The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation · HVAC: groups D & E

    Proposal to replace the existing chiller and cooling tower.

    Applied Jan 4, 2022 · issued Jan 18, 2022 · completed Jan 5, 2024 · Permit 22 100336 MSA

    Closed
  • Heating and ventilation

    HVAC - Make interior alterations to second floor of telecomminications building (Bell Canada).

    Applied Jan 8, 2007 · issued Jan 12, 2007 · completed Jun 8, 2026 · Permit 07 100869 HVA

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 991 Dufferin St · Minor variance

    To construct a new rear one-storey detached ancillary building (garage containing one parking space and storage) and driveway in the rear yard, abutting the laneway.

    240 m away · filed Jun 3, 2026 · Approved

  • 1045 Dufferin St · Minor variance

    To construct a new three-storey building (utility (switchgear) facility). There will be two front yard parking spaces. A Site Plan Control application (File Number 25 166590 STE 09 SA) is currently under review.

    50 m away · filed Feb 13, 2026 · Approved

  • 999 Dufferin St · Minor variance

    To construct a new three-storey detached residential building containing six dwelling units (sixplex), with front and rear basement walkouts, front and rear ground floor porches with stairs, front second and third storey balconies, a rear second storey balcony, and a rooftop patio accessed by two rooftop stair enclosures. The existing rear detached garage, abutting the lane, will be demolished.

    200 m away · filed Dec 16, 2025 · Approved

  • 991 Dufferin St · Minor variance

    To construct a new three-storey detached dwelling with a front porch, a front third level balcony, a rear ground level deck, a rear basement walkout, and a rear third level deck.

    240 m away · filed Jul 22, 2025 · Approved

  • 1081 Dufferin St · Minor variance

    To construct a new one-storey detached ancillary building (two-car garage), in the rear yard of the existing two-storey detached dwelling.

    120 m away · filed May 20, 2025 · Approved

  • 1141 Bloor St W · Consent

    To obtain consent to sever portions of the land (above and below-grade strata) and to create new easements/rights-of-way.

    180 m away · filed Oct 22, 2024 · Approved

  • 1064 Dufferin St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling (duplex) by converting the existing rear one-storey ancillary building (detached garage) into one garden suite. There will be a total of three residential dwelling units on this lot (two units within the dwelling and one unit within the ancillary building).

    50 m away · filed Jul 19, 2024 · Approved

  • 1141 Bloor St W · Minor variance

    To alter the development standards for Block A and Block B (containing Buildings A, B1, & B2, approved for 11, 34 and 37 storeys respectively) of the mixed-use redevelopment approved under Site Specific Zoning By-Law 700-2021 (OLT) by increasing the building height and number of dwelling units provided within mixed-use buildings A, B1 and B2. Also, to permit the reduction of parking spaces provided. There will be a total of 284 residential dwelling units within Block A and 859 residential dwelling units within Block B provided. This is currently under review by Site Plan Control Applications…

    180 m away · filed May 16, 2024 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.