Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 22, Scarborough-Agincourt

109 Fairglen Ave

The City of Toronto has 7 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • New house · New building

    Revision 01: Additon of cooktop in the basement of already approved 2 storey new houseTo demolish existing dwelling and construct a new two storey dwelling

    Applied Jan 25, 2023 · issued Feb 15, 2023 · Permit 21 116549 BLD (revision 01)

    Revision issued
  • Small residential project · Other

    Proposal to install photovoltaic solar system on the rooftop of an existing SFD-detached dwelling.

    Applied Dec 23, 2021 · issued Jan 14, 2022 · completed Feb 1, 2023 · Permit 21 251074 BLD

    Closed
  • Heating and ventilation

    HVAC - To demolish existing dwelling and construct a new two storey dwelling

    Applied May 27, 2021 · issued May 28, 2021 · completed Feb 22, 2023 · Permit 21 116549 HVA

    Closed
  • Plumbing

    Plumbing - To demolish existing dwelling and construct a new two storey dwelling

    Applied May 5, 2021 · issued May 5, 2021 · completed Feb 22, 2023 · Permit 21 116549 PLB

    Closed
  • New house · New building

    To demolish existing dwelling and construct a new two storey dwelling

    Applied Feb 16, 2021 · issued Apr 16, 2021 · 1 home added · Permit 21 116549 BLD

    Inspections under way
  • Demolition

    To demolish existing dwelling and construct a new two storey dwelling

    Applied Feb 16, 2021 · issued Apr 16, 2021 · completed Apr 20, 2022 · 1 home removed · Permit 21 116551 DEM

    Closed
  • Drains and site services

    Drain - To demolish existing dwelling and construct a new two storey dwelling

    Applied Feb 16, 2021 · issued Apr 16, 2021 · completed Feb 22, 2023 · Permit 21 116549 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 128 Fairglen Ave · Minor variance

    To construct a new two-storey detached dwelling (duplex) with a covered front porch and rear deck and a pool cabana in the rear yard. The existing one-storey dwelling will be demolished. There will be a total of two dwelling units on the lot.

    140 m away · filed Dec 1, 2025 · Approved

  • 92 Fairglen Ave · Consent

    Consent to sever Lot with Associated MV's

    170 m away · filed Jul 24, 2023 · Application withdrawn

  • 92 Fairglen Ave · Minor variance

    MV for Lot Size New Build

    170 m away · filed Jul 24, 2023 · Application withdrawn

  • 92 Fairglen Ave · Minor variance

    MV for Lot Size New Build

    170 m away · filed Jul 24, 2023 · Application withdrawn

  • 99 Fairglen Ave · Consent

    To obtain consent to sever the property into two residential lots.

    100 m away · filed Jul 27, 2021 · Refused

  • 99 Fairglen Ave · Minor variance

    To construct a new detached dwelling.

    100 m away · filed Jul 27, 2021 · Refused

  • 99 Fairglen Ave · Minor variance

    To construct a new detached dwelling.

    100 m away · filed Jul 27, 2021 · Refused

  • 40 Huntingwood Dr · Consent

    To sever the property into two (2) residential lots for the development of detached dwellings on each lot. requiring variances to the existing Zoning By-law(s). The existing dwelling is to be demolished. The application is to also create a parcel of land for road widening purposes to be conveyed to the City of Toronto. Applications for Consent B0012/21SC, and Minor Variance A0074/21SC and A0076/21SC are to be considered jointly by the Committee of Adjustment.

    160 m away · filed Feb 23, 2021 · Approved

Everything planned in Scarborough-Agincourt

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.