11 Dacre Cres
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Installation of a back water valve to existing dwelling
Applied Nov 27, 2021 · issued Nov 29, 2021 · completed Dec 9, 2021 · Permit 21 242419 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
73 Kennedy Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a front two-storey addition with basement extension below, front covered porch and stairs, a partial third storey addition and a front dormer addition, rear rooftop deck (above the second storey), partially covered rear ground floor deck with stairs, and a rear second storey balcony above. The existing rear ground floor deck and the rear basement walkout will be demolished. Also, to install a front yard parking pad.
190 m away · filed Jul 2, 2025 · Approved
80 Ellis Park Rd · Minor variance
To construct a new three-storey detached dwelling with green roof, a front two-car integral garage, a front cantilevered terrace with stairs, front second storey and rear first storey green roof canopies, a rear basement walkout, a rear first floor deck with an integral hot tub and stairs, and front and rear third storey balconies. There will be one secondary suite within the basement.
60 m away · filed Apr 30, 2025 · Approved
14 Dacre Cres · Minor variance
The current application is necessitated to identify a revised side yard setback to the detached dwelling (as cited in Variance Number 1 below). To construct a new three-storey detached dwelling with a front ground covered deck with stairs, a front integral garage, two front second storey balconies (with planters), a rear second storey balcony (with planters), a front third storey balcony, and two rear third storey balconies (with planters) as approved by Minor Variance Decision A0789/23TEY.
60 m away · filed Jan 10, 2024 · Approved
76 Ellis Park Rd · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a front covered porch and stairs, a rear ground floor covered porch and stairs, front balconies on the second and third storeys, as well as rear second storey Juliet balconies.
60 m away · filed Sep 27, 2023 · Approved
14 Dacre Cres · Minor variance
To construct a new three-storey detached dwelling with a front staircase, a front ground floor deck with stairs, an integral garage with a ramp up entry, two front second storey balconies, a front second storey platform with planter, a front third storey balcony, a rear second storey balcony, a rear platform with planter along the second storey, two rear third storey balconies, and two rear third storey platforms with planter.
60 m away · filed Sep 12, 2023 · Approved
84 Ellis Park Rd · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a partial rear one-storey addition, a partial rear second storey addition over a rear ground floor deck, and a rear second storey deck.
80 m away · filed May 23, 2023 · Approved
2 Wendigo Way · Minor variance
To construct a new three-storey detached dwelling with an integral garage, a second storey front covered porch, and a second storey rear deck with exterior stairs
210 m away · filed Apr 13, 2023 · Approved
19 Dacre Cres · Minor variance
To alter the existing two-storey detached dwelling by reconstructing the existing rear ground floor deck.
50 m away · filed Mar 30, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.