Toronto address · Ward 20, Scarborough Southwest
105 Atlee Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Applied Nov 5, 2020 · issued Nov 12, 2020 · completed Nov 17, 2020 · Permit 20 215567 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
119 Heale Ave · Minor variance
To construct a new two-storey detached dwelling with a front porch, rear ground floor deck and rear basement walkout. The existing one-storey detached dwelling will be demolished.
110 m away · filed Jan 2, 2025 · Approved
137 Sandown Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition (sunroom) and rear ground floor deck. NOTE: This application was previously deferred at the Committee of Adjustment hearing on February 12, 2025.
100 m away · filed Nov 12, 2024 · Approved
100 Heale Ave · Minor variance
To construct a new two-storey detached dwelling with integral two car garage.
180 m away · filed Jun 30, 2021 · Approved
93 Heale Ave · Minor variance
To construct a new two-storey detached dwelling.
230 m away · filed Feb 3, 2021 · Approved
90 Heale Ave · Minor variance
To construct a new two-storey detached dwelling with finished basement and integral garage.
230 m away · filed Jan 13, 2021 · Approved
90 Heale Ave · Consent
To obtain consent to sever the property into two residential lots (Part 1 and Part 2). Part 1 (to be retained lot) will have a frontage of 8.38 m and an area of 319.27 m². The existing dwelling is to be demolished and the land will be redeveloped as the site of a new detached dwelling requiring variances to the zoning by-law, as outlined in Application A0019/21SC. Part 2 (to be conveyed lot) will have a frontage of 8.38 m and an area of 319.27 m². The land will be redeveloped as the site of a new detached dwelling requiring variances to the zoning by-law, as outlined in Application A0018/21SC.
230 m away · filed Jan 13, 2021 · Approved
90 Heale Ave · Minor variance
To construct a new two-storey detached dwelling with finished basement and integral garage.
230 m away · filed Jan 13, 2021 · Approved
93 Heale Ave · Minor variance
To construct a new three-storey semi-detached house on Part 1.
230 m away · filed Jul 5, 2018 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.