Toronto address · Ward 17, Don Valley North

1001 Sheppard Ave E

The City of Toronto has 77 building permits since 2017 (45 still open) and 3 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade · Electromagnetic locks

    Proposed 9 maglocks in podium area

    Applied Jul 29, 2026 · issued Jul 30, 2026 · Permit 26 211141 FSU

    Permit issued
  • New building

    Revision 01: Clarification on egress stairs C-A and C-B. Clarification on high voltage room changed to storage room on the upper ground floor. Ceiling assembly revised to identified rooms not requiring acoustical batt insulation. Addition of remote annunciator panel in building B residential lobby LEAD - Construct a 31 storey tower with 565 residential units, a 6 level podium with mixed retail on the ground floor and a 5 storey underground parking garage - Tower B - Block 15

    Applied Apr 29, 2026 · Permit 20 227069 BLD (revision 01)

    Under review
  • New building

    Revision 01: Clarification on egress stairs C-A and C-B. Clarification on high voltage room changed to storage room on the upper ground floor. Ceiling assembly revised to identify rooms not requiring acoustical batt insulation. Addition of remote annunciator panel in building B residential lobby.Construct a 27 storey tower with 257 residential units - Tower A - Block 15

    Applied Apr 29, 2026 · completed Apr 29, 2026 · Permit 20 226941 BLD (revision 01)

    Cancelled
  • Fire and security upgrade · Electromagnetic locks

    Rev 01: addition of 1 maglock on 2nd floor of Block 11 - 25-27 Mcmahon DriveStand Alone and Miscellaneous Work application for Electromagnetic Locks

    Applied May 13, 2024 · issued Jun 13, 2024 · completed Apr 15, 2025 · Permit 24 112389 FSU (revision 01)

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Stand Alone and Miscellaneous Work application for Electromagnetic Locks

    Applied Feb 6, 2024 · issued Feb 20, 2024 · completed Apr 15, 2025 · Permit 24 112389 FSU

    Closed
  • Partial permit · Partial permit - structural framing

    Part Permit - Construct a 19 storey tower with 168 residential units - Tower C - Block 15

    Applied Jun 8, 2023 · issued Dec 17, 2024 · completed Dec 17, 2024 · Permit 20 227375 STR

    Closed
  • Alternative solution

    The purpose of this alternative solution is to address the OBC requirement to install combination smoke and fire dampers at the duct openings that are part of the air-handling system that provides make-up air for the residential public corridors as required by Sentence 3.2.6.2.(5.1). On an alternative solution basis, it is proposed to install fire dampers only at the above noted duct openings.

    Applied May 25, 2023 · completed Aug 28, 2023 · Permit 23 150708 ALT

    Approved
  • Alternative solution

    The purpose of this alternative solution is to address the OBC requirement to install combination smoke and fire dampers at the duct openings that are part of the air-handling system that provides make-up air for the residential public corridors as required by Sentence 3.2.6.2.(5.1). On an alternative solution basis, it is proposed to install fire dampers only at the above noted duct openings.

    Applied May 25, 2023 · completed Aug 28, 2023 · Permit 23 150722 ALT

    Approved
  • Alternative solution

    The purpose of this alternative solution is to address the OBC requirement to install combination smoke and fire dampers at the duct openings that are part of the air-handling system that provides make-up air for the residential public corridors as required by Sentence 3.2.6.2.(5.1). On an alternative solution basis, it is proposed to install fire dampers only at the above noted duct openings.

    Applied May 25, 2023 · completed Aug 28, 2023 · Permit 23 150718 ALT

    Approved
  • Conditional permit · Partial permit - structural framing

    Conditional Permit - Structural Framing Part Permit - LEAD - Construct a 31 storey tower with 565 residential units, a 6 level podium with mixed retail on the ground floor and a 5 storey underground parking garage - Tower B - Block 15

    Applied Mar 28, 2023 · issued Apr 28, 2023 · completed Nov 1, 2024 · Permit 20 227069 STR

    Cancelled
  • Partial permit · Partial permit - structural framing

    Structural Framing Part Permit - Construct a 27 storey tower with 257 residential units - Tower A - Block 15

    Applied Jan 12, 2023 · issued Jan 24, 2025 · completed Jan 24, 2025 · Permit 20 226941 STR

    Closed
  • New building

    REVISION - alterations to sprinklers related to the alternative solution for protecting standpipe risers with duct wrapUnderground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium

    Applied May 11, 2022 · issued Oct 3, 2025 · Permit 17 228465 BLD (revision 01)

    Revision issued
Show 65 more permits
  • Alternative solution

    Proposed an alternative solution for protecting standpipe reisers with duct wrap.Please see attched summary of proposal application form.

    Applied Jan 12, 2022 · completed Feb 4, 2022 · Permit 22 103228 ALT

    Approved
  • Conditional permit · Partial permit - foundation

    Conditional Permit - Part Permit - LEAD - Construct a 31 storey tower with 565 residential units, a 6 level podium with mixed retail on the ground floor and a 5 storey underground parking garage - Tower B - Block 15

    Applied Aug 17, 2021 · issued Nov 21, 2022 · completed May 5, 2023 · Permit 20 227069 FND

    Closed
  • Conditional permit · Partial permit - structural framing

    Conditional Permit - Part Permit - LEAD PERMIT Construct a new 19 storey condominium with 160 units and 4 storey townhouses with15 units, (175 units total) attached 2 storey podium and a 5 storey underground parking garage

    Applied Jun 29, 2021 · completed Jan 7, 2022 · Permit 18 229039 STR

    Cancelled
  • Conditional permit · Partial permit - structural framing

    Conditional Permit - Part Permit - Construct a new 29 storey condominium, 291 units including and 4 storey townhouses of 17 units

    Applied Jun 29, 2021 · completed Jan 7, 2022 · Permit 18 228869 STR

    Cancelled
  • Plumbing

    Plumbing - LEAD PERMIT Construct a new 19 storey condominium with 160 units and 4 storey townhouses with15 units, (175 units total) attached 2 storey podium and a 5 storey underground parking garage

    Applied Mar 5, 2021 · issued Jan 7, 2022 · completed Aug 13, 2026 · Permit 18 229039 PLB

    Closed
  • Heating and ventilation

    HVAC - LEAD PERMIT Construct a new 19 storey condominium with 160 units and 4 storey townhouses with15 units, (175 units total) attached 2 storey podium and a 5 storey underground parking garage

    Applied Mar 4, 2021 · issued May 26, 2022 · completed Sep 24, 2025 · Permit 18 229039 HVA

    Closed
  • Alternative solution

    The purpose of this alternative solution is to address the OBC requirement to install fire hose cabinets within floor areas that are located not more than 5 m from every required exit serving the project.On an alternative solution basis, it is proposed to omit the installation of hose cabinets within floor areas. Rather, 65 mm hose connections will be installed within the exit stair shafts as required for this project in accordance with the 2015 National Building Code of Canada (NBC) Sentence 3.2.5.10.(1) and NFPA 14-2013 "Installation of Standpipe and Hose Systems". Additionally, 65 mm hose…

    Applied Jan 6, 2021 · completed Mar 22, 2021 · Permit 21 101378 ALT

    Approved
  • Alternative solution

    The purpose of this alternative solution is to address the OBC requirement to install fire hose cabinets within floor areas that are located not more than 5 m from every required exit serving the project.On an alternative solution basis, it is proposed to omit the installation of hose cabinets within floor areas. Rather, 65 mm hose connections will be installed within the exit stair shafts as required for this project in accordance with the 2015 National Building Code of Canada (NBC) Sentence 3.2.5.10.(1) and NFPA 14-2013 "Installation of Standpipe and Hose Systems". Additionally, 65 mm hose…

    Applied Jan 6, 2021 · completed Mar 22, 2021 · Permit 21 101371 ALT

    Approved
  • Alternative solution

    The purpose of this alternative solution is to address the OBC requirement to install fire hose cabinets within floor areas that are located not more than 5 m from every required exit serving the project.On an alternative solution basis, it is proposed to omit the installation of hose cabinets within floor areas. Rather, 65 mm hose connections will be installed within the exit stair shafts as required for this project in accordance with the 2015 National Building Code of Canada (NBC) Sentence 3.2.5.10.(1) and NFPA 14-2013 "Installation of Standpipe and Hose Systems". Additionally, 65 mm hose…

    Applied Jan 5, 2021 · completed Mar 22, 2021 · Permit 21 101081 ALT

    Approved
  • Drains and site services

    Drain - Construct a 27 storey tower with 245 residential units - Tower A - Block 15

    Applied Dec 9, 2020 · issued Apr 28, 2023 · Permit 20 226941 DRN

    Permit issued
  • Drains and site services

    Drain - Construct a 19 storey tower with 156 residential units - Tower C - Block 15

    Applied Dec 9, 2020 · issued Aug 28, 2023 · Permit 20 227375 DRN

    Permit issued
  • New building

    Construct a 19 storey tower with 168 residential units - Tower C - Block 15REFER 19-155827 NNY 17SALead file 20-227069 BLD 00 NB

    Applied Dec 9, 2020 · issued Dec 17, 2024 · 168 homes added · Permit 20 227375 BLD

    Inspections under way
  • Plumbing

    Plumbing - Construct a 19 storey tower with 156 residential units - Tower C - Block 15

    Applied Dec 9, 2020 · issued Oct 10, 2023 · Permit 20 227375 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Construct a 19 storey tower with 156 residential units - Tower C - Block 15

    Applied Dec 9, 2020 · issued Sep 21, 2023 · Permit 20 227375 HVA

    Inspections under way
  • Drains and site services · Site service

    Site Services - Construct a 31 storey tower with 270 residential units, a 6 level podium with mixed retail on the ground floor and a 5 storey underground parking garage - Tower b - Block 15

    Applied Dec 8, 2020 · issued Mar 22, 2024 · Permit 20 227069 STS

    Permit issued
  • Plumbing

    Plumbing - Construct a 27 storey tower with 257 residential units - Tower A

    Applied Dec 8, 2020 · issued Oct 10, 2023 · Permit 20 226941 PLB

    Inspections under way
  • Drains and site services

    Drain - Construct a 31 storey tower with 270 residential units, a 6 level podium with mixed retail on the ground floor and a 5 storey underground parking garage - Tower b - Block 15

    Applied Dec 8, 2020 · issued Dec 12, 2022 · Permit 20 227069 DRN

    Inspections under way
  • New building

    Construct a 27 storey tower with 257 residential units - Tower A - Block 15

    Applied Dec 8, 2020 · issued Feb 6, 2025 · 257 homes added · Permit 20 226941 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Construct a 27 storey tower with 257 residential units - Tower A

    Applied Dec 8, 2020 · issued Sep 21, 2023 · Permit 20 226941 HVA

    Inspections under way
  • Plumbing

    Plumbing - Construct a 31 storey tower with 270 residential units, a 6 level podium with mixed retail on the ground floor and a 5 storey underground parking garage - Tower b - Block 15

    Applied Dec 8, 2020 · issued Oct 10, 2023 · Permit 20 227069 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Construct a 31 storey tower with 270 residential units, a 6 level podium with mixed retail on the ground floor and a 5 storey underground parking garage - Tower b - Block 15

    Applied Dec 8, 2020 · issued Sep 21, 2023 · Permit 20 227069 HVA

    Inspections under way
  • New building

    LEAD - Construct a 31 storey tower with 565 residential units, a 6 level podium with mixed retail on the ground floor and a 5 storey underground parking garage - Tower B - Block 15

    Applied Dec 8, 2020 · issued Nov 4, 2024 · 565 homes added · Permit 20 227069 BLD

    Inspections under way
  • Conditional permit · Partial permit - foundation

    Conditional Permit - FND Part Permit - LEAD PERMIT Construct a new 19 storey condominium with 160 units and 4 storey townhouses with 15 units, attached 2 storey podium and a 5 storey underground parking garage

    Applied May 19, 2020 · issued Feb 22, 2021 · completed Jan 6, 2022 · Permit 18 229039 FND

    Closed
  • Drains and site services · Site service

    STS Part Permit - LEAD PERMIT Construct a new 19 storey condominium with 160 units and 4 storey townhouses with 15 units, attached 2 storey podium and a 5 storey underground parking garage

    Applied May 15, 2020 · issued Jan 21, 2022 · completed Aug 13, 2026 · Permit 18 229039 STS

    Closed
  • Drains and site services

    DRN - Part Permit - LEAD PERMIT Construct a new 19 storey condominium with 160 units and 4 storey townhouses with 15 units, attached 2 storey podium and a 5 storey underground parking garage

    Applied May 15, 2020 · issued Mar 5, 2021 · completed Aug 13, 2026 · Permit 18 229039 DRN

    Closed
  • Alternative solution

    The purpose of this alternative solution is to address the requirements of Article 3.2.6.3 to prevent the passage of contaminated air from one building into another during a fire. -Proposed measure for link between BLK 12 and Blk. 11 in parking level.

    Applied Oct 9, 2019 · completed May 4, 2022 · Permit 19 234135 ALT

    Approved
  • Alternative solution

    The purpose of this alternative solution is to address the OBC requirement to install fire hose cabinets within floor areas that are located not more than 5m from every required exit serving this Project.

    Applied Oct 9, 2019 · completed Dec 19, 2019 · Permit 19 234124 ALT

    Approved
  • Alternative solution

    AS-PIPING AND VICTAULIC STAINLESS STEEL FITTINGSPlumbing - Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium

    Applied Sep 16, 2019 · completed Nov 8, 2019 · Permit 19 222024 ALT

    Approved
  • Addition or alteration · Shoring

    Stand Alone Shoring and Excavation Permit for Soil Remediation - Block 15

    Applied Jun 7, 2019 · issued Apr 17, 2020 · completed Feb 27, 2026 · Permit 19 167603 BLD

    Closed
  • Temporary structure · Certified tents

    Proposal to erect a certified tent (15m x 25m - Cert # 14 251055). Oct 23-30/2018.

    Applied Oct 18, 2018 · issued Oct 24, 2018 · completed Feb 28, 2019 · Permit 18 244921 TPS

    Closed
  • Plumbing

    Plumbing - Construct a new 29 storey condonminium and 4 storey townshouses

    Applied Sep 24, 2018 · issued Jan 7, 2022 · Permit 18 228869 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Construct a new 29 storey condonminium and 4 storey townshouses

    Applied Sep 24, 2018 · issued May 26, 2022 · completed Sep 24, 2025 · Permit 18 228869 HVA

    Closed
  • New building

    LEAD PERMIT Construct a new 19 storey condominium with 160 units and 4 storey townhouses with15 units, (175 units total) attached 2 storey podium and a 5 storey underground parking garage

    Applied Sep 20, 2018 · issued Jul 20, 2022 · 175 homes added · Permit 18 229039 BLD

    Inspections under way
  • New building

    Construct a new 29 storey condominium, 291 units including and 4 storey townhouses of 17 units

    Applied Sep 20, 2018 · issued Jun 21, 2022 · 292 homes added · Permit 18 228869 BLD

    Inspections under way
  • Conditional permit · Partial permit - foundation

    Conditional Permit - Part Permit - Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium

    Applied Sep 7, 2018 · issued May 7, 2019 · completed Dec 2, 2019 · Permit 17 228465 FND

    Closed
  • Drains and site services · Site service

    Providing temporary site servicing connection to block 10. which will serve temporary site servicing for future bessarion community center required as per subdivison agreement. to parking lot

    Applied Aug 17, 2018 · issued Aug 22, 2018 · Permit 18 211349 STS

    Permit issued
  • Partial permit · Partial permit - structural framing

    Part Permit - LEAD Construct a 33 storey apartment with 312 units, (with a shared underground parking garage 17-228465), shared podium and a canopy for the outdoor amenity space

    Applied Jul 16, 2018 · issued Feb 20, 2020 · completed Nov 20, 2020 · Permit 17 228864 STR

    Closed
  • Partial permit · Partial permit - structural framing

    Part Permit - Construct a 36 storey apartment with 342 units, (with a shared underground garage 17-228465) and (shared podium - review with the West Tower) and a canopy for the outdoor amenity spaceSEE LEAD PERMIT 17 228864 BLD (west tower)

    Applied Jul 16, 2018 · issued Dec 2, 2019 · completed Oct 8, 2020 · Permit 17 228861 STR

    Closed
  • Alternative solution

    Alternative solution for underground N connection between 2 residential condos

    Applied Jun 5, 2018 · completed Dec 5, 2018 · Permit 18 172249 ALT

    Approved
  • Addition or alteration · Shoring

    Stand alone shoring and excavation for the remediation of the soil for Block 11

    Applied Jun 4, 2018 · issued Nov 22, 2018 · Permit 18 171432 BLD

    Permit issued
  • Alternative solution

    Stairs and standpipes Blk 12 A-J

    Applied Dec 28, 2017 · completed Jul 27, 2018 · Permit 17 279757 ALT

    Approved
  • Conditional permit · Partial permit - structural framing

    Conditional Permit - Part Permit - 1 storey building for park forestry and recreation department (Woodsy Park Pavilion Building) to store equipments, washroom and public winter lounge.

    Applied Dec 27, 2017 · issued Jan 22, 2018 · completed Mar 20, 2018 · Permit 17 217167 STR

    Closed
  • Temporary structure · Other temporary tents

    Install one 30'x60' pipe frame certified tent (14-251051) From Sept 29/17 to Oct 2/17Anchored with steel stakes and concrete blocks

    Applied Sep 28, 2017 · issued Oct 13, 2017 · completed Feb 28, 2019 · Permit 17 240320 TPS

    Closed
  • Addition or alteration · Shoring

    Shoring and excavation for the remediation of the soil Block 12

    Applied Sep 26, 2017 · issued Jan 10, 2018 · Permit 17 239130 BLD

    Inspections under way
  • Partial permit · Partial permit - shoring

    Part Permit - Shoring - Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium

    Applied Sep 15, 2017 · completed Jun 4, 2018 · Permit 17 228465 SHO

    Cancelled
  • Drains and site services · Site service

    Site Services - Drain - Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium

    Applied Sep 14, 2017 · issued May 31, 2019 · Permit 17 228465 STS

    Permit issued
  • Plumbing

    Plumbing - Construct a 36 storey apartment with 342 units, (with a shared underground garage 17-228465) and (shared podium - review with the West Tower) and a canopy for the outdoor amenity space

    Applied Sep 7, 2017 · issued Oct 29, 2019 · Permit 17 228861 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Construct a 33 storey apartment with 312 units, (with a shared underground parking garage 17-228465), shared podium and a canopy for the outdoor amenity space

    Applied Sep 7, 2017 · issued Oct 29, 2019 · completed Sep 24, 2025 · Permit 17 228864 HVA

    Closed
  • Heating and ventilation

    HVAC - Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium

    Applied Sep 7, 2017 · issued Jul 26, 2019 · Permit 17 228465 HVA

    Inspections under way
  • New building

    Construct a 36 storey apartment with 342 units, with 20 stacked townhouses with common corridor thats intergrated with the East Tower, with a shared underground garage 17-228465) and (shared podium - review with the West Tower) and a canopy for the outdoor amenity spaceSEE LEAD PERMIT 17 228864 BLD (west tower)

    Applied Sep 7, 2017 · issued Oct 8, 2020 · 362 homes added · Permit 17 228861 BLD

    Inspections under way
  • Drains and site services

    Drain - Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium

    Applied Sep 7, 2017 · issued May 7, 2019 · Permit 17 228465 DRN

    Inspections under way
  • Plumbing

    Plumbing - Construct a 33 storey apartment with 312 units, (with a shared underground parking garage 17-228465), shared podium and a canopy for the outdoor amenity space

    Applied Sep 7, 2017 · issued Oct 29, 2019 · Permit 17 228864 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Construct a 36 storey apartment with 342 units, (with a shared underground garage 17-228465) and (shared podium - review with the West Tower) and a canopy for the outdoor amenity space

    Applied Sep 7, 2017 · issued Oct 29, 2019 · completed Sep 24, 2025 · Permit 17 228861 HVA

    Closed
  • New building

    LEAD Construct a 33 storey apartment with 312 units with 18 stacked townhouses with common corridor thats intergrated with the West Tower(with a shared underground parking garage 17-228465), shared podium and a canopy for the outdoor amenity space

    Applied Sep 7, 2017 · issued Nov 20, 2020 · 332 homes added · Permit 17 228864 BLD

    Inspections under way
  • Plumbing

    Plumbing - Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium

    Applied Sep 7, 2017 · issued Jul 23, 2019 · Permit 17 228465 PLB

    Inspections under way
  • New building

    Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podium

    Applied Sep 6, 2017 · issued Aug 28, 2020 · Permit 17 228465 BLD

    Inspections under way
  • Plumbing

    Plumbing - 1 storey building for park forestry and recreation department (Woodsy Park Pavilion Building) to store equipments, washroom and public winter lounge.

    Applied Aug 16, 2017 · issued Jan 23, 2018 · completed Sep 27, 2019 · Permit 17 217167 PLB

    Closed
  • Heating and ventilation

    HVAC - 1 storey building for park forestry and recreation department (Woodsy Park Pavilion Building) to store equipments, washroom and public winter lounge.

    Applied Aug 16, 2017 · issued Jan 23, 2018 · completed Jul 22, 2025 · Permit 17 217167 HVA

    Closed
  • New building

    1 storey building for park forestry and recreation department (Woodsy Park Pavilion Building) to store equipments, washroom and public winter lounge.

    Applied Aug 16, 2017 · issued Mar 20, 2018 · completed Sep 30, 2025 · Permit 17 217167 BLD

    Closed
  • Drains and site services · Site service

    Drain - 1 storey building for park forestry and recreation department (Woodsy Park Pavilion Building) to store equipments, washroom and public winter lounge.

    Applied Aug 16, 2017 · issued Jun 15, 2018 · completed Aug 13, 2026 · Permit 17 217167 STS

    Closed
  • Drains and site services

    Drain - 1 storey building for park forestry and recreation department (Woodsy Park Pavilion Building) to store equipments, washroom and public winter lounge.

    Applied Aug 16, 2017 · issued Jan 23, 2018 · completed Aug 13, 2026 · Permit 17 217167 DRN

    Closed
  • Alternative solution

    Alternative Solution in connection to active Building Permit 13 256229 BLD East Tower for standpipe and hose system.

    Applied Apr 27, 2017 · completed May 2, 2017 · Permit 17 150614 ALT

    Cancelled
  • Plumbing

    Plumbing - One storey office/sales pavilion with basement - Concord Park Presentation Centre

    Applied Mar 8, 2010 · issued Jul 14, 2010 · completed Jun 8, 2026 · Permit 09 173647 PLB

    Closed (dormant)
  • Heating and ventilation

    HVAC - One storey office/sales pavilion with basement - Concord Park Presentation Centre

    Applied Feb 25, 2010 · issued Mar 9, 2010 · Permit 09 173647 HVA

    Inspections under way
  • New building

    One storey office/sales pavilion with basement - Concord Park Presentation Centre

    Applied Sep 28, 2009 · issued Dec 8, 2009 · Permit 09 173647 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New NR building

    A mixed use building with three towers (19, 31 and 27 storeys) and a total gross floor area of 82,241.56 sq.m. 990 dwelling units, 754 bicycle parking spaces, 1,079 parking spaces and 3 loading space are proposed.

    Decision: Approved (hearing Mar 11, 2021)

    Filed Dec 15, 2020 · File A0670/20NY

    Closed
  • Minor variance · Other

    To legalize and maintain the existing undersized underground parking spaces.

    Decision: Approved (hearing Feb 7, 2019)

    Filed Dec 6, 2018 · File A0832/18NY

    Closed
  • Minor variance · Other

    To construct two towers of 33 and 36 storeys linked by a podium containing lobby and amenity space together with townhouse units, total 692 dwelling units and 674 parking spaces.

    Decision: Approved (hearing Sep 14, 2017)

    Filed Jun 29, 2017 · File A0634/17NY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 40 Esther Shiner Blvd · Minor variance

    To request relief from the provisions of the former City of North York Zoning By-law No. 7625, as amended by By-law No. 959-2013(OMB), to facilitate the sharing of the non-residential and residential visitor parking spaces of the mixed-use development.

    220 m away · filed Sep 15, 2025 · Approved

  • 1009 Sheppard Ave E · Consent

    To permit non-exclusive easements for pedestrian and vehicular access over portions of Canadian Tire Corporation (CTC) land, and Canadian Tire Properties Inc. (CTPI) land, in favour of the Concord site (25, 35, 55, 65 and 75 Billes Heights and 18, 20, 28, 32, 38, 62 and 68 Esther Shiner Boulevard). Related planning files (Concord site). Related planning files include A0670/20NY, and 19 155827 NY 17 SA.

    120 m away · filed Feb 16, 2022 · Approved

  • 780 Sheppard Ave E · Minor variance

    The proposal is to permit a stacked townhouse development at the rear of the site. Please be advised the subject property went before the Committee of Adjustment on July 23, 2014, DEFERRED SINE DIE in order to allow the applicant an opportunity to resolve the issues regarding the ownership of a portion of the east lot line.

    200 m away · filed May 29, 2014 · Refused

Everything planned in Don Valley North

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.