Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 6, York Centre

108 De Quincy Blvd

The City of Toronto has 7 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Pool fence enclosure

    Inground swimming pool and landscaping.

    Applied Aug 18, 2017 · issued Aug 25, 2017 · completed Aug 25, 2017 · Permit 17 219064 BLD

    Closed
  • Drains and site services · Back water valve (Sewer only)

    Install one new mean lone full port Back Water Valve (Sewer only)

    Applied Feb 28, 2017 · issued Feb 28, 2017 · completed May 29, 2017 · Permit 17 122491 DRN

    Closed
  • Heating and ventilation

    HVAC - PROP. NEW REAR & SIDE 2 STY ADDITION W/INTEGRAL GARAGE [BSMT AREA = 141.68m2]

    Applied Jul 20, 2016 · issued Aug 9, 2016 · completed May 26, 2017 · Permit 16 136904 HVA

    Closed
  • Small residential project · Addition(s)

    Rev01- revised permit with minor interior and exterior alterationsPROP. NEW REAR & SIDE 2 STY ADDITION W/INTEGRAL GARAGE [BSMT AREA = 141.68m2]

    Applied Jul 5, 2016 · issued Jul 12, 2016 · completed May 29, 2017 · Permit 16 136904 BLD (revision 01)

    Closed
  • Small residential project · Addition(s)

    PROP. NEW REAR & SIDE 2 STY ADDITION W/INTEGRAL GARAGE [BSMT AREA = 141.68m2]

    Applied Apr 7, 2016 · issued May 16, 2016 · completed May 29, 2017 · Permit 16 136904 BLD

    Closed
  • Drains and site services

    Drain - PROP. NEW REAR & SIDE 2 STY ADDITION W/INTEGRAL GARAGE [BSMT AREA = 141.68m2]

    Applied Apr 7, 2016 · issued May 16, 2016 · completed May 29, 2017 · Permit 16 136904 DRN

    Closed
  • Plumbing

    Plumbing - PROP. NEW REAR & SIDE 2 STY ADDITION W/INTEGRAL GARAGE [BSMT AREA = 141.68m2]

    Applied Apr 7, 2016 · issued May 16, 2016 · completed May 26, 2017 · Permit 16 136904 PLB

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 37 King High Ave · Minor variance

    To alter the existing detached dwelling by constructing a new front porch, a rear two-storey addition and a second storey addition with a rear terrace.

    210 m away · filed May 8, 2026 · Approved

  • 17 Corwin Cres · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, front porch and rear covered deck.

    250 m away · filed Jun 12, 2025 · Approved

  • 50 Wigan Cres · Minor variance

    To construct a new detached dwelling

    30 m away · filed Jul 12, 2024 · Approved

  • 42 King High Ave · Minor variance

    Proposal to demolish existing dwelling and construct a new two-storey dwelling.

    150 m away · filed Sep 15, 2022 · Approved

  • 121 Invermay Ave · Minor variance

    To construct a rear addition to the existing dwelling with interior alterations.

    70 m away · filed Jun 21, 2021 · Approved

  • 119 Invermay Ave · Minor variance

    To construct a new dwelling with integral garage.

    60 m away · filed May 19, 2021 · Approved

  • 9 Faith Ave · Minor variance

    To construct a new dwelling.

    230 m away · filed Jul 9, 2020 · Approved

  • 40 King High Ave · Minor variance

    To construct a new dwelling.

    150 m away · filed Dec 6, 2019 · Approved

Everything planned in York Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.