Toronto address · Ward 8, Eglinton-Lawrence
108 Playfair Ave
The City of Toronto has 7 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
New house · New building
Revision to update insulation package A5 to A1 - Proposal to construct a new two storey dwelling with an integral garage and unfinished basement.
Applied Sep 28, 2017 · issued Oct 24, 2017 · completed Jul 7, 2020 · Permit 17 149953 BLD (revision 01)
- Closed
Heating and ventilation
Revision 01 - HVAC System. HVAC - Proposal to construct a new two storey dwelling with an integral garage and unfinished basement.
Applied Aug 8, 2017 · issued Oct 30, 2017 · completed Mar 8, 2018 · Permit 17 149953 HVA (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal to construct a new two storey dwelling with an integral garage and unfinished basement.
Applied Apr 26, 2017 · issued May 25, 2017 · completed Mar 8, 2018 · Permit 17 149953 HVA
- Closed
Plumbing
Plumbing - Proposal to construct a new two storey dwelling with an integral garage and unfinished basement.
Applied Apr 26, 2017 · issued May 12, 2017 · completed Mar 8, 2018 · Permit 17 149953 PLB
- Closed
New house · New building
Proposal to construct a new two storey dwelling with an integral garage and unfinished basement.
Applied Apr 26, 2017 · issued May 12, 2017 · completed Jul 7, 2020 · 1 home added · Permit 17 149953 BLD
- Closed
Demolition
Proposal to demolish existing sfd
Applied Apr 26, 2017 · issued May 12, 2017 · completed Aug 10, 2017 · 1 home removed · Permit 17 149961 DEM
- Closed
Drains and site services
Drain - Proposal to construct a new two storey dwelling with an integral garage and unfinished basement.
Applied Apr 26, 2017 · issued May 12, 2017 · completed Mar 8, 2018 · Permit 17 149953 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
115 Playfair Ave · Minor variance
To alter the existing one-storey detached dwelling and construct a one-storey rear addition and rear deck (patio).
80 m away · filed Apr 23, 2026 · Approved
91 Glen Long Ave · Minor variance
To legalize and maintain the ancillary structure (detached garage) in the rear yard of the property.
150 m away · filed Oct 23, 2025 · Refused
90 Glen Long Ave · Minor variance
To construct a new dwelling.
110 m away · filed Apr 4, 2025 · Approved
91 Glen Long Ave · Minor variance
To construct a new detached garage in the rear yard of the Subject Property. Please note this application was previously deferred July 27, 2023.
150 m away · filed Jun 12, 2023 · Deferred
14 Sage Ave · Minor variance
Proposal to add a 1 storey addition above existing detatched single family dwelling.
190 m away · filed Mar 11, 2022 · Approved
87 Playfair Ave · Minor variance
Proposal for a new partial second floor addition above existing dwelling and new extension to existing garage.
150 m away · filed Nov 22, 2021 · Approved
76 Glen Long Ave · Minor variance
To construct a new dwelling.
180 m away · filed Apr 12, 2021 · Approved
135 Playfair Ave · Minor variance
To construct a detached dwelling with an integral garage.
220 m away · filed Mar 25, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.