport Road
61 storeys · 79 homes · Mixed use
350 m away · Rezoning · Approved · filed Dec 31, 2021
- Approved
11 storeys · Not stated in the file
360 m away · Site plan · Approved · filed Feb 13, 2025
Neighbours’ Committee of Adjustment files within 250 m
17 Belmont St · Minor variance
To convert the existing two-storey semi-detached mixed-use building (containing two residential dwelling units and three commercial units) to commercial uses. Also, to alter the building by constructing a rear one-storey vestibule addition to replace the existing attached garage, a front second storey dormer addition, a raised rear second storey balcony to replace the existing balcony, and a side (east) exterior staircase. The altered building will contain three commercial units (one dental clinic occupying the ground and second storeys, and two commercial units within the basement). There wi…
240 m away · filed Jun 17, 2026 · Approved
12 Cluny Dr · Minor variance
To construct a new three-storey detached dwelling with an integral garage, partial second and third floor green roofs, a rear third floor rooftop terrace (above the second floor), and a rear ground floor terrace with an in-ground pool.
120 m away · filed Dec 13, 2024 · Approved
12 Cluny Dr · Minor variance
To construct a new three-storey detached dwelling with a second storey rear deck, a third storey rear deck, an underground garage, a reflecting pond, and a swimming pool.
120 m away · filed Jun 28, 2022 · Approved
138 Rosedale Valley Rd · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a third-floor addition, and a rear third-floor enclosed balcony.
220 m away · filed Jan 20, 2021 · Approved
920 Yonge St · Minor variance
To convert a portion of the second basement level from storage space to an MRI suite relating to the existing Veterinary Hospital on the ground floor of the 19-storey mixed use building.
220 m away · filed Jun 23, 2019 · Approved
3 Cluny Dr · Minor variance
To construct a rear two-storey addition and an ancillary structure.
150 m away · filed Jul 13, 2017 · Approved
10 Rosedale Rd · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear three-storey addition and a new front covered platform with a terrace above.
200 m away · filed May 3, 2017 · Approved
14 Pine Hill Rd · Minor variance
To alter the existing three-storey detached dwelling by enclosing the rear third floor deck.
190 m away · filed Dec 2, 2016 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.