Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 21, Scarborough Centre

111 Ellesmere Rd

The City of Toronto has 7 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal for interior alterations to existing unit for take-out restaurant followed by the installation of new internal walls and finishes.

    Applied Oct 21, 2024 · issued Jan 20, 2025 · completed Jun 16, 2025 · Permit 24 228765 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to existing unit for take-out restaurant followed by the installation of new internal walls and finishes.

    Applied Oct 21, 2024 · issued Jan 22, 2025 · completed Jun 17, 2025 · Permit 24 228765 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to existing unit for take-out restaurant followed by the installation of new internal walls and finishes.

    Applied Oct 21, 2024 · issued Jan 20, 2025 · completed Jun 10, 2025 · Permit 24 228765 BLD

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install a Back flow Prevention Device

    Applied Nov 14, 2017 · issued Nov 23, 2017 · completed Jan 5, 2018 · Permit 17 262101 PSA

    Closed
  • Heating and ventilation

    HVAC - interior alterations to convert unit to spa

    Applied Jun 9, 2017 · issued Jul 10, 2017 · completed Jan 2, 2026 · Permit 17 177012 HVA

    Closed
  • Addition or alteration · Interior alterations

    interior alterations to convert unit to spa

    Applied Jun 9, 2017 · issued Jul 10, 2017 · Permit 17 177012 BLD

    Inspections under way
  • Plumbing

    Plumbing - interior alterations to convert unit to spa

    Applied Jun 9, 2017 · issued Jul 10, 2017 · Permit 17 177012 PLB

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To permit an outdoor patio in the Parking Lot.

    Decision: Approved (hearing Aug 13, 2025)

    Filed May 30, 2025 · File A0131/25SC

    Closed

What’s planned nearby

Development sites within 500 m

  • 36 Ellesmere Road

    12 storeys · 187 homes · Mixed use

    380 m away · Site plan · Under review · filed Nov 23, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 31 Marchington Crcl · Minor variance

    To alter the existing one-storey detached dwelling by constructing a second storey addition and a side two-storey addition (add in direction) with integral garage and canopies above the front porch and rear ground floor deck.

    120 m away · filed Jan 22, 2025 · Approved

  • 5 Waringstown Dr · Minor variance

    To construct a new dwelling.

    190 m away · filed Sep 29, 2021 · Approved

  • 157 Ellesmere Rd · Minor variance

    The applicant is seeking relief from the provisions of the Zoning By-law to construct a new second storey addition to the existing single family residential dwelling.

    220 m away · filed Nov 22, 2019 · Approved

  • 18 Marchington Crcl · Minor variance

    Proposed rear two storey addition, attached garage, and front veranda.

    50 m away · filed May 22, 2019 · Approved

  • 10 Marchington Crcl · Minor variance

    The applicant is seeking relief from the provisions of the Zoning By-law to construct a new two storey rear addition and a second storey addition over the existing single family dwelling with an attached garage.

    100 m away · filed Mar 26, 2017 · Approved

Everything planned in Scarborough Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.