Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

102 Stayner Ave

The City of Toronto has 8 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Addition(s)

    Proposed to build a rear garage to be attched to existing residential dwelling. Dwelling is under construction file No. 21-212530.

    Applied Aug 2, 2023 · issued Apr 8, 2024 · completed Aug 16, 2024 · Permit 23 183354 BLD

    Closed
  • Small residential project · Addition(s)

    construct addition over existing 1 1/2 storey dwellingREV. 01: to remove one of the interior wall(The wall beside the kitchen).

    Applied Nov 1, 2022 · completed Nov 18, 2022 · Permit 21 212530 BLD (revision 01)

    Cancelled
  • Heating and ventilation

    HVAC - To construct two storey addition to existing dwelling, interior alterations and new deck

    Applied Jun 20, 2022 · completed Jun 27, 2022 · Permit 22 164987 HVA

    Cancelled
  • Small residential project · Multiple projects

    To construct two storey addition to existing dwelling, interior alterations and new deck

    Applied Jun 20, 2022 · completed Jun 27, 2022 · Permit 22 164987 BLD

    Cancelled
  • Plumbing

    Plumbing - To construct two storey addition to existing dwelling, interior alterations and new deck

    Applied Jun 20, 2022 · completed Jun 27, 2022 · Permit 22 164987 PLB

    Cancelled
  • Small residential project · Addition(s)

    construct addition over existing 1 1/2 storey dwellingREV. 01: to remove one of the interior wall(The wall beside the kitchen).

    Applied Sep 14, 2021 · issued Aug 10, 2022 · completed Jun 19, 2024 · Permit 21 212530 BLD

    Closed
  • Plumbing

    Plumbing - construct addition over existing 1 1/2 storey dwelling

    Applied Sep 14, 2021 · issued Aug 10, 2022 · completed Jul 5, 2024 · Permit 21 212530 PLB

    Closed
  • Heating and ventilation

    HVAC - construct addition over existing 1 1/2 storey dwelling

    Applied Sep 14, 2021 · issued Aug 12, 2022 · completed Jul 5, 2024 · Permit 21 212530 HVA

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    Proposal to construct an attached garage to the east side of the residential dwelling.

    Decision: conditional approval (hearing Feb 15, 2024)

    Filed Nov 9, 2023 · File A0633/23NY

    Closed

What’s planned nearby

Development sites within 500 m

  • 2451 Dufferin Street

    27 storeys · 672 homes · Mixed use

    490 m away · Site plan · Under review · filed Dec 30, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 81 Stayner Ave · Minor variance

    To alter the existing detached dwelling and construct an attached garage.

    170 m away · filed Sep 18, 2026 · Accepted

  • 2775 Dufferin St · Minor variance

    To legalize and maintain the existing ancillary structure (shed) in the rear yard of the property and surface parking.

    220 m away · filed Sep 22, 2025 · Approved

  • 162 Times Rd · Minor variance

    To construct a new 3 storey - fourplex and a new garden suite to replace the existing detached garage.

    240 m away · filed Aug 20, 2025 · Approved

  • 14 Risa Blvd · Minor variance

    Proposal for second and third storey addition and side yard addition.

    80 m away · filed Mar 23, 2022 · Approved

  • 149 Stayner Ave · Minor variance

    To construct a one-storey rear addition and a new attached garage.

    150 m away · filed May 28, 2018 · Approved

  • 1100 Briar Hill Ave · Minor variance

    To permit the existing south side yard setback and canopy projection of "Building A", currently under construction.

    190 m away · filed Nov 28, 2017 · Approved

  • 2775 Dufferin St · Minor variance

    220 m away · filed Nov 23, 2017 · Accepted

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.