Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

106 King St E

Cathedral Church of St. James

The City of Toronto has 4 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Temporary structure · Certified tents

    To install one certified tent 10' x 50' A Frame tent (Cert #: 15-152028).

    Applied May 27, 2023 · issued May 30, 2023 · completed Sep 8, 2025 · Permit 23 151904 TPS

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Revise door swing.

    Applied Jun 26, 2012 · issued Jun 29, 2012 · Permit 12 170587 FSU (revision 01)

    Revision issued
  • Fire and security upgrade · Electromagnetic locks

    CONVENIENCE ADDRESS IS 65 CHURCH STREET - Permit to install one maglock on second floor level of existing place of worship. - St James Cathedral

    Applied May 10, 2012 · issued May 15, 2012 · Permit 12 170587 FSU

    Inspections under way
  • Plumbing · Install/Alter plumbing - only

    Emergency drain repair by removing trap and installing cleanout. Edc

    Applied Jan 13, 2000 · issued Jan 14, 2000 · completed Jun 8, 2026 · Permit 00 120815 PLB

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 89 Church St · Minor variance

    To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.

    220 m away · filed Nov 4, 2024 · Approved

  • 71 King St E · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 552-2019(LPAT)), for the existing four-storey commercial/office building, by permitting the dwelling unit use through the conversion of the second and third storeys from commercial/offices uses into residential dwelling units (live/work units). Also, to permit a new residential lobby, facing King Street East. No visitor parking spaces and accessible parking spaces will be provided on-site. There will be a total of three commercial units and 11 residential dwelling units (7 dwelling units and 1 commercial unit on…

    150 m away · filed Aug 26, 2024 · Approved

  • 34 King St E · Minor variance

    To alter the development standards for the 33-storey mixed-use building (approved under Site Specific Zoning By-Law 1195-2022), by converting the required office use space into hotel use space (for 142 hotel suites and related facilities) on floors 1 through 10. The site is subject to a current Site Plan Control Application (File 2017 235087 STE 28 SA).

    240 m away · filed Jul 8, 2024 · Approved

  • 17 Leader Lane · Minor variance

    To alter the existing three-storey commercial building by constructing a complete fourth storey addition.

    170 m away · filed Aug 30, 2021 · Approved

  • 67 Adelaide St E · Minor variance

    To construct a partial fourth floor addition to the existing building for the conversion into a Municipal Shelter.

    120 m away · filed May 19, 2021 · Approved

  • 80 Front St E · Minor variance

    APPLICATION FILED IN ERROR - VARIANCE NOT REQUIREDTo legalize and maintain a pergola over a rooftop patio on the 9th floor of 80 Front St E.

    160 m away · filed Dec 12, 2019 · Withdrawn

  • 46 Colborne St · Consent

    To obtain consent to sever a portion of the land for the purpose of a lot addition and to create various easements/rights-of-way. This application is associated with consent applications B0036/18TEY, B0037/18TEY, B0039/18TEY and B0040/18TEY which collectively facilitate the creation of three stratified parcels for a commercial and office redevelopment scheme.

    150 m away · filed Jun 20, 2018 · Approved

  • 91 King St E · Consent

    To obtain consent to re-establish an easement/right-of-way.

    110 m away · filed Jun 20, 2018 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.