Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

105 Rustic Rd

The City of Toronto has 3 building permits since 2017 and 3 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposed interior alterations to main floor, raise ceiling 10", relocation of one washroom from the basement to the main level. Additional insulation added to interior side of exterior walls and relocating vents in existing single family dwelling.

    Applied Jul 11, 2018 · issued Jul 11, 2018 · completed Nov 8, 2018 · Permit 18 148096 PLB

    Closed
  • Drains and site services

    Drain - Proposed interior alterations to main floor, raise ceiling 10", relocation of one washroom from the basement to the main level. Additional insulation added to interior side of exterior walls and relocating vents in existing single family dwelling.

    Applied Jul 11, 2018 · issued Jul 11, 2018 · completed Nov 8, 2018 · Permit 18 148096 DRN

    Closed
  • Small residential project · Multiple projects

    Proposed interior alterations to main floor, raise ceiling 10", relocation of one washroom from the basement to the main level. Additional insulation added to interior side of exterior walls and relocating vents in existing single family dwelling.

    Applied Apr 24, 2018 · issued May 18, 2018 · completed Nov 29, 2018 · Permit 18 148096 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Consent · Create new Easement/ROW

    Filed Sep 3, 2026 · File B0039/26EYK

    Accepted
  • Minor variance · Other

    Filed Jul 15, 2026 · File A0220/26EYK

    Application withdrawn
  • Consent · Lot addition

    Filed Jul 9, 2026 · File B0023/26EYK

    Application withdrawn

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 127 Rustic Rd · Minor variance

    To construct a one-storey east side addition with an attached garage, a new front porch, and a pool and cabana in the rear yard.

    20 m away · filed Jul 9, 2026 · Postponed

  • 91 Rustic Rd · Minor variance

    To maintain the existing side and rear canopy and to maintain the carport on the east side of the dwelling.

    110 m away · filed Jul 24, 2025 · Approved

  • 89 Rustic Rd · Minor variance

    To construct a new detached dwelling with an attached garage.

    130 m away · filed May 2, 2023 · Application withdrawn

  • 59 Lawnside Dr · Minor variance

    To construct a new detached dwelling with an attached garage.

    100 m away · filed Mar 21, 2022 · Approved

  • 2 Weldon Crt · Minor variance

    To expand the existing attached garage by adding a north and east side addition.

    240 m away · filed Jun 3, 2020 · Approved

  • 152 Rustic Rd · Consent

    Section 57(1) of The Planning Act allows the assignment of authority to the Secretary-Treasurer, Committee of Adjustment or his/her designate to approve a Validation of Title.

    140 m away · filed Feb 15, 2019 · Approved

  • 20 Liscombe Rd · Minor variance

    To construct a two-storey north side addition.

    200 m away · filed Oct 22, 2018 · Approved

  • 4 Liscombe Rd · Minor variance

    To construct a new detached dwelling with an integral garage.

    140 m away · filed Mar 8, 2017 · Approved

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.