Toronto address · Ward 4, Parkdale-High Park
110 The Queensway
The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Upgrades to existing municipal pumping station: work includes upgrading of HVAC system, replacement of existing process pumps, electrical upgrades to suite the new pumping equipment and various structural modifications (sealing the existing interior wetwell accessway and creating a new wetwell accessway, grating replacment, new floor/roof openings for exhaust fans and electrical wiring.)
Applied Sep 12, 2008 · issued Oct 28, 2008 · Permit 08 201475 HVA
- Inspections under way
Addition or alteration · Multiple projects
Upgrades to existing municipal pumping station: work includes upgrading of HVAC system, replacement of existing process pumps, electrical upgrades to suite the new pumping equipment and various structural modifications (sealing the existing interior wetwell accessway and creating a new wetwell accessway, grating replacment, new floor/roof openings for exhaust fans and electrical wiring.)
Applied Sep 9, 2008 · issued Oct 28, 2008 · Permit 08 201475 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
32 storeys · 397 homes · Residential
270 m away · Rezoning · Approved · filed Dec 24, 2025
- Under review
1978-2002 Lake Shore Boulevard West
698 homes · Residential
350 m away · Site plan · Under review · filed Apr 26, 2022
- Under review
35 storeys · 639 homes · Residential
380 m away · Site plan · Under review · filed May 21, 2026
Neighbours’ Committee of Adjustment files within 250 m
21 South Kingsway · Minor variance
To alter the existing one-and-one-half-storey detached dwelling by constructing a front two storey addition with a front covered porch, a rear two-storey addition with a second storey balcony, and a rear ground floor covered deck.
240 m away · filed Sep 28, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.