Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 25, Scarborough-Rouge Park

1050 Military Trl

The City of Toronto has 46 building permits since 2017 (26 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Designated structure · Sign building permit related

    2 ground signs.***UNIVERSITY OF TORONTO***

    Applied Sep 1, 2026 · completed Sep 4, 2026 · Permit 26 229522 DST

    Cancelled
  • Designated structure · Sign building permit related

    4 Wall Signs + 1 Ground Sign (UNIVERSITY OF TORONTO SCARBOROUGH)** RETAIL AND PARKING COMMONS -- BOOKSTORE -- UTSC RETAIL AND PARKING COMMONS **

    Applied Jun 25, 2026 · issued Jul 29, 2026 · Permit 26 191282 DST

    Permit issued
  • Designated structure · Sign building permit related

    1 ground sign**univerity of toronto garron heath sciences complex**

    Applied Jun 15, 2026 · issued Jun 19, 2026 · Permit 26 184888 DST

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to a newly constructed building. Work is limited to ground floor rooms 187,193 & installation of new interior finishes, millwork, equipment & lighting. No structural modifications are proposed.

    Applied May 22, 2026 · issued Jun 5, 2026 · Permit 26 165359 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Proposal for interior alterations to a newly constructed building. Work is limited to ground floor rooms 187,193 & installation of new interior finishes, millwork, equipment & lighting. No structural modifications are proposed.

    Applied May 22, 2026 · issued Jun 5, 2026 · Permit 26 165359 HVA

    Permit issued
  • Plumbing

    Plumbing - Proposal for interior alterations to a newly constructed building. Work is limited to ground floor rooms 187,193 & installation of new interior finishes, millwork, equipment & lighting. No structural modifications are proposed.

    Applied May 22, 2026 · issued Jun 5, 2026 · Permit 26 165359 PLB

    Inspections under way
  • Plumbing

    REV 01: Revision to finish mercantile space on the ground floor.Plumbing - Proposed for a new 5 Storey open-air Parking Structure with partial ground floor Retail and Office space.

    Applied Apr 2, 2026 · issued Apr 7, 2026 · Permit 21 138093 PLB (revision 01)

    Revision issued
  • New building

    REV 02: Revision to finish mercantile space on the ground floor.Proposed for a new 5 Storey open-air Parking Structure with partial ground floor Retail and Office space.

    Applied Apr 2, 2026 · issued Apr 16, 2026 · Permit 21 138093 BLD (revision 02)

    Revision issued
  • Heating and ventilation

    REV 01: Revision to finish mercantile space on the ground floor.HVAC - Proposed for a new 5 Storey open-air Parking Structure with partial ground floor Retail and Office space.

    Applied Apr 2, 2026 · issued Apr 7, 2026 · Permit 21 138093 HVA (revision 01)

    Revision issued
  • New building

    REVISION - revised architectural and fire protection as per the attached cover lettersProposed for a new 5 Storey open-air Parking Structure with partial ground floor Retail and Office space.

    Applied Dec 16, 2025 · issued Jan 15, 2026 · Permit 21 138093 BLD (revision 01)

    Revision issued
  • Designated structure · Sign building permit related

    1 wall sign**CAFE DEPOT**

    Applied Jul 2, 2025 · completed Jul 7, 2025 · Permit 25 186883 DST

    Cancelled
  • Plumbing

    Plumbing - This permit application pertains solely to the alteration of an existing photovoltaic (PV) canopy system located on the roof of a 5-storey, open-air, precast concrete parking structure. The scope of work is limited to the infill of two sections within the current PV canopy array and minor drainage and electrical revisions to support the PV panel infill . No modifications to the structure are proposed.

    Applied May 7, 2025 · issued Jun 13, 2025 · Permit 25 149349 PLB

    Inspections under way
Show 34 more permits
  • Heating and ventilation

    HVAC - This permit application pertains solely to the alteration of an existing photovoltaic (PV) canopy system located on the roof of a 5-storey, open-air, precast concrete parking structure. The scope of work is limited to the infill of two sections within the current PV canopy array and minor drainage and electrical revisions to support the PV panel infill . No modifications to the structure are proposed.

    Applied Apr 25, 2025 · completed May 21, 2025 · Permit 25 149349 HVA

    Cancelled
  • Addition or alteration · Other

    This permit application pertains solely to the alteration of an existing photovoltaic (PV) canopy system located on the roof of a 5-storey, open-air, precast concrete parking structure. The scope of work is limited to the infill of two sections within the current PV canopy array and minor drainage and electrical revisions to support the PV panel infill . No modifications to the structure are proposed.

    Applied Apr 25, 2025 · issued May 23, 2025 · Permit 25 149349 BLD

    Inspections under way
  • Alternative solution

    Proposed alternative solution to protect the gas line serving the emergency generator withCL4FIRE Red Fire Protection Thermal Insulation wrap in lieu of locating the gas pipe in a fire enclosure or a service room.

    Applied Feb 12, 2025 · completed Mar 25, 2025 · Permit 25 116196 ALT

    Cancelled
  • Alternative solution

    The Ontario Building Code (OBC) requires that a standpipe system be installed in buildings exceeding three storeys or 14 meters in height. Specifically, for buildings over 4000 m2 area or 25 meter height, both 38 mm and 65 mm diameter hose connections must be provided on each floor. These systems must comply with NFPA 14 standards. Hose stations, equipped with fire hoses, nozzles, and extinguishers, must be located within 5 meters of every exit, ensuring full coverage so that every part of the building can be reached by a hose stream within 33 meters. The proposed alternative solution suggest…

    Applied Dec 3, 2024 · completed Apr 1, 2025 · Permit 24 246103 ALT

    Approved
  • Partial permit · Partial permit - structural framing

    Part Permit - Proposed for a new 5 Storey open-air Parking Structure with partial ground floor Retail and Office space.

    Applied Oct 31, 2024 · issued Dec 18, 2024 · completed Dec 18, 2024 · Permit 21 138093 STR

    Closed
  • Drains and site services

    Revision 01 - Confirmation that the groundwater sump pit associated pumps, and sampling port at the basement level (tunnel) within the building have been removed as per Permit Submission R1. The foundation has been deleted. A permanent groundwater discharge to the municipal storm (or sanitary) system is not requiredDrain - Proposed for a new 5 Storey open-air Parking Structure with partial ground floor Retail and Office space.

    Applied Oct 3, 2024 · issued Oct 31, 2024 · Permit 21 138093 DRN (revision 01)

    Revision issued
  • Conditional permit · Inside and outside drains

    Conditional Permit - Drain - Proposed for a new 5 Storey open-air Parking Structure with partial ground floor Retail and Office space.

    Applied Aug 23, 2024 · issued Sep 20, 2024 · completed Dec 19, 2024 · Permit 21 138093 STS

    Closed
  • Partial permit · Partial permit - structural framing

    Part Permit - Proposed building contains teaching and research laboratory, classrooms, meeting rooms, faculty offices, study lounges, a psychology clinic, retail pharmacy. STRUCTURE ADDRESS - 840 MILITARY TRAIL

    Applied Jun 26, 2024 · completed Nov 28, 2024 · Permit 23 221612 STR

    Cancelled
  • Designated structure · Sign building permit related

    2 wall signs + ground sign**sam ibrahim building**

    Applied May 29, 2024 · issued Jun 4, 2024 · completed Oct 20, 2025 · Permit 24 155923 DST

    Closed
  • Partial permit · Partial permit - foundation

    Foundation Part Permit - Proposed for a new 5 Storey open-air Parking Structure with partial ground floor Retail and Office space.

    Applied May 10, 2024 · issued Dec 18, 2024 · completed Dec 18, 2024 · Permit 21 138093 FND

    Closed
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposed for a new 5 Storey open-air Parking Structure with partial ground floor Retail and Office space.

    Applied Apr 25, 2024 · completed Jun 6, 2025 · Permit 21 138093 FSU

    Closed
  • Partial permit · Partial permit - foundation

    Part Permit - Proposed building contains teaching and research laboratory, classrooms, meeting rooms, faculty offices, study lounges, a psychology clinic, retail pharmacy. STRUCTURE ADDRESS - 840 MILITARY TRAIL

    Applied Feb 2, 2024 · completed Sep 25, 2024 · Permit 23 221612 FND

    Superseded
  • New building

    REV01: Proposed revision as per drawings - for updated space on Level 2Proposal to construct a new 5 storey institutional building, Student Instructional Centre 2 for the University of Toronto, Scarborough Campus. See also 20 145777 SA.

    Applied Nov 16, 2023 · issued Dec 19, 2023 · completed Feb 4, 2025 · Permit 20 230161 BLD (revision 01)

    Closed
  • Alternative solution

    Proposal for Alternative Solution for StandPipeSTRUCTURE ADDRESS - 840 MILITARY TRAIL

    Applied Nov 14, 2023 · completed Apr 2, 2024 · Permit 23 225887 ALT

    Approved
  • Heating and ventilation

    HVAC - Proposed building contains teaching and research laboratory, classrooms, meeting rooms, faculty offices, study lounges, a psychology clinic, retail pharmacy. STRUCTURE ADDRESS - 840 MILITARY TRAIL

    Applied Nov 9, 2023 · issued Sep 25, 2024 · Permit 23 221612 HVA

    Inspections under way
  • Drains and site services · Inside and outside drains

    Drain - Proposed building contains teaching and research laboratory, classrooms, meeting rooms, faculty offices, study lounges, a psychology clinic, retail pharmacy. STRUCTURE ADDRESS - 840 MILITARY TRAIL

    Applied Nov 9, 2023 · issued Oct 17, 2024 · Permit 23 221612 STS

    Inspections under way
  • Plumbing

    Plumbing - Proposed building contains teaching and research laboratory, classrooms, meeting rooms, faculty offices, study lounges, a psychology clinic, retail pharmacy. STRUCTURE ADDRESS - 840 MILITARY TRAIL

    Applied Nov 9, 2023 · issued Sep 25, 2024 · Permit 23 221612 PLB

    Inspections under way
  • Drains and site services

    Drain - Proposed building contains teaching and research laboratory, classrooms, meeting rooms, faculty offices, study lounges, a psychology clinic, retail pharmacy. STRUCTURE ADDRESS - 840 MILITARY TRAIL

    Applied Nov 9, 2023 · issued Feb 16, 2024 · Permit 23 221612 DRN

    Inspections under way
  • New building

    Proposed building contains teaching and research laboratory, classrooms, meeting rooms, faculty offices, study lounges, a psychology clinic, retail pharmacy. STRUCTURE ADDRESS - 840 MILITARY TRAIL

    Applied Nov 2, 2023 · issued Nov 28, 2024 · Permit 23 221612 BLD

    Inspections under way
  • Conditional permit · Partial permit - structural framing

    Conditional Permit - Part Permit - Proposal to construct a new 5 storey institutional building, Student Instructional Centre 2 for the University of Toronto, Scarborough Campus.

    Applied Jan 26, 2022 · issued Apr 22, 2022 · completed Mar 6, 2023 · Permit 20 230161 STR

    Cancelled
  • Conditional permit · Partial permit - foundation

    Conditional Permit - Part Permit - Proposal to construct a new 5 storey institutional building, Student Instructional Centre 2 for the University of Toronto, Scarborough Campus. See also 20 145777 SA.

    Applied Sep 8, 2021 · issued Nov 4, 2021 · completed Apr 22, 2022 · Permit 20 230161 FND

    Cancelled
  • Conditional permit · Partial permit - shoring

    Conditional Permit - Part Permit - Proposal to construct a new 5 storey institutional building, Student Instructional Centre 2 for the University of Toronto, Scarborough Campus. See also 20 145777 SA.

    Applied May 6, 2021 · issued Jun 7, 2021 · completed Nov 4, 2021 · Permit 20 230161 SHO

    Cancelled
  • Alternative solution

    Compensatory measures are proposed for the alternative solutions in order to achieve the minimum level of the performance set out by the OBC acceptable solutions.

    Applied Apr 29, 2021 · completed May 17, 2023 · Permit 21 147589 ALT

    Approved
  • Alternative solution

    This document aims to clarify that the use of Mass Timber is permitted by the S413 and can be designed and built to meet the overarching principles and performance objectives outlined in OBC and the CSA S413.

    Applied Apr 29, 2021 · completed May 17, 2023 · Permit 21 147605 ALT

    Approved
  • New building

    Proposed for a new 5 Storey open-air Parking Structure with partial ground floor Retail and Office space.

    Applied Apr 9, 2021 · issued Dec 18, 2024 · Permit 21 138093 BLD

    Inspections under way
  • Drains and site services

    Drain - Proposed for a new 5 Storey open-air Parking Structure with partial ground floor Retail and Office space.

    Applied Apr 9, 2021 · issued Jul 11, 2024 · Permit 21 138093 DRN

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed for a new 5 Storey open-air Parking Structure with partial ground floor Retail and Office space.

    Applied Apr 9, 2021 · issued Dec 18, 2024 · Permit 21 138093 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposed for a new 5 Storey open-air Parking Structure with partial ground floor Retail and Office space.

    Applied Apr 9, 2021 · issued Dec 18, 2024 · Permit 21 138093 PLB

    Inspections under way
  • Alternative solution

    Proposal for an alternative solution to provide an opening between Level 2 and 3 in lieu of terminating at vertical fire separations.

    Applied Feb 22, 2021 · completed May 31, 2021 · Permit 21 118927 ALT

    Approved
  • Drains and site services

    Drain - Proposal to construct a new 5 storey institutional building, Student Instructional Centre 2 for the University of Toronto, Scarborough Campus. See also 20 145777 SA.

    Applied Dec 17, 2020 · issued Feb 28, 2022 · completed Dec 16, 2024 · Permit 20 230161 DRN

    Closed
  • New building

    Proposal to construct a new 5 storey institutional building, Student Instructional Centre 2 for the University of Toronto, Scarborough Campus. See also 20 145777 SA.

    Applied Dec 17, 2020 · issued Mar 6, 2023 · completed Feb 4, 2025 · Permit 20 230161 BLD

    Closed
  • Plumbing

    Plumbing - Proposal to construct a new 5 storey institutional building, Student Instructional Centre 2 for the University of Toronto, Scarborough Campus. See also 20 145777 SA.

    Applied Dec 17, 2020 · issued Jun 2, 2022 · completed Dec 24, 2024 · Permit 20 230161 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct a new 5 storey institutional building, Student Instructional Centre 2 for the University of Toronto, Scarborough Campus. See also 20 145777 SA.

    Applied Dec 17, 2020 · issued Apr 22, 2022 · completed Dec 16, 2024 · Permit 20 230161 HVA

    Closed
  • Drains and site services · Inside and outside drains

    Drain - Proposal to construct a new 5 storey institutional building, Student Instructional Centre 2 for the University of Toronto, Scarborough Campus. See also 20 145777 SA.

    Applied Dec 17, 2020 · issued Feb 17, 2023 · completed Dec 12, 2024 · Permit 20 230161 STS

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    The purpose of this minor variance application is to obtain a temporary reduction in the number of required parking spaces for the University of Toronto, Scarborough Campus (UTSC).

    Decision: Approved (hearing Mar 11, 2021)

    Filed Jan 29, 2021 · File A0039/21SC

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 3300 Ellesmere Rd · Consent

    This application is for consent to permit a lease for a period in excess of 21 years. This application is in support of a 750-bed Student Residence at the University of Toronto Scarborough Campus. Any lease that has the effect of granting the use of or right in land for a period exceeding 21 years requires the consent of the Committee of Adjustment.

    250 m away · filed Jul 31, 2023 · Approved

Everything planned in Scarborough-Rouge Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.