Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

100 St Hubert Ave

The City of Toronto has 7 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal to construct a new 2 storey SFD with integral garage and finished basement. See ZZC, COA, and Demo.

    Applied Jan 16, 2019 · issued Jan 30, 2019 · Permit 18 202497 HVA

    Inspections under way
  • Plumbing

    Revision 1. Ground floor (bay window eliminated, 16'-0" wide back door added, rear wood deck revised to concrete)Second floor (layout revised from 4 bedrooms to 3 bedrooms, laundry room added).

    Applied Oct 4, 2018 · issued Oct 9, 2018 · Permit 18 202497 PLB (revision 01)

    Revision issued
  • New house · New building

    Revision 1. Ground floor (bay window eliminated, 16'-0" wide back door added, rear wood deck revised to concrete)Second floor (layout revised from 4 bedrooms to 3 bedrooms, laundry room added).

    Applied Oct 4, 2018 · issued Oct 22, 2018 · Permit 18 202497 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing - Proposal to construct a new 2 storey SFD with integral garage and finished basement. See ZZC, COA, and Demo.

    Applied Jul 31, 2018 · issued Aug 15, 2018 · Permit 18 202497 PLB

    Inspections under way
  • New house · New building

    Proposal to construct a new 2 storey SFD with integral garage and finished basement. See ZZC, COA, and Demo.

    Applied Jul 31, 2018 · issued Aug 15, 2018 · 1 home added · Permit 18 202497 BLD

    Inspections under way
  • Demolition

    Proposal to demolish existing 1 storey SFD. See BLD for new dwelling.

    Applied Jul 31, 2018 · issued Aug 21, 2018 · completed Jan 3, 2019 · 1 home removed · Permit 18 202512 DEM

    Closed
  • Drains and site services

    Drain - Proposal to construct a new 2 storey SFD with integral garage and finished basement. See ZZC, COA, and Demo.

    Applied Jul 31, 2018 · issued Aug 15, 2018 · completed May 7, 2026 · Permit 18 202497 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new two-storey detached dwelling with an integral garage.

    Decision: Approved (hearing May 17, 2018)

    Filed Nov 22, 2017 · File A1294/17TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 63 St Hubert Ave · Minor variance

    To construct a new three-storey detached dwelling (basement level is considered the first level) with an integral garage, a front porch, a rear second storey covered deck, and a rear basement walkout. There will be a total of two residential dwelling units on this lot (one unit within the basement (first) level and one unit occupying the second and third levels).

    190 m away · filed Feb 12, 2026 · Approved

  • 1128 Greenwood Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition (which will be cantilevered on the south side), a front ground floor porch with stairs, and a rear basement walkout. There will be one parking space along the south side of the dwelling.

    200 m away · filed Sep 18, 2025 · Approved

  • 346 O'Connor Dr · Minor variance

    To construct a new one-storey ancillary building (two-car garage), in the rear yard, abutting Cadorna Avenue.

    110 m away · filed Sep 17, 2025 · Hearing scheduled

  • 37 Davies Cres · Minor variance

    To alter the existing one-storey detached dwelling by raising the height of the basement ceiling, constructing a west side and rear two-storey addition, a complete third storey addition, a basement walkout with stairs, and a rear second storey deck with stairs.

    240 m away · filed Aug 18, 2025 · Withdrawn

  • 364 O'Connor Dr · Minor variance

    To permit a vehicle washing establishment use (other than using automatic, coin-operated or ride-through car washing establishments or facilities) within the one-storey detached building containing the existing Automotive Service Centre.

    140 m away · filed Jul 23, 2025 · Approved

  • 105 St Hubert Ave · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, a front mezzanine living area above integral garage, a front covered porch with stairs and canopy, a rear first floor deck with stairs, a rear basement walkout and a front and rear second floor balcony. The existing rear detached garage will be demolished.

    50 m away · filed Jun 23, 2025 · Approved

  • 10 Plains Rd · Minor variance

    To construct a new two-storey detached dwelling (duplex) with a basement walkout. Also, to construct a one-storey ancillary building (garage) in the rear yard. There will be a total of two residential dwelling units on this lot.

    170 m away · filed Aug 23, 2024 · Approved

  • 104 Cadorna Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a rear first storey addition with a deck, a complete second storey addition, and a front porch.

    90 m away · filed May 22, 2024 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.