Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

101 Heath St W

The City of Toronto has 1 building permit since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Demolition

    The demolition and removal of any Hazardous Materials such as the disposing of abestos, abestos floor tiles and drywall joint compound. The demolition will also encompass the use of a back fill to remove of all of the rubble from the site. The basement slab to be broken up for drainage purposes. The foundation walls will be cut down below grade and the site will be left to flat for shoring purposes. (21 180120 DEM 00 DM)

    Applied Jul 6, 2021 · issued Jan 30, 2024 · 1 home removed · Permit 21 180101 DEM

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a three-storey apartment building with an underground parking garage, a front yard transformer, front first storey platforms, a front third storey balcony, east and west side second and third storey balconies, and a rooftop mechanical equipment enclosure.

    Decision: Approved (hearing Dec 8, 2021)

    Filed Mar 2, 2021 · File A0266/21TEY

    OMB appeal

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 111 Heath St W · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a one-storey addition along the east side and rear south walls of the dwelling and a side (west) basement walkout.

    70 m away · filed Jan 8, 2024 · Approved

  • 75 Lonsdale Rd · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front two-storey addition over the existing integral garage.

    230 m away · filed May 12, 2023 · Approved

  • 7-9 Bryce Ave · Minor variance

    To construct a new three-storey detached dwelling with an integral garage, front and rear covered porches, a rear third storey balcony, and an in-ground swimming pool.

    240 m away · filed Nov 9, 2022 · Approved

  • 108 Heath St W · Minor variance

    To construct a new three-storey semi-detached dwelling with an integral garage, a front porch, a rear ground level deck, and a rear basement walkout.

    60 m away · filed Jan 28, 2022 · Approved

  • 108 Heath St W · Minor variance

    To construct a new three-storey semi-detached dwelling with an integral garage, a front porch, a rear ground level deck, and a rear basement walkout.

    60 m away · filed Jan 28, 2022 · Approved

  • 108 Heath St W · Consent

    To obtain consent to sever the property into two undersized residential lots.

    60 m away · filed Jan 28, 2022 · Approved

  • 34 Oriole Gdns · Minor variance

    To legalize and maintain the rear one-storey detached ancillary building converted from a garage to a cabana and extended without the benefit of a building permit. Also, to permit a parking space on the west side of the existing dwelling.

    250 m away · filed Oct 28, 2021 · Approved

  • 70 Oriole Rd · Minor variance

    To alter the existing 2½-storey detached dwelling by constructing a rear second storey deck and to construct a new one-storey ancillary building in the rear yard.

    160 m away · filed Jun 1, 2021 · Application withdrawn

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.