Toronto address · Ward 11, University-Rosedale
11 Henry St
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Porch
To re-construct an open covered front porch in the same location.
Applied Sep 3, 2014 · issued Oct 7, 2014 · completed Feb 2, 2026 · Permit 14 215780 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
18 storeys · Non-residential
150 m away · Site plan · Under review · filed Jun 1, 2022
- Under review
191-199 College Street and 74-76 Henry Street
31 storeys · 492 homes · Mixed use
240 m away · Site plan · Under review · filed Aug 28, 2022
- Under review
61 storeys · 475 homes · Residential
300 m away · Site plan · Under review · filed Sep 1, 2021
- Under review
64 storeys · 579 homes · Mixed use
340 m away · Site plan · Under review · filed Aug 17, 2022
- Approved
- Under review
Not stated in the file
370 m away · Subdivision · Under review · filed Nov 5, 2021
Neighbours’ Committee of Adjustment files within 250 m
28 D'Arcy St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition, and a new rear three-storey addition (with a basement walkout level). Also, to construct a rear exterior staircase that will access each level. There will be a total of 4 residential dwelling units on this lot. The existing rear two-storey ancillary building will be maintained and unaltered.
170 m away · filed Dec 31, 2024 · Approved
202 Beverley St · Minor variance
To alter the existing three-storey detached dwelling by constructing a rear one-storey addition over the existing ground floor deck.
140 m away · filed Nov 6, 2024 · Postponed
41 D'Arcy St · Minor variance
The existing three-storey detached building (containing 15 residential dwelling rooms) will be maintained and unaltered.
220 m away · filed Feb 7, 2024 · Approved
41 D'Arcy St · Consent
To obtain consent to sever the property into two residential lots.
220 m away · filed Feb 7, 2024 · Approved
78 Baldwin St · Minor variance
To construct a new four-storey semi-detached duplex building with a front covered porch and stairs, a rear ground floor deck and stairs, a second storey front balcony, as well as a rear third storey rooftop deck. The existing party wall with the adjacent semi-detached dwelling (municipally known as 76 Baldwin Street) will be maintained.
240 m away · filed Jul 11, 2023 · Approved
9 Baldwin St · Minor variance
To alter the existing commercial building by constructing a ground level 32 seat patio (with a pergola) along the side (east) and rear of the building.
120 m away · filed Dec 9, 2022 · Approved
200 Elm St · Minor variance
To convert the existing ground floor commercial space into nine (9) residential dwelling units. This 13-storey building will have a total of 127 residential dwelling units.
190 m away · filed Sep 2, 2022 · Approved
41 Henry St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front basement walkout, a rear two-storey addition with a second floor side balcony, and a rear third storey addition with a rear terrace. One primary unit and two secondary suites will be provided for a total of three dwelling units. Also, the one-storey ancillary building (detached garage) in the rear yard, abutting the laneway, will be maintained.
120 m away · filed May 26, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.