Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

104 Trinity St

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Interior alterations to existing grnd and second floor; new third floor addition and new 3 storey addition at rear. Please see Zoning Letter. Note - added 84.00 to calculated fee fro rear deck. - Multiple Projects

    Applied Feb 15, 2005 · issued Feb 18, 2005 · completed Aug 31, 2026 · Permit 04 135448 HVA

    Closed
  • Plumbing

    Plumbing - Interior alterations to existing grnd and second floor; new third floor addition and new 3 storey addition at rear. Please see Zoning Letter. Note - added 84.00 to calculated fee fro rear deck. - Multiple Projects

    Applied May 14, 2004 · issued Aug 24, 2004 · completed Aug 31, 2026 · Permit 04 135448 PLB

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 550 Adelaide St E · Minor variance

    To alter the development standards as approved under Site Specific Zoning By-law 1306-2023, by increasing the maximum residential gross floor area from 19,800 m² to 24,000 m², the total gross floor area (for residential and non-residential uses) from 21,000 m² to 25,000 m², and the building height from 29 storeys (93 m) to 37 storeys (116.25 m). Also, to reduce the minimum required first storey height from 4.5 m to 2.74 m to accommodate the previously approved mezzanine within the automotive dealership. There will be a total of 302 residential dwelling units on this lot. A Site Plan Control a…

    240 m away · filed Aug 28, 2026 · Postponed

  • 4 Gilead Pl · Consent

    To obtain consent to sever the property into three lots, and to maintain the existing easement/right-of-way.

    80 m away · filed Apr 2, 2026 · Approved

  • 4 Gilead Pl · Minor variance

    The existing undersized public parking lot will be maintained and unaltered.

    80 m away · filed Apr 2, 2026 · Approved

  • 4 Gilead Pl · Minor variance

    The existing one-storey and two-storey commercial buildings (retail and daycare) will be maintained and unaltered.

    80 m away · filed Apr 2, 2026 · Approved

  • 14 Eastern Ave · Minor variance

    To permit and construct a second storey rooftop outdoor patio to be used as a children's play area. The existing two-storey non-residential detached building is under renovation for a day nursery (child care facility) as approved by Building Permit #25 143317 BLD 00 BA.

    80 m away · filed Jan 13, 2026 · Approved

  • 29 Sackville St · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a partial rooftop structure (pergola and wood deck above the existing flat roof dwelling), attached to the enclosed stair enclosure.

    210 m away · filed Jun 6, 2024 · Approved

  • 48 Power St · Consent

    To obtain consent to sever the property into three lots and to create various easements/rights-of-way.

    220 m away · filed Feb 27, 2023 · Approved

  • 60 Trinity St · Consent

    To obtain consent to a lease for a term in excess of 21 years.

    190 m away · filed Oct 18, 2022 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.