Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 4, Parkdale-High Park

105 Fermanagh Ave

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Drain and site service, back water valve (sewer only) installation

    Applied Nov 6, 2017 · issued Nov 6, 2017 · completed Nov 9, 2017 · Permit 17 258617 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 44 Fermanagh Ave · Minor variance

    190 m away · filed Sep 24, 2026 · Accepted

  • 46 Fermanagh Ave · Minor variance

    190 m away · filed Sep 24, 2026 · Accepted

  • 112 Wright Ave · Minor variance

    To alter the existing three-storey semi-detached dwelling by increasing the building height of the front third storey with a new sloped roof. Also, to construct a rear two-storey addition (including basement) with a ground floor deck and stairs, and a rear vehicular parking space, abutting the laneway.

    190 m away · filed Sep 8, 2026 · Tentatively scheduled

  • 289 Roncesvalles Ave · Minor variance

    To alter the existing three-storey mixed-use building by constructing rear second and third storey additions (above the existing ground level that will be partially reconstructed with a new rear basement addition below), a complete fourth storey addition with front and rear balconies, a rear basement walkout, a south side second storey balcony, as well as rooftop access for maintenance from two staircase enclosures and one elevator enclosure (located above the fourth level). There will be a total of one commercial unit and six residential dwelling units on this lot (one commercial unit occupy…

    190 m away · filed Sep 11, 2025 · Approved

  • 73 Westminster Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front third storey (attic) addition.

    130 m away · filed Jan 27, 2025 · Approved

  • 48 Fermanagh Ave · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition (partially cantilevered) with a covered ground floor deck and stairs.

    180 m away · filed Jan 24, 2025 · Approved

  • 46 Westminster Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition, a third storey addition, and a rear third storey rooftop deck (above the two-storey addition). Also, to construct a two-storey ancillary building (garage with one laneway suite), in the rear yard, abutting Orthodox Street. This ancillary building will be constructed in full compliance with the zoning by-law(s).

    220 m away · filed Feb 13, 2024 · Approved

  • 12 High Park Blvd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition with front and rear balconies, and a new east second storey deck (above a portion of the attached garage).

    230 m away · filed Sep 18, 2023 · Approved

Everything planned in Parkdale-High Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.