Toronto address · Ward 17, Don Valley North
1001 Sheppard Ave E
The City of Toronto has 77 building permits since 2017 (45 still open) and 3 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Fire and security upgrade · Electromagnetic locks
Proposed 9 maglocks in podium area
Applied Jul 29, 2026 · issued Jul 30, 2026 · Permit 26 211141 FSU
- Under review
New building
Revision 01: Clarification on egress stairs C-A and C-B. Clarification on high voltage room changed to storage room on the upper ground floor. Ceiling assembly revised to identified rooms not requiring acoustical batt insulation. Addition of remote annunciator panel in building B residential lobby LEAD - Construct a 31 storey tower with 565 residential units, a 6 level podium with mixed retail on the ground floor and a 5 storey underground parking garage - Tower B - Block 15
Applied Apr 29, 2026 · Permit 20 227069 BLD (revision 01)
- Cancelled
New building
Revision 01: Clarification on egress stairs C-A and C-B. Clarification on high voltage room changed to storage room on the upper ground floor. Ceiling assembly revised to identify rooms not requiring acoustical batt insulation. Addition of remote annunciator panel in building B residential lobby.Construct a 27 storey tower with 257 residential units - Tower A - Block 15
Applied Apr 29, 2026 · completed Apr 29, 2026 · Permit 20 226941 BLD (revision 01)
- Closed
Fire and security upgrade · Electromagnetic locks
Rev 01: addition of 1 maglock on 2nd floor of Block 11 - 25-27 Mcmahon DriveStand Alone and Miscellaneous Work application for Electromagnetic Locks
Applied May 13, 2024 · issued Jun 13, 2024 · completed Apr 15, 2025 · Permit 24 112389 FSU (revision 01)
- Closed
Fire and security upgrade · Electromagnetic locks
Stand Alone and Miscellaneous Work application for Electromagnetic Locks
Applied Feb 6, 2024 · issued Feb 20, 2024 · completed Apr 15, 2025 · Permit 24 112389 FSU
- Closed
Partial permit · Partial permit - structural framing
Part Permit - Construct a 19 storey tower with 168 residential units - Tower C - Block 15
Applied Jun 8, 2023 · issued Dec 17, 2024 · completed Dec 17, 2024 · Permit 20 227375 STR
- Approved
Alternative solution
The purpose of this alternative solution is to address the OBC requirement to install combination smoke and fire dampers at the duct openings that are part of the air-handling system that provides make-up air for the residential public corridors as required by Sentence 3.2.6.2.(5.1). On an alternative solution basis, it is proposed to install fire dampers only at the above noted duct openings.
Applied May 25, 2023 · completed Aug 28, 2023 · Permit 23 150708 ALT
- Approved
Alternative solution
The purpose of this alternative solution is to address the OBC requirement to install combination smoke and fire dampers at the duct openings that are part of the air-handling system that provides make-up air for the residential public corridors as required by Sentence 3.2.6.2.(5.1). On an alternative solution basis, it is proposed to install fire dampers only at the above noted duct openings.
Applied May 25, 2023 · completed Aug 28, 2023 · Permit 23 150722 ALT
- Approved
Alternative solution
The purpose of this alternative solution is to address the OBC requirement to install combination smoke and fire dampers at the duct openings that are part of the air-handling system that provides make-up air for the residential public corridors as required by Sentence 3.2.6.2.(5.1). On an alternative solution basis, it is proposed to install fire dampers only at the above noted duct openings.
Applied May 25, 2023 · completed Aug 28, 2023 · Permit 23 150718 ALT
- Cancelled
Conditional permit · Partial permit - structural framing
Conditional Permit - Structural Framing Part Permit - LEAD - Construct a 31 storey tower with 565 residential units, a 6 level podium with mixed retail on the ground floor and a 5 storey underground parking garage - Tower B - Block 15
Applied Mar 28, 2023 · issued Apr 28, 2023 · completed Nov 1, 2024 · Permit 20 227069 STR
- Closed
Partial permit · Partial permit - structural framing
Structural Framing Part Permit - Construct a 27 storey tower with 257 residential units - Tower A - Block 15
Applied Jan 12, 2023 · issued Jan 24, 2025 · completed Jan 24, 2025 · Permit 20 226941 STR
- Revision issued
New building
REVISION - alterations to sprinklers related to the alternative solution for protecting standpipe risers with duct wrapUnderground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium
Applied May 11, 2022 · issued Oct 3, 2025 · Permit 17 228465 BLD (revision 01)
Show 65 more permits
- Approved
Alternative solution
Proposed an alternative solution for protecting standpipe reisers with duct wrap.Please see attched summary of proposal application form.
Applied Jan 12, 2022 · completed Feb 4, 2022 · Permit 22 103228 ALT
- Closed
Conditional permit · Partial permit - foundation
Conditional Permit - Part Permit - LEAD - Construct a 31 storey tower with 565 residential units, a 6 level podium with mixed retail on the ground floor and a 5 storey underground parking garage - Tower B - Block 15
Applied Aug 17, 2021 · issued Nov 21, 2022 · completed May 5, 2023 · Permit 20 227069 FND
- Cancelled
Conditional permit · Partial permit - structural framing
Conditional Permit - Part Permit - LEAD PERMIT Construct a new 19 storey condominium with 160 units and 4 storey townhouses with15 units, (175 units total) attached 2 storey podium and a 5 storey underground parking garage
Applied Jun 29, 2021 · completed Jan 7, 2022 · Permit 18 229039 STR
- Cancelled
Conditional permit · Partial permit - structural framing
Conditional Permit - Part Permit - Construct a new 29 storey condominium, 291 units including and 4 storey townhouses of 17 units
Applied Jun 29, 2021 · completed Jan 7, 2022 · Permit 18 228869 STR
- Closed
Plumbing
Plumbing - LEAD PERMIT Construct a new 19 storey condominium with 160 units and 4 storey townhouses with15 units, (175 units total) attached 2 storey podium and a 5 storey underground parking garage
Applied Mar 5, 2021 · issued Jan 7, 2022 · completed Aug 13, 2026 · Permit 18 229039 PLB
- Closed
Heating and ventilation
HVAC - LEAD PERMIT Construct a new 19 storey condominium with 160 units and 4 storey townhouses with15 units, (175 units total) attached 2 storey podium and a 5 storey underground parking garage
Applied Mar 4, 2021 · issued May 26, 2022 · completed Sep 24, 2025 · Permit 18 229039 HVA
- Approved
Alternative solution
The purpose of this alternative solution is to address the OBC requirement to install fire hose cabinets within floor areas that are located not more than 5 m from every required exit serving the project.On an alternative solution basis, it is proposed to omit the installation of hose cabinets within floor areas. Rather, 65 mm hose connections will be installed within the exit stair shafts as required for this project in accordance with the 2015 National Building Code of Canada (NBC) Sentence 3.2.5.10.(1) and NFPA 14-2013 "Installation of Standpipe and Hose Systems". Additionally, 65 mm hose…
Applied Jan 6, 2021 · completed Mar 22, 2021 · Permit 21 101378 ALT
- Approved
Alternative solution
The purpose of this alternative solution is to address the OBC requirement to install fire hose cabinets within floor areas that are located not more than 5 m from every required exit serving the project.On an alternative solution basis, it is proposed to omit the installation of hose cabinets within floor areas. Rather, 65 mm hose connections will be installed within the exit stair shafts as required for this project in accordance with the 2015 National Building Code of Canada (NBC) Sentence 3.2.5.10.(1) and NFPA 14-2013 "Installation of Standpipe and Hose Systems". Additionally, 65 mm hose…
Applied Jan 6, 2021 · completed Mar 22, 2021 · Permit 21 101371 ALT
- Approved
Alternative solution
The purpose of this alternative solution is to address the OBC requirement to install fire hose cabinets within floor areas that are located not more than 5 m from every required exit serving the project.On an alternative solution basis, it is proposed to omit the installation of hose cabinets within floor areas. Rather, 65 mm hose connections will be installed within the exit stair shafts as required for this project in accordance with the 2015 National Building Code of Canada (NBC) Sentence 3.2.5.10.(1) and NFPA 14-2013 "Installation of Standpipe and Hose Systems". Additionally, 65 mm hose…
Applied Jan 5, 2021 · completed Mar 22, 2021 · Permit 21 101081 ALT
- Permit issued
Drains and site services
Drain - Construct a 27 storey tower with 245 residential units - Tower A - Block 15
Applied Dec 9, 2020 · issued Apr 28, 2023 · Permit 20 226941 DRN
- Permit issued
Drains and site services
Drain - Construct a 19 storey tower with 156 residential units - Tower C - Block 15
Applied Dec 9, 2020 · issued Aug 28, 2023 · Permit 20 227375 DRN
- Inspections under way
New building
Construct a 19 storey tower with 168 residential units - Tower C - Block 15REFER 19-155827 NNY 17SALead file 20-227069 BLD 00 NB
Applied Dec 9, 2020 · issued Dec 17, 2024 · 168 homes added · Permit 20 227375 BLD
- Inspections under way
Plumbing
Plumbing - Construct a 19 storey tower with 156 residential units - Tower C - Block 15
Applied Dec 9, 2020 · issued Oct 10, 2023 · Permit 20 227375 PLB
- Inspections under way
Heating and ventilation
HVAC - Construct a 19 storey tower with 156 residential units - Tower C - Block 15
Applied Dec 9, 2020 · issued Sep 21, 2023 · Permit 20 227375 HVA
- Permit issued
Drains and site services · Site service
Site Services - Construct a 31 storey tower with 270 residential units, a 6 level podium with mixed retail on the ground floor and a 5 storey underground parking garage - Tower b - Block 15
Applied Dec 8, 2020 · issued Mar 22, 2024 · Permit 20 227069 STS
- Inspections under way
Plumbing
Plumbing - Construct a 27 storey tower with 257 residential units - Tower A
Applied Dec 8, 2020 · issued Oct 10, 2023 · Permit 20 226941 PLB
- Inspections under way
Drains and site services
Drain - Construct a 31 storey tower with 270 residential units, a 6 level podium with mixed retail on the ground floor and a 5 storey underground parking garage - Tower b - Block 15
Applied Dec 8, 2020 · issued Dec 12, 2022 · Permit 20 227069 DRN
- Inspections under way
New building
Construct a 27 storey tower with 257 residential units - Tower A - Block 15
Applied Dec 8, 2020 · issued Feb 6, 2025 · 257 homes added · Permit 20 226941 BLD
- Inspections under way
Heating and ventilation
HVAC - Construct a 27 storey tower with 257 residential units - Tower A
Applied Dec 8, 2020 · issued Sep 21, 2023 · Permit 20 226941 HVA
- Inspections under way
Plumbing
Plumbing - Construct a 31 storey tower with 270 residential units, a 6 level podium with mixed retail on the ground floor and a 5 storey underground parking garage - Tower b - Block 15
Applied Dec 8, 2020 · issued Oct 10, 2023 · Permit 20 227069 PLB
- Inspections under way
Heating and ventilation
HVAC - Construct a 31 storey tower with 270 residential units, a 6 level podium with mixed retail on the ground floor and a 5 storey underground parking garage - Tower b - Block 15
Applied Dec 8, 2020 · issued Sep 21, 2023 · Permit 20 227069 HVA
- Inspections under way
New building
LEAD - Construct a 31 storey tower with 565 residential units, a 6 level podium with mixed retail on the ground floor and a 5 storey underground parking garage - Tower B - Block 15
Applied Dec 8, 2020 · issued Nov 4, 2024 · 565 homes added · Permit 20 227069 BLD
- Closed
Conditional permit · Partial permit - foundation
Conditional Permit - FND Part Permit - LEAD PERMIT Construct a new 19 storey condominium with 160 units and 4 storey townhouses with 15 units, attached 2 storey podium and a 5 storey underground parking garage
Applied May 19, 2020 · issued Feb 22, 2021 · completed Jan 6, 2022 · Permit 18 229039 FND
- Closed
Drains and site services · Site service
STS Part Permit - LEAD PERMIT Construct a new 19 storey condominium with 160 units and 4 storey townhouses with 15 units, attached 2 storey podium and a 5 storey underground parking garage
Applied May 15, 2020 · issued Jan 21, 2022 · completed Aug 13, 2026 · Permit 18 229039 STS
- Closed
Drains and site services
DRN - Part Permit - LEAD PERMIT Construct a new 19 storey condominium with 160 units and 4 storey townhouses with 15 units, attached 2 storey podium and a 5 storey underground parking garage
Applied May 15, 2020 · issued Mar 5, 2021 · completed Aug 13, 2026 · Permit 18 229039 DRN
- Approved
Alternative solution
The purpose of this alternative solution is to address the requirements of Article 3.2.6.3 to prevent the passage of contaminated air from one building into another during a fire. -Proposed measure for link between BLK 12 and Blk. 11 in parking level.
Applied Oct 9, 2019 · completed May 4, 2022 · Permit 19 234135 ALT
- Approved
Alternative solution
The purpose of this alternative solution is to address the OBC requirement to install fire hose cabinets within floor areas that are located not more than 5m from every required exit serving this Project.
Applied Oct 9, 2019 · completed Dec 19, 2019 · Permit 19 234124 ALT
- Approved
Alternative solution
AS-PIPING AND VICTAULIC STAINLESS STEEL FITTINGSPlumbing - Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium
Applied Sep 16, 2019 · completed Nov 8, 2019 · Permit 19 222024 ALT
- Closed
Addition or alteration · Shoring
Stand Alone Shoring and Excavation Permit for Soil Remediation - Block 15
Applied Jun 7, 2019 · issued Apr 17, 2020 · completed Feb 27, 2026 · Permit 19 167603 BLD
- Closed
Temporary structure · Certified tents
Proposal to erect a certified tent (15m x 25m - Cert # 14 251055). Oct 23-30/2018.
Applied Oct 18, 2018 · issued Oct 24, 2018 · completed Feb 28, 2019 · Permit 18 244921 TPS
- Inspections under way
Plumbing
Plumbing - Construct a new 29 storey condonminium and 4 storey townshouses
Applied Sep 24, 2018 · issued Jan 7, 2022 · Permit 18 228869 PLB
- Closed
Heating and ventilation
HVAC - Construct a new 29 storey condonminium and 4 storey townshouses
Applied Sep 24, 2018 · issued May 26, 2022 · completed Sep 24, 2025 · Permit 18 228869 HVA
- Inspections under way
New building
LEAD PERMIT Construct a new 19 storey condominium with 160 units and 4 storey townhouses with15 units, (175 units total) attached 2 storey podium and a 5 storey underground parking garage
Applied Sep 20, 2018 · issued Jul 20, 2022 · 175 homes added · Permit 18 229039 BLD
- Inspections under way
New building
Construct a new 29 storey condominium, 291 units including and 4 storey townhouses of 17 units
Applied Sep 20, 2018 · issued Jun 21, 2022 · 292 homes added · Permit 18 228869 BLD
- Closed
Conditional permit · Partial permit - foundation
Conditional Permit - Part Permit - Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium
Applied Sep 7, 2018 · issued May 7, 2019 · completed Dec 2, 2019 · Permit 17 228465 FND
- Permit issued
Drains and site services · Site service
Providing temporary site servicing connection to block 10. which will serve temporary site servicing for future bessarion community center required as per subdivison agreement. to parking lot
Applied Aug 17, 2018 · issued Aug 22, 2018 · Permit 18 211349 STS
- Closed
Partial permit · Partial permit - structural framing
Part Permit - LEAD Construct a 33 storey apartment with 312 units, (with a shared underground parking garage 17-228465), shared podium and a canopy for the outdoor amenity space
Applied Jul 16, 2018 · issued Feb 20, 2020 · completed Nov 20, 2020 · Permit 17 228864 STR
- Closed
Partial permit · Partial permit - structural framing
Part Permit - Construct a 36 storey apartment with 342 units, (with a shared underground garage 17-228465) and (shared podium - review with the West Tower) and a canopy for the outdoor amenity spaceSEE LEAD PERMIT 17 228864 BLD (west tower)
Applied Jul 16, 2018 · issued Dec 2, 2019 · completed Oct 8, 2020 · Permit 17 228861 STR
- Approved
Alternative solution
Alternative solution for underground N connection between 2 residential condos
Applied Jun 5, 2018 · completed Dec 5, 2018 · Permit 18 172249 ALT
- Permit issued
Addition or alteration · Shoring
Stand alone shoring and excavation for the remediation of the soil for Block 11
Applied Jun 4, 2018 · issued Nov 22, 2018 · Permit 18 171432 BLD
- Approved
Alternative solution
Stairs and standpipes Blk 12 A-J
Applied Dec 28, 2017 · completed Jul 27, 2018 · Permit 17 279757 ALT
- Closed
Conditional permit · Partial permit - structural framing
Conditional Permit - Part Permit - 1 storey building for park forestry and recreation department (Woodsy Park Pavilion Building) to store equipments, washroom and public winter lounge.
Applied Dec 27, 2017 · issued Jan 22, 2018 · completed Mar 20, 2018 · Permit 17 217167 STR
- Closed
Temporary structure · Other temporary tents
Install one 30'x60' pipe frame certified tent (14-251051) From Sept 29/17 to Oct 2/17Anchored with steel stakes and concrete blocks
Applied Sep 28, 2017 · issued Oct 13, 2017 · completed Feb 28, 2019 · Permit 17 240320 TPS
- Inspections under way
Addition or alteration · Shoring
Shoring and excavation for the remediation of the soil Block 12
Applied Sep 26, 2017 · issued Jan 10, 2018 · Permit 17 239130 BLD
- Cancelled
Partial permit · Partial permit - shoring
Part Permit - Shoring - Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium
Applied Sep 15, 2017 · completed Jun 4, 2018 · Permit 17 228465 SHO
- Permit issued
Drains and site services · Site service
Site Services - Drain - Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium
Applied Sep 14, 2017 · issued May 31, 2019 · Permit 17 228465 STS
- Inspections under way
Plumbing
Plumbing - Construct a 36 storey apartment with 342 units, (with a shared underground garage 17-228465) and (shared podium - review with the West Tower) and a canopy for the outdoor amenity space
Applied Sep 7, 2017 · issued Oct 29, 2019 · Permit 17 228861 PLB
- Closed
Heating and ventilation
HVAC - Construct a 33 storey apartment with 312 units, (with a shared underground parking garage 17-228465), shared podium and a canopy for the outdoor amenity space
Applied Sep 7, 2017 · issued Oct 29, 2019 · completed Sep 24, 2025 · Permit 17 228864 HVA
- Inspections under way
Heating and ventilation
HVAC - Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium
Applied Sep 7, 2017 · issued Jul 26, 2019 · Permit 17 228465 HVA
- Inspections under way
New building
Construct a 36 storey apartment with 342 units, with 20 stacked townhouses with common corridor thats intergrated with the East Tower, with a shared underground garage 17-228465) and (shared podium - review with the West Tower) and a canopy for the outdoor amenity spaceSEE LEAD PERMIT 17 228864 BLD (west tower)
Applied Sep 7, 2017 · issued Oct 8, 2020 · 362 homes added · Permit 17 228861 BLD
- Inspections under way
Drains and site services
Drain - Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium
Applied Sep 7, 2017 · issued May 7, 2019 · Permit 17 228465 DRN
- Inspections under way
Plumbing
Plumbing - Construct a 33 storey apartment with 312 units, (with a shared underground parking garage 17-228465), shared podium and a canopy for the outdoor amenity space
Applied Sep 7, 2017 · issued Oct 29, 2019 · Permit 17 228864 PLB
- Closed
Heating and ventilation
HVAC - Construct a 36 storey apartment with 342 units, (with a shared underground garage 17-228465) and (shared podium - review with the West Tower) and a canopy for the outdoor amenity space
Applied Sep 7, 2017 · issued Oct 29, 2019 · completed Sep 24, 2025 · Permit 17 228861 HVA
- Inspections under way
New building
LEAD Construct a 33 storey apartment with 312 units with 18 stacked townhouses with common corridor thats intergrated with the West Tower(with a shared underground parking garage 17-228465), shared podium and a canopy for the outdoor amenity space
Applied Sep 7, 2017 · issued Nov 20, 2020 · 332 homes added · Permit 17 228864 BLD
- Inspections under way
Plumbing
Plumbing - Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium
Applied Sep 7, 2017 · issued Jul 23, 2019 · Permit 17 228465 PLB
- Inspections under way
New building
Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium
Applied Sep 6, 2017 · issued Aug 28, 2020 · Permit 17 228465 BLD
- Closed
Plumbing
Plumbing - 1 storey building for park forestry and recreation department (Woodsy Park Pavilion Building) to store equipments, washroom and public winter lounge.
Applied Aug 16, 2017 · issued Jan 23, 2018 · completed Sep 27, 2019 · Permit 17 217167 PLB
- Closed
Heating and ventilation
HVAC - 1 storey building for park forestry and recreation department (Woodsy Park Pavilion Building) to store equipments, washroom and public winter lounge.
Applied Aug 16, 2017 · issued Jan 23, 2018 · completed Jul 22, 2025 · Permit 17 217167 HVA
- Closed
New building
1 storey building for park forestry and recreation department (Woodsy Park Pavilion Building) to store equipments, washroom and public winter lounge.
Applied Aug 16, 2017 · issued Mar 20, 2018 · completed Sep 30, 2025 · Permit 17 217167 BLD
- Closed
Drains and site services · Site service
Drain - 1 storey building for park forestry and recreation department (Woodsy Park Pavilion Building) to store equipments, washroom and public winter lounge.
Applied Aug 16, 2017 · issued Jun 15, 2018 · completed Aug 13, 2026 · Permit 17 217167 STS
- Closed
Drains and site services
Drain - 1 storey building for park forestry and recreation department (Woodsy Park Pavilion Building) to store equipments, washroom and public winter lounge.
Applied Aug 16, 2017 · issued Jan 23, 2018 · completed Aug 13, 2026 · Permit 17 217167 DRN
- Cancelled
Alternative solution
Alternative Solution in connection to active Building Permit 13 256229 BLD East Tower for standpipe and hose system.
Applied Apr 27, 2017 · completed May 2, 2017 · Permit 17 150614 ALT
- Closed (dormant)
Plumbing
Plumbing - One storey office/sales pavilion with basement - Concord Park Presentation Centre
Applied Mar 8, 2010 · issued Jul 14, 2010 · completed Jun 8, 2026 · Permit 09 173647 PLB
- Inspections under way
Heating and ventilation
HVAC - One storey office/sales pavilion with basement - Concord Park Presentation Centre
Applied Feb 25, 2010 · issued Mar 9, 2010 · Permit 09 173647 HVA
- Inspections under way
New building
One storey office/sales pavilion with basement - Concord Park Presentation Centre
Applied Sep 28, 2009 · issued Dec 8, 2009 · Permit 09 173647 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New NR building
A mixed use building with three towers (19, 31 and 27 storeys) and a total gross floor area of 82,241.56 sq.m. 990 dwelling units, 754 bicycle parking spaces, 1,079 parking spaces and 3 loading space are proposed.
Decision: Approved (hearing Mar 11, 2021)
Filed Dec 15, 2020 · File A0670/20NY
- Closed
Minor variance · Other
To legalize and maintain the existing undersized underground parking spaces.
Decision: Approved (hearing Feb 7, 2019)
Filed Dec 6, 2018 · File A0832/18NY
- Closed
Minor variance · Other
To construct two towers of 33 and 36 storeys linked by a podium containing lobby and amenity space together with townhouse units, total 692 dwelling units and 674 parking spaces.
Decision: Approved (hearing Sep 14, 2017)
Filed Jun 29, 2017 · File A0634/17NY
What’s planned nearby
Development sites within 500 m
- Under review
63-75 Ethennonnhawahstihnen' Lane and 1001 Sheppard Avenue East
39 storeys · 867 homes · Mixed use
90 m away · Site plan · Under review · filed Mar 25, 2024
- Approved
1001-1019 Sheppard Avenue East
31 storeys · 990 homes · Residential
160 m away · Condominium · Approved · filed May 29, 2025
- Under review
49 storeys · 1,184 homes · Residential
220 m away · Rezoning · Under review · filed Mar 17, 2022
- Under appeal
32 storeys · 705 homes · Mixed use
270 m away · Rezoning · Under appeal · filed Oct 14, 2022
- Under review
48 storeys · 1,238 homes · Mixed use
370 m away · Site plan · Under review · filed Mar 21, 2024
- Under review
37 storeys · 789 homes · Residential
390 m away · Rezoning · Under review · filed May 7, 2026
Neighbours’ Committee of Adjustment files within 250 m
40 Esther Shiner Blvd · Minor variance
To request relief from the provisions of the former City of North York Zoning By-law No. 7625, as amended by By-law No. 959-2013(OMB), to facilitate the sharing of the non-residential and residential visitor parking spaces of the mixed-use development.
220 m away · filed Sep 15, 2025 · Approved
1009 Sheppard Ave E · Consent
To permit non-exclusive easements for pedestrian and vehicular access over portions of Canadian Tire Corporation (CTC) land, and Canadian Tire Properties Inc. (CTPI) land, in favour of the Concord site (25, 35, 55, 65 and 75 Billes Heights and 18, 20, 28, 32, 38, 62 and 68 Esther Shiner Boulevard). Related planning files (Concord site). Related planning files include A0670/20NY, and 19 155827 NY 17 SA.
120 m away · filed Feb 16, 2022 · Approved
780 Sheppard Ave E · Minor variance
The proposal is to permit a stacked townhouse development at the rear of the site. Please be advised the subject property went before the Committee of Adjustment on July 23, 2014, DEFERRED SINE DIE in order to allow the applicant an opportunity to resolve the issues regarding the ownership of a portion of the east lot line.
200 m away · filed May 29, 2014 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.