Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 25, Scarborough-Rouge Park

111 Misty Hills Trl

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Accessory Building(s)

    Proposed new basement walkout

    Applied Oct 27, 2020 · issued Nov 5, 2020 · completed Mar 1, 2021 · Permit 20 211757 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 46 Misty Hills Trl · Minor variance

    To alter the existing two-storey dwelling by constructing a rear yard sunroom addition.

    130 m away · filed Jun 11, 2026 · Approved

  • 49 Knowles Dr · Minor variance

    To permit the construction of a rear addition to the existing dwelling for a sunroom. REQUESTED VARIANCE(S) TO THE ZONING BY-LAW:1. Chapter 10.20.40.70 (2), By-law No. 569-2013The minimum required rear yard setback is 7.5 metres. The proposed minimum rear yard setback from the rear addition is 3.87 metres.2. Chapter 10.20.40.20 (1), By-law No. 569-2013 The permitted maximum building length for a detached house is 17.0 metres. The proposed permitted maximum building length for a detached house 18.67 metres.3. Chapter 10.20.40.30 (1), By-law No. 569-2013The permitted maximum building depth for…

    190 m away · filed Oct 23, 2020 · Approved

Everything planned in Scarborough-Rouge Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.