Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

1046 Logan Ave

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposal to install a back water valve

    Applied Jul 31, 2018 · issued Jul 31, 2018 · completed Aug 9, 2018 · Permit 18 202458 DRN

    Closed
  • Small residential project · Party wall admin permits

    Admin permit for work inconjunction with 1044 logan ave(underpinning and beam instalation)

    Applied Jul 31, 2013 · issued Aug 8, 2013 · completed Nov 24, 2022 · Permit 13 213972 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 120 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey dormer addition with a rooftop deck.

    110 m away · filed Jul 29, 2026 · Hearing scheduled

  • 90 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front third storey dormer (the existing dormer will be demolished), a rear third storey addition, a rear three-storey addition with a rear basement walkout, and a rear ground floor deck with stairs.

    200 m away · filed Jun 24, 2025 · Approved

  • 157 Browning Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition, a front new canopy above the existing porch, and a rear three-storey addition with a deck and stairs.

    200 m away · filed May 30, 2025 · Approved

  • 80 Nealon Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, and a rear ground floor covered deck with a rear basement extension below.

    150 m away · filed Aug 1, 2024 · Approved

  • 141 Arundel Ave · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a rear one-storey addition (to replace the existing one-storey addition).

    150 m away · filed Jul 11, 2024 · Approved

  • 196 Fulton Ave · Minor variance

    To construct a new one-storey ancillary building (detached garage with an undersized parking space) in the rear yard of the existing two-storey semi-detached dwelling. The existing detached garage, shed, and a portion of the rear ground floor deck will be demolished.

    160 m away · filed May 30, 2024 · Approved

  • 94 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear terrace (above the second storey roof), a front second storey terrace (above the front porch), and a rear ground floor deck with stairs. The existing front porch and front second storey balcony will be reconstructed.

    190 m away · filed Apr 3, 2024 · Approved

  • 51 Nealon Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a front planter and a rear terrace.

    150 m away · filed Apr 3, 2023 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.