Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

111 1/2 Soudan Ave

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposed interior alterations to create new passage openings between 111 and 111 1/2 Soudan Ave, as well as new powder room.

    Applied Jan 3, 2020 · issued Jun 8, 2020 · completed Apr 29, 2021 · Permit 20 100703 PLB

    Closed
  • Small residential project · Interior alterations

    Proposed interior alterations to create new passage openings between 111 and 111 1/2 Soudan Ave, as well as new powder room.

    Applied Jan 3, 2020 · issued Jun 8, 2020 · completed Apr 29, 2021 · Permit 20 100703 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 78 Hillsdale Ave E · Minor variance

    To construct a new three-storey detached dwelling (basement level is considered the first storey) with an integral garage, a front porch, a rear basement walkout, and a rear second level deck.

    140 m away · filed Apr 16, 2025 · Approved

  • 57 Soudan Ave · Minor variance

    To permit the continued use on the site as a dental office, as well as to permit the conversion of the second floor of the building into additional dentist office space.

    160 m away · filed Jan 27, 2025 · Approved

  • 55 Redpath Ave · Minor variance

    To alter the existing one-storey ancillary building (two-car detached garage), in the rear yard, by constructing a one-storey addition (to contain one garden suite) on the north side of the building. The existing two parking spaces within the remaining southern portion of the ancillary building will be maintained. There will be a total of two residential dwelling units on this lot (one in the main dwelling and one in the garden suite).

    190 m away · filed Jun 27, 2024 · Approved

  • 71 Redpath Ave · Consent

    To obtain consent to sever portions of the land (a below-grade strata) for the purpose of lot additions and to create new easements/rights-of-way.

    220 m away · filed Apr 26, 2024 · Approved

  • 71 Redpath Ave · Consent

    To obtain consent to sever portions of the land (a below-grade strata) for the purpose of lot additions and to create new easements/rights-of-way.

    220 m away · filed Mar 5, 2024 · Approved

  • 121 Soudan Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by enclosing the existing porch, and constructing a new porch with stairs, and a new walkway.

    40 m away · filed Feb 23, 2024 · Approved

  • 104 Manor Rd E · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, a complete third storey addition, a front covered porch, a rear ground floor deck, and front and rear third storey terraces.

    180 m away · filed Sep 28, 2023 · Approved

  • 149 Hillsdale Ave E · Minor variance

    To remove the existing rear yard parking space.

    120 m away · filed Oct 28, 2022 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.