Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 6, York Centre

11 Sunbeam Ave

The City of Toronto has 2 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Interior alterations

    Load bearing wall removal on the main floor of existing detached single dwelling unit.

    Applied Mar 24, 2025 · issued Mar 27, 2025 · Permit 25 133931 BLD

    Inspections under way
  • Small residential project · Interior alterations

    Load bearing wall removal on the main floor of existing detached single dwelling unit.

    Applied Mar 5, 2025 · completed Mar 13, 2025 · Permit 25 125178 BLD

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 100 King High Ave · Minor variance

    To construct a new two-storey dwelling.

    240 m away · filed Sep 30, 2025 · Approved

  • 15 Sunbeam Ave · Minor variance

    Proposal to construct a 2 storey dwelling with a portico, uncovered porch and rear covered deck.

    20 m away · filed Dec 19, 2023 · conditional approval

  • 8 Sunbeam Ave · Minor variance

    Proposal to construct a new dwelling.

    70 m away · filed Apr 20, 2023 · Approved

  • 153 Palm Dr · Minor variance

    Proposal to construct a new patio roof at the rear of the existing dwelling.

    250 m away · filed Apr 17, 2023 · Approved

  • 15 Faith Ave · Minor variance

    Proposal to construct a two storey dwelling with a covered porch, deck and rear walkout.

    120 m away · filed Feb 16, 2023 · Approved

  • 1 Sunbeam Ave · Minor variance

    To construct a new dwelling.

    90 m away · filed Nov 23, 2022 · Approved

  • 34 Dresden Rd · Minor variance

    To construct a side addition to the ground floor with a full second floor addition above the existing ground floor.

    200 m away · filed Jan 8, 2021 · Approved

  • 20 Sunbeam Ave · Minor variance

    To construct a new dwelling.

    90 m away · filed Nov 10, 2020 · Approved

Everything planned in York Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.