Toronto address · Ward 12, Toronto-St. Paul's
106 Glenayr Rd
The City of Toronto has 7 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal to construct a new two storey single family dwelling with an integral garage
Applied Feb 16, 2023 · issued Feb 24, 2023 · completed May 14, 2024 · Permit 21 197176 HVA
- Closed
New house · New building
REV02: Changes in foundation, footings and interior layoutRevision 01. Interior Layout and Front Elevation ModificationProposal to construct a new two storey single family dwelling with an integral garage
Applied Jul 19, 2022 · issued Aug 8, 2022 · completed Jul 6, 2026 · Permit 21 197176 BLD (revision 02)
- Closed
New house · New building
Revision 01. Interior Layout and Front Elevation ModificationProposal to construct a new two storey single family dwelling with an integral garage
Applied Nov 24, 2021 · issued Dec 8, 2021 · completed Jul 6, 2026 · Permit 21 197176 BLD (revision 01)
- Closed
Plumbing
Plumbing - Proposal to construct a new two storey single family dwelling with an integral garage
Applied Aug 12, 2021 · issued Sep 9, 2021 · completed Jun 27, 2024 · Permit 21 197176 PLB
- Closed
New house · New building
Proposal to construct a new two storey single family dwelling with an integral garage
Applied Aug 12, 2021 · issued Sep 9, 2021 · completed Jul 6, 2026 · 1 home added · Permit 21 197176 BLD
- Closed
Demolition
Proposal to demolish the existing dwelling in order to construct a new dwelling.
Applied Aug 12, 2021 · issued Sep 23, 2021 · completed Feb 27, 2023 · 1 home removed · Permit 21 197189 DEM
- Closed
Drains and site services
Drain - Proposal to construct a new two storey single family dwelling with an integral garage
Applied Aug 12, 2021 · issued Sep 9, 2021 · completed May 14, 2024 · Permit 21 197176 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new three-storey detached dwelling with an integral garage, rear basement walkout, rear deck and a front porch.
Decision: Approved (hearing Jun 2, 2021)
Filed Jan 21, 2021 · File A0074/21TEY
What’s planned nearby
Development sites within 500 m
- Under review
4 storeys · 10 homes · Residential
300 m away · Site plan · Under review · filed Apr 13, 2022
- Approved
Neighbours’ Committee of Adjustment files within 250 m
210 Rosemary Rd · Minor variance
To construct a new three-storey detached dwelling (including a third storey loft) with a front integral three-car garage, a covered front second floor porch with stairs and a landing, a front third storey platform (not accessible), a rear ground floor walkout, a rear second floor deck with stairs, a side (south) ground floor entrance, a rear third storey dormer with a balcony, a side (south) third storey dormer and a side (north) third storey dormer.
240 m away · filed Jul 29, 2026 · Postponed
4 Ridgewood Rd · Minor variance
To construct a new two-storey detached U-shaped dwelling with an integral four-car garage at the basement level, a horseshoe driveway, a front basement foyer (terrace on ground floor above foyer), a rear ground floor one-storey conservatory (connected internally with main ground level) with stairs, a rear courtyard (between dwelling and conservatory structure), a rear second floor balcony and an in-ground swimming pool in the rear yard. Also, to construct two new one-storey detached ancillary buildings (cabanas) on the east and west sides of the in-ground swimming pool.
160 m away · filed Nov 21, 2025 · Approved
35 Vesta Dr · Minor variance
To construct a new three-storey detached dwelling with a covered front porch, an integral garage with a widened driveway, a rear basement walkout, and a rear first level deck. There will be one secondary suite within the basement.
170 m away · filed Feb 18, 2025 · Approved
42 Glenayr Rd · Minor variance
To construct a new three-storey detached dwelling with an integral garage and car lift, a covered front porch with stairs, a ground floor covered outdoor terrace (covered outdoor room), a rear third storey balcony, a rear basement walkout, and a rear yard in-ground pool and spa. Also, to construct a one-storey ancillary building (pool cabana) in the rear yard.
170 m away · filed Jun 14, 2024 · Deferred
201 Vesta Dr · Minor variance
To construct a new one-storey ancillary structure (covered cabana), and an in-ground swimming pool (including pool equipment), in the rear yard. The existing two-and-one-half-storey detached dwelling will be maintained and unaltered.
220 m away · filed Mar 19, 2024 · Approved
32 Glenayr Rd · Minor variance
To construct a one-storey detached accessory structure (enclosed pool cabana) at the rear of the property. An in-ground swimming pool will be constructed in between the main house and this accessory structure.
230 m away · filed Feb 13, 2024 · Approved
213 Rosemary Rd · Minor variance
To construct a new detached two-and-a-half storey dwelling including a front integral garage with canopy above, a first storey front bay window (cantilevered), a rear basement walkout, a cantilevered front second floor with roof deck above, and a rear second storey roof deck. The existing two-and-a-half storey dwelling will be demolished.
240 m away · filed Dec 28, 2023 · Approved
212 Glenayr Rd · Minor variance
To construct a new three-storey detached dwelling with a ground level front integral garage (including a car lift), a rear ground level deck and patio, a rear second floor balcony, front and rear third floor balconies, and a rear basement walkout (with stairs). Also, to construct a rear in-ground swimming pool.
230 m away · filed Jul 27, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.