The City of Toronto has 7 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
New house · New building
Revision 01: Additon of cooktop in the basement of already approved 2 storey new houseTo demolish existing dwelling and construct a new two storey dwelling
Applied Jan 25, 2023 · issued Feb 15, 2023 · Permit 21 116549 BLD (revision 01)
- Closed
Small residential project · Other
Proposal to install photovoltaic solar system on the rooftop of an existing SFD-detached dwelling.
Applied Dec 23, 2021 · issued Jan 14, 2022 · completed Feb 1, 2023 · Permit 21 251074 BLD
- Closed
Heating and ventilation
HVAC - To demolish existing dwelling and construct a new two storey dwelling
Applied May 27, 2021 · issued May 28, 2021 · completed Feb 22, 2023 · Permit 21 116549 HVA
- Closed
Plumbing
Plumbing - To demolish existing dwelling and construct a new two storey dwelling
Applied May 5, 2021 · issued May 5, 2021 · completed Feb 22, 2023 · Permit 21 116549 PLB
- Inspections under way
New house · New building
To demolish existing dwelling and construct a new two storey dwelling
Applied Feb 16, 2021 · issued Apr 16, 2021 · 1 home added · Permit 21 116549 BLD
- Closed
Demolition
To demolish existing dwelling and construct a new two storey dwelling
Applied Feb 16, 2021 · issued Apr 16, 2021 · completed Apr 20, 2022 · 1 home removed · Permit 21 116551 DEM
- Closed
Drains and site services
Drain - To demolish existing dwelling and construct a new two storey dwelling
Applied Feb 16, 2021 · issued Apr 16, 2021 · completed Feb 22, 2023 · Permit 21 116549 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
2771-2773 Victoria Park Avenue
4 storeys · 62 homes · Residential
290 m away · Site plan · Approved · filed Dec 19, 2024
Neighbours’ Committee of Adjustment files within 250 m
128 Fairglen Ave · Minor variance
To construct a new two-storey detached dwelling (duplex) with a covered front porch and rear deck and a pool cabana in the rear yard. The existing one-storey dwelling will be demolished. There will be a total of two dwelling units on the lot.
140 m away · filed Dec 1, 2025 · Approved
92 Fairglen Ave · Consent
Consent to sever Lot with Associated MV's
170 m away · filed Jul 24, 2023 · Application withdrawn
92 Fairglen Ave · Minor variance
MV for Lot Size New Build
170 m away · filed Jul 24, 2023 · Application withdrawn
92 Fairglen Ave · Minor variance
MV for Lot Size New Build
170 m away · filed Jul 24, 2023 · Application withdrawn
99 Fairglen Ave · Consent
To obtain consent to sever the property into two residential lots.
100 m away · filed Jul 27, 2021 · Refused
99 Fairglen Ave · Minor variance
To construct a new detached dwelling.
100 m away · filed Jul 27, 2021 · Refused
99 Fairglen Ave · Minor variance
To construct a new detached dwelling.
100 m away · filed Jul 27, 2021 · Refused
40 Huntingwood Dr · Consent
To sever the property into two (2) residential lots for the development of detached dwellings on each lot. requiring variances to the existing Zoning By-law(s). The existing dwelling is to be demolished. The application is to also create a parcel of land for road widening purposes to be conveyed to the City of Toronto. Applications for Consent B0012/21SC, and Minor Variance A0074/21SC and A0076/21SC are to be considered jointly by the Committee of Adjustment.
160 m away · filed Feb 23, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.