Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 25, Scarborough-Rouge Park

105 Watson St

The City of Toronto has 6 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Convert the existing unfinished basement to a secondary suite, basement walkout at front

    Applied Feb 9, 2021 · completed Feb 26, 2021 · 1 home added · Permit 21 114564 BLD

    Cancelled
  • Drains and site services

    Drain - Convert the existing unfinished basement to a secondary suite, basement walkout at front

    Applied Feb 9, 2021 · completed Feb 26, 2021 · Permit 21 114564 DRN

    Cancelled
  • Small residential project · Multiple projects

    revision #1change roof framing to trusses, basement walkout and others as per AL

    Applied Mar 9, 2010 · Permit 09 176014 BLD (revision 01)

    Examiner's notice sent
  • Plumbing

    Plumbing - construct side, rear and 2nd floor addition, new garage, front porch

    Applied Feb 10, 2010 · issued Feb 10, 2010 · Permit 09 176014 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - construct side, rear and 2nd floor addition, new garage, front porch

    Applied Feb 10, 2010 · issued Mar 5, 2010 · Permit 09 176014 HVA

    Permit issued
  • Small residential project · Multiple projects

    construct side, rear and 2nd floor addition, new garage, front porch

    Applied Oct 5, 2009 · issued Nov 6, 2009 · Permit 09 176014 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 91 Watson St · Minor variance

    To construct a second-storey addition over the newly constructed rear garage extension. A previous Committee of Adjustment application (A0317/16SC) approved variances for building length and depth to permit the garage extension.

    110 m away · filed Jul 22, 2021 · Refused

  • 91 Watson St · Minor variance

    To construct one-storey addition, connecting the existing detached dwelling and detached garage, in order to accommodate a wheelchair lift system. A previous Committee of Adjustment Application (A082/14SC) to construct a one-storey rear addition approved variances for building length, depth, driveway width and ancillary building (garage) floor area and height.

    110 m away · filed Oct 28, 2016 · Approved

Everything planned in Scarborough-Rouge Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.