Toronto address · Ward 1, Etobicoke North
106 Humber College Blvd
The City of Toronto has 12 building permits since 2017 (7 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
Revision #01 - Adding venting duct for the clothes dryerHVAC - Proposed interior alterations to existing unit for proposed physiotherapy office/clinic - Unit 17A.
Applied Feb 6, 2020 · issued Feb 21, 2020 · Permit 19 241865 HVA (revision 01)
- Closed
Designated structure · Sign building permit related
To erect and display one illuminated wall sign measuring 0.6 meters bt 4.57 meters at the height of 5.02 meters.****PHYSIOMED****
Applied Jan 13, 2020 · issued Mar 13, 2020 · completed Apr 6, 2022 · Permit 20 103435 DST
- Closed
Plumbing
Plumbing - Proposed interior alterations to existing unit for proposed physiotherapy office/clinic - Unit 17A.
Applied Oct 28, 2019 · issued Dec 23, 2019 · completed Mar 10, 2020 · Permit 19 241865 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposed interior alterations to existing unit for proposed physiotherapy office/clinic - Unit 17A.
Applied Oct 28, 2019 · issued Dec 23, 2019 · Permit 19 241865 HVA
- Closed
Addition or alteration · Interior alterations
Proposed interior alterations to existing unit for proposed physiotherapy office/clinic - Unit 17A.
Applied Oct 28, 2019 · issued Dec 2, 2019 · completed Feb 28, 2020 · Permit 19 241865 BLD
- Inspections under way
Addition or alteration · Interior alterations
Proposal to put make up unit on the roof
Applied Jul 18, 2017 · issued Aug 23, 2017 · Permit 17 200610 BLD
- Inspections under way
Heating and ventilation · Special ventilation system
Proposal to install kitchen exhaust ventilation. Refer to Building Permit #17-200610 BLD
Applied May 23, 2017 · issued Dec 27, 2017 · Permit 17 164294 MSA
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations including redesigned Barrier Free Washroom to new Foot Clinic/Physiotherapy. Unit 12.
Applied Feb 28, 2017 · issued Mar 9, 2017 · Permit 17 122295 BLD
- Permit issued
Plumbing
Plumbing - To repair damages to the front of the building "Shanghai Restaurant" caused by a vehicle.
Applied Dec 23, 2014 · issued Jan 23, 2015 · Permit 14 256844 PLB
- Closed
Addition or alteration · Other
To repair damages to the front of the building "Shanghai Restaurant" caused by a vehicle.
Applied Nov 26, 2014 · issued Dec 23, 2014 · completed Sep 16, 2020 · Permit 14 256844 BLD
- Closed
Plumbing · Backflow prevention devices (Water only)
Installation of one backflow prevention device
Applied Apr 22, 2013 · issued May 7, 2013 · completed Sep 4, 2026 · Permit 13 154288 PSA
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior alterations to existing retail unit to establish new take-out pizza restaurant ('I Pizza').
Applied Aug 18, 2011 · issued Oct 19, 2011 · Permit 11 259448 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
None on file since 2017.
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.