Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

111 Bloor St W

The City of Toronto has 3 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    Proposal to replace 3 RTU Units and 1 Condensing Unit on the rooftop of an existing retail store - "Dolce & Gabbana"

    Applied May 31, 2018 · issued Jul 3, 2018 · completed Mar 28, 2023 · Permit 18 168903 MSA

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Backflow Prevention Devices (Water only) *Dolce and Gabana* in basement

    Applied Dec 5, 2016 · issued Jan 6, 2017 · completed Jul 28, 2023 · Permit 16 259992 PSA

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install (1) backflow prevention device for premise isolation.

    Applied Nov 16, 2016 · issued Nov 21, 2017 · completed Jul 28, 2023 · Permit 16 252133 PSA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 6 St Thomas St · Consent

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.

    90 m away · filed May 26, 2026 · Hearing scheduled

  • 2 St Thomas St · Consent

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.

    120 m away · filed Dec 31, 2025 · Hearing scheduled

  • 70 St Mary St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-Law 1422-2017), for the 40-storey mixed-use building by: increasing the podium height (from 3-storeys to 6-storeys); and altering building setbacks (in order to consolidate the non-residential institutional uses within the podium). No changes to the tower or residential uses are proposed. Also, to reduce the minimum required number of parking spaces for institutional uses (from 11 parking spaces to 5 parking spaces), which will be located within underground parking level P1.

    220 m away · filed Dec 9, 2024 · Approved

  • 128 Cumberland St · Minor variance

    To alter the existing three storey commercial building by constructing a new exit stair on the roof.

    160 m away · filed Oct 30, 2024 · Application withdrawn

  • 80 Bloor St W · Minor variance

    To alter the development standards for the 78-storey mixed-use building (as approved under Site Specific Zoning By-law XXX-XXXX(OLT)) by increasing the total residential gross floor area, removing the minimum gross floor area for office uses, altering the building envelope (as shown in Revised Diagram 3 and Revised Diagram 4), and removing the minimum required residential parking spaces.

    150 m away · filed Jul 11, 2024 · Postponed

  • 7 Sultan St · Minor variance

    To alter the existing 9-storey commercial building by constructing a front ground floor one-storey addition (vestibule with an integrated rain water management system) fronting Sultan Street between two office condominium units (5 and 7 Sultan Street).

    110 m away · filed May 14, 2024 · Approved

  • 130 Bloor St W · Minor variance

    To alter the existing 22-storey mixed-use building by reducing the amount of parking spaces provided in the underground parking garage.

    110 m away · filed Apr 29, 2024 · Approved

  • 130 Bloor St W · Minor variance

    To alter the existing ramps for pedestrian access for two existing retail units (114 and 115) by increasing the slopes.

    110 m away · filed Apr 12, 2023 · Approved

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.