Toronto address · Ward 14, Toronto-Danforth
1054 Logan Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Inside and outside drains
Proposal to install pipes under the concrete slab for furnace room, laundry area, bathroom, sewage ejector and sump pump installation.
Applied Apr 28, 2022 · issued May 13, 2022 · completed Mar 28, 2024 · Permit 22 139465 STS
- Closed
Drains and site services
Drain - Proposal for basement underpinning
Applied Mar 25, 2022 · issued Mar 25, 2022 · completed Mar 28, 2024 · Permit 21 191655 DRN
- Closed
Small residential project · Underpinning
Proposal for basement underpinning
Applied Jul 29, 2021 · issued Aug 9, 2021 · completed Apr 8, 2024 · Permit 21 191655 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
995-1005 Broadview Avenue and 2-4 Mortimer Avenue
7 storeys · 50 homes · Mixed use
390 m away · Site plan · Approved · filed Dec 6, 2021
- Submitted
16 storeys · 332 homes · Mixed use
410 m away · Site plan · Submitted · filed Apr 2, 2026
- Under review
8-40 Gowan Avenue and 5-19 Cosburn Avenue
24 storeys · 424 homes · Residential
450 m away · Site plan · Under review · filed Apr 26, 2022
Neighbours’ Committee of Adjustment files within 250 m
120 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey dormer addition with a rooftop deck.
140 m away · filed Jul 29, 2026 · Hearing scheduled
90 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front third storey dormer (the existing dormer will be demolished), a rear third storey addition, a rear three-storey addition with a rear basement walkout, and a rear ground floor deck with stairs.
220 m away · filed Jun 24, 2025 · Approved
157 Browning Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition, a front new canopy above the existing porch, and a rear three-storey addition with a deck and stairs.
240 m away · filed May 30, 2025 · Approved
80 Nealon Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, and a rear ground floor covered deck with a rear basement extension below.
150 m away · filed Aug 1, 2024 · Approved
141 Arundel Ave · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a rear one-storey addition (to replace the existing one-storey addition).
190 m away · filed Jul 11, 2024 · Approved
78 Westwood Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition. The existing rear one-storey addition will be demolished, and the existing shed in the rear yard will be maintained and unaltered.
210 m away · filed Jun 17, 2024 · Approved
196 Fulton Ave · Minor variance
To construct a new one-storey ancillary building (detached garage with an undersized parking space) in the rear yard of the existing two-storey semi-detached dwelling. The existing detached garage, shed, and a portion of the rear ground floor deck will be demolished.
180 m away · filed May 30, 2024 · Approved
94 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear terrace (above the second storey roof), a front second storey terrace (above the front porch), and a rear ground floor deck with stairs. The existing front porch and front second storey balcony will be reconstructed.
210 m away · filed Apr 3, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.