Toronto address · Ward 11, University-Rosedale
112 College St
The City of Toronto has 57 building permits since 2017 (25 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Plumbing
Revision 2: Plumbing permit revision.Revision to hvac - kitchen reconfiguration.Plumbing - Proposal for interior fit-up for a new restaurant.
Applied Sep 8, 2026 · issued Sep 14, 2026 · Permit 25 153160 PLB (revision 02)
- Inspections under way
Plumbing
Plumbing - Incoming electrical and mechanical services are being installed from base building service rooms to tenant space. Work within space is being completed in a separate permit.
Applied Jun 17, 2026 · issued Jul 15, 2026 · Permit 26 186557 PLB
- Inspections under way
Addition or alteration · Interior alterations
Incoming electrical and mechanical services are being installed from base building service rooms to tenant space. Work within space is being completed in a separate permit 25-126581.
Applied Jun 17, 2026 · issued Jul 14, 2026 · Permit 26 186557 BLD
- Inspections under way
Heating and ventilation
HVAC - Incoming electrical and mechanical services are being installed from base building service rooms to tenant space. Work within space is being completed in a separate permit.
Applied Jun 17, 2026 · issued Jul 14, 2026 · Permit 26 186557 HVA
- Permit issued
Plumbing
Plumbing - Proposal for interior alterations on third and forth floor.
Applied May 11, 2026 · issued Jun 26, 2026 · Permit 26 158661 PLB
- Permit issued
Addition or alteration · Interior alterations
Proposal for interior alterations on third and forth floor.
Applied May 11, 2026 · issued Jun 26, 2026 · Permit 26 158661 BLD
- Permit issued
Heating and ventilation
HVAC - Proposal for interior alterations on third and forth floor.
Applied May 11, 2026 · issued Jun 26, 2026 · Permit 26 158661 HVA
- Cancelled
Heating and ventilation · Other
Incoming electrical and mechanical services are being installed from base building service rooms to tenant space. Work within space is being completed in a separate permit.
Applied May 1, 2026 · completed May 13, 2026 · Permit 26 153625 MSA
- Cancelled
Plumbing · Other
Incoming electrical and mechanical services are being installed from base building service rooms to tenant space. Work within space is being completed in a separate permit.
Applied May 1, 2026 · completed May 13, 2026 · Permit 26 153649 PSA
- Revision issued
Plumbing
Revision to hvac - kitchen reconfiguration.Plumbing - Proposal for interior fit-up for a new restaurant.
Applied Mar 25, 2026 · issued Apr 14, 2026 · Permit 25 153160 PLB (revision 01)
- Revision issued
Heating and ventilation
Revision to kitchen reconfiguration.HVAC - Proposal for interior fit-up for a new restaurant.
Applied Mar 25, 2026 · issued Apr 14, 2026 · Permit 25 153160 HVA (revision 01)
- Revision issued
Addition or alteration · Interior alterations
Revsion 01: Revision to approved kitchen layout.Proposal for interior fit-up for a new restaurant.
Applied Mar 24, 2026 · issued Apr 22, 2026 · Permit 25 153160 BLD (revision 01)
Show 45 more permits
- Closed
Heating and ventilation
REV01: Proposed revision for the exhaust ductwork in Kitchen W613 connecting to a non fire-rated partition in accordance with the current as-built condition on site. Mechanical drawing M106 has been updated with bubble to reflect this scope.HVAC - Proposed work is an interior office fit-out inside suite 610 on the existing 6th Floor of the Schwartz Reisman Innovation Campus West Tower. The program of the proposed work includes two open workstation areas, a meeting room, a private breakout room, two private offices, a kitchen with dining area, a reception area, two storage areas, and space to…
Applied Aug 22, 2025 · issued Sep 24, 2025 · completed Oct 6, 2025 · Permit 25 126581 HVA (revision 01)
- Permit issued
Fire and security upgrade · Sprinklers
Proposal for interior fit-up for a new restaurant.
Applied Jun 13, 2025 · issued Jul 14, 2025 · Permit 25 177139 FSU
- Permit issued
Heating and ventilation
HVAC - Proposal for interior fit-up for a new restaurant.
Applied Jun 13, 2025 · issued Aug 15, 2025 · Permit 25 153160 HVA
- Permit issued
Plumbing
Plumbing - Proposal for interior fit-up for a new restaurant.
Applied Jun 13, 2025 · issued Aug 15, 2025 · Permit 25 153160 PLB
- Permit issued
Addition or alteration · Interior alterations
Proposal for interior fit-up for a new restaurant.
Applied May 2, 2025 · issued Aug 15, 2025 · Permit 25 153160 BLD
- Closed
Heating and ventilation
HVAC - Proposed work is an interior office fit-out inside suite 610 on the existing 6th Floor of the Schwartz Reisman Innovation Campus West Tower. The program of the proposed work includes two open workstation areas, a meeting room, a private breakout room, two private offices, a kitchen with dining area, a reception area, two storage areas, and space to accommodate existing private pods. New plumbing work for the kitchen is being proposed. New HVAC work to serve this office suite is being proposed. New electrical and lighting work are being proposed. All proposed HVAC, plumbing, electrical…
Applied Mar 10, 2025 · issued Apr 4, 2025 · completed Oct 6, 2025 · Permit 25 126581 HVA
- Closed
Addition or alteration · Interior alterations
Proposed work is an interior office fit-out inside suite 610 on the existing 6th Floor of the Schwartz Reisman Innovation Campus West Tower. The program of the proposed work includes two open workstation areas, a meeting room, a private breakout room, two private offices, a kitchen with dining area, a reception area, two storage areas, and space to accommodate existing private pods. New plumbing work for the kitchen is being proposed. New HVAC work to serve this office suite is being proposed. New electrical and lighting work are being proposed. All proposed HVAC, plumbing, electrical and lig…
Applied Mar 10, 2025 · issued Mar 28, 2025 · completed Dec 15, 2025 · Permit 25 126581 BLD
- Closed
Plumbing
Plumbing - Proposed work is an interior office fit-out inside suite 610 on the existing 6th Floor of the Schwartz Reisman Innovation Campus West Tower. The program of the proposed work includes two open workstation areas, a meeting room, a private breakout room, two private offices, a kitchen with dining area, a reception area, two storage areas, and space to accommodate existing private pods. New plumbing work for the kitchen is being proposed. New HVAC work to serve this office suite is being proposed. New electrical and lighting work are being proposed. All proposed HVAC, plumbing, electri…
Applied Mar 10, 2025 · issued Mar 31, 2025 · completed Aug 8, 2025 · Permit 25 126581 PLB
- Closed
Heating and ventilation
HVAC - Interior alterations to offices in Unit 580
Applied Jan 29, 2025 · issued Mar 13, 2025 · completed Oct 23, 2025 · Permit 25 110033 HVA
- Closed
Addition or alteration · Interior alterations
Interior alterations to offices in Unit 580
Applied Jan 29, 2025 · issued Feb 18, 2025 · completed Nov 5, 2025 · Permit 25 110033 BLD
- Closed
Plumbing
Plumbing - Interior alterations to offices in Unit 580
Applied Jan 29, 2025 · issued Mar 13, 2025 · completed Aug 26, 2025 · Permit 25 110033 PLB
- Closed
Designated structure · Sign building permit related
1 ground sign**schwartz reisman****innovation campus**
Applied May 29, 2024 · issued Jun 4, 2024 · completed Dec 17, 2024 · Permit 24 155900 DST
- Revision issued
Heating and ventilation
Revision 03: stamped record drawings for levels 1-4 are provided as required by the inspector to align the as-built conditions with the general intent of the previously submitted design drawingsREV #2-Building revisions to building permit 20 107981 BLD 01 NB. Provision for property owners and municipality to enter into a limiting distance agreement of 2.8m past the north property line to permit the removal of fire compartments and protecting construction to unprotected openings to the north elevation of the buildingREV #1-FIRE COMPARTMENT TO INCREASE UNPROTECTED OPENINGS TO NORTH ELEVATIONHVA…
Applied May 7, 2024 · issued Jun 28, 2024 · Permit 20 107981 HVA (revision 03)
- Closed
Heating and ventilation
Revision 01: stamped record drawings for level 9 corridor provided as required by inspector to align the as-bult conditions with the general intent of the previously submitted drwgsHVAC - LEVEL 9 LANDLORD NEW CORRIDOR AND DEMSING WALLS TO DIVIDE FLOOR PLATE INTO 3 TENANT SPACES.
Applied May 7, 2024 · issued Jun 24, 2024 · completed Aug 20, 2024 · Permit 23 225700 HVA (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal to construct Interior fit-out of a tenant suite on a multi-tenant floor, scope includes erection of non-bearing partitions, the re-alignment and redistribution of the Electrical and Mechanical and Life Safety systems.
Applied Mar 12, 2024 · issued Apr 16, 2024 · completed Sep 27, 2024 · Permit 24 124628 HVA
- Closed
Plumbing
Plumbing - Proposal to construct Interior fit-out of a tenant suite on a multi-tenant floor, scope includes erection of non-bearing partitions, the re-alignment and redistribution of the Electrical and Mechanical and Life Safety systems.
Applied Mar 12, 2024 · issued Apr 16, 2024 · completed Sep 27, 2024 · Permit 24 124628 PLB
- Closed
Addition or alteration · Interior alterations
Proposal to construct Interior fit-out of a tenant suite on a multi-tenant floor, scope includes erection of non-bearing partitions, the re-alignment and redistribution of the Electrical and Mechanical and Life Safety systems.
Applied Mar 12, 2024 · issued Mar 26, 2024 · completed Oct 11, 2024 · Permit 24 124628 BLD
- Cancelled
Designated structure · Sign building permit related
4 ground sign 1 wall 2 window sign
Applied Jan 15, 2024 · completed Jan 19, 2024 · Permit 24 104910 DST
- Closed
Heating and ventilation
Hvac - level 9 landlord new corridor and demsing walls to divide floor plate into 3 tenant spaces.
Applied Nov 14, 2023 · issued Dec 14, 2023 · completed Aug 20, 2024 · Permit 23 225700 HVA
- Closed
Plumbing
Plumbing - LEVEL 9 LANDLORD NEW CORRIDOR AND DEMSING WALLS TO DIVIDE FLOOR PLATE INTO 3 TENANT SPACES.
Applied Nov 14, 2023 · issued Dec 14, 2023 · completed Apr 2, 2024 · Permit 23 225700 PLB
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to a base building shell floor level 9 for landlord work to construct demising walls for a new multi-tenant corridor & to split the floor into 3 (vacant) tenant spaces. (Occupancy permits required for vacant shell office & institutional uses (classrooms).) [U of T Schwartz Reisman Innovation Campus (SRIC) - West Building.]
Applied Nov 14, 2023 · issued Dec 14, 2023 · completed Apr 25, 2024 · Permit 23 225700 BLD
- Revision issued
Heating and ventilation
REV #2-Building revisions to building permit 20 107981 BLD 01 NB. Provision for property owners and municipality to enter into a limiting distance agreement of 2.8m past the north property line to permit the removal of fire compartments and protecting construction to unprotected openings to the north elevation of the buildingREV #1-FIRE COMPARTMENT TO INCREASE UNPROTECTED OPENINGS TO NORTH ELEVATIONHVAC - Proposal to construct a new 15 storey building with office and institutional uses (classrooms), 1 level of below grade parking and 2 levels of mechanical penthouse.See also 19 171637 SA, 19…
Applied Sep 6, 2023 · issued Oct 26, 2023 · Permit 20 107981 HVA (revision 02)
- Cancelled
New building
REv#2- Building revisions to building permit 20 107981 BLD 01 NB. Provision for property owners and municipality to enter into a limiting distance agreement of 2.8m past the north property line to permit the removal of fire compartments and protecting construction to unprotected openings to the north elevation of the buildingREV #1-FIRE COMPARTMENT TO INCREASE UNPROTECTED OPENINGS TO NORTH ELEVATIONProposal to construct a new 15 storey building with office and institutional uses (classrooms), 1 level of below grade parking and 2 levels of mechanical penthouse.See also 19 -147031 STE 11 SA, 19…
Applied Sep 6, 2023 · completed Jan 11, 2024 · Permit 20 107981 BLD (revision 02)
- Revision issued
New building
REV #1-FIRE COMPARTMENT TO INCREASE UNPROTECTED OPENINGS TO NORTH ELEVATIONProposal to construct a new 15 storey building with office and institutional uses (classrooms), 1 level of below grade parking and 2 levels of mechanical penthouse.See also 19 -147031 STE 11 SA, 19 160851 DEM, and 19 171637 BLD.
Applied May 31, 2022 · issued Sep 26, 2022 · Permit 20 107981 BLD (revision 01)
- Revision issued
Heating and ventilation
REV #1-FIRE COMPARTMENT TO INCREASE UNPROTECTED OPENINGS TO NORTH ELEVATIONHVAC - Proposal to construct a new 15 storey building with office and institutional uses (classrooms), 1 level of below grade parking and 2 levels of mechanical penthouse.See also 19 171637 SA, 19 160851 DEM, and 19 171637 BLD.
Applied May 31, 2022 · issued Jul 19, 2022 · Permit 20 107981 HVA (revision 01)
- Closed
Fire and security upgrade · Electromagnetic locks
Proposed 12 maglocks.- Electromagnetic Locking Devices to doors 2no. Level 1 D115K, D180S; 2no. Level 3 D370S, D325S; 2no. Level 8 , D870S, D825S; 1no. Level 11 D1100V; 1no. Level 12 D1200AV; 4no. Level 13 D1300AV, D1370S, D1325S, D1325V. Refer attached Architectural drawings.
Applied Oct 21, 2021 · issued Dec 3, 2021 · completed May 7, 2024 · Permit 21 228738 FSU
- Approved
Alternative solution
Proposal for alternative solution to address the approach to code compliance related to the omission of draft stops and closely spaced sprinklers, required by NFPA 13, "standard for the installation of automatic sprinklers" at minor construction of otherwise large floor openings between levels 01 and 02 of the project.
Applied Oct 4, 2021 · completed Nov 5, 2021 · Permit 21 221343 ALT
- Approved
Alternative solution
Proposed alternative solution for egress from the Mechanical Penthouse to include fixed ladders conforming to sentence 3.6.1.5 (1)
Applied Apr 19, 2021 · completed May 14, 2021 · Permit 21 142844 ALT
- Cancelled
Conditional permit · Partial permit - structural framing
Conditional Permit - Part Permit - Proposal to construct a new 15 storey building with office and institutional uses (classrooms), 1 level of below grade parking and 2 levels of mechanical penthouse.See also 19 -147031 STE 11 SA, 19 160851 DEM, and 19 171637 BLD.
Applied Feb 4, 2021 · issued Feb 19, 2021 · completed May 14, 2021 · Permit 20 107981 STR
- Cancelled
Conditional permit · Partial permit - foundation
Conditional Permit - Part Permit - Proposal to construct a new 15 storey building with office and institutional uses (classrooms), 1 level of below grade parking and 2 levels of mechanical penthouse.See also 19 171637 SA, 19 160851 DEM, and 19 171637 BLD.
Applied Sep 28, 2020 · issued Oct 9, 2020 · completed Feb 19, 2021 · Permit 20 107981 FND
- Cancelled
Conditional permit · Partial permit - shoring
Conditional Permit - Part Permit - Proposal to construct a new 15 storey building with office and institutional uses (classrooms), 1 level of below grade parking and 2 levels of mechanical penthouse.See also 19 147031 STE 11 SA, 19 160851 DEM, and 19 171637 BLD.
Applied Sep 10, 2020 · issued Oct 1, 2020 · completed Oct 9, 2020 · Permit 20 107981 SHO
- Closed
Fire and security upgrade
FS - Sprinkler Shop Drawing - Proposal to construct a new 15 storey building with office and institutional uses (classrooms), 1 level of below grade parking and 2 levels of mechanical penthouse.See also 19 171637 SA, 19 160851 DEM, and 19 171637 BLD.
Applied Jun 12, 2020 · issued Nov 16, 2021 · completed Nov 16, 2021 · Permit 20 107981 FSU
- Refused
Alternative solution
Alternative solution to address the OBC requirement to restrict the unprotected openings in the exposing building faces with Close spaced sprinkler
Applied Jan 23, 2020 · completed Jun 23, 2021 · Permit 20 107996 ALT
- Closed
Plumbing
Plumbing - Proposal to construct a new 15 storey building with office and institutional uses (classrooms), 1 level of below grade parking and 2 levels of mechanical penthouse.See also 19 171637 SA, 19 160851 DEM, and 19 171637 BLD.
Applied Jan 23, 2020 · issued Feb 22, 2021 · completed Jun 5, 2024 · Permit 20 107981 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct a new 15 storey building with office and institutional uses (classrooms), 1 level of below grade parking and 2 levels of mechanical penthouse.See also 19 171637 SA, 19 160851 DEM, and 19 171637 BLD.
Applied Jan 23, 2020 · issued Feb 25, 2021 · Permit 20 107981 HVA
- Inspections under way
New building
Proposal to construct a new 15 storey building with office and institutional uses (classrooms), 1 level of below grade parking and 2 levels of mechanical penthouse.See also 19 -147031 STE 11 SA, 19 160851 DEM, and 19 171637 BLD.
Applied Jan 23, 2020 · issued May 14, 2021 · Permit 20 107981 BLD
- Closed
Drains and site services · Inside and outside drains
Drain - Proposal to construct a new 15 storey building with office and institutional uses (classrooms), 1 level of below grade parking and 2 levels of mechanical penthouse.See also 19 171637 SA, 19 160851 DEM, and 19 171637 BLD.
Applied Jan 23, 2020 · issued Nov 10, 2020 · completed Jun 5, 2024 · Permit 20 107981 STS
- Closed
Drains and site services
Drain - Proposal to construct a new 15 storey building with office and institutional uses (classrooms), 1 level of below grade parking and 2 levels of mechanical penthouse.See also 19 171637 SA, 19 160851 DEM, and 19 171637 BLD.
Applied Jan 23, 2020 · issued Nov 9, 2020 · completed Jun 5, 2024 · Permit 20 107981 DRN
- Closed
Demolition
REVISION - Demolition of below grade portion of Best Building at 112 College Street, including installation of caissons and complete shoring systemTo be read in conjunction with Permit 19 160851 DEM 0Proposal to demolish ONLY the above grade portions of an existing 5 storey vacant office building.ALSO REFER TO 19-160851 BLD 00 BA FOR RELATED ALTERATIONS TO 100 COLLLEGE ST
Applied Dec 20, 2019 · issued May 22, 2020 · completed Mar 15, 2021 · Permit 19 160851 DEM (revision 01)
- Closed
Demolition
Proposal to demolish ONLY the above grade portions of an existing 5 storey vacant office building.ALSO REFER TO 19-160851 BLD 00 BA FOR RELATED ALTERATIONS TO 100 COLLLEGE ST
Applied May 28, 2019 · issued Dec 9, 2019 · completed Mar 15, 2021 · Permit 19 160851 DEM
- Closed
Addition or alteration · Addition(s)
Construct sunroom addition to south east elevation. (approximately 20.8 sq. m). Refer to C of A Decision. A.Osler 10/06/03
Applied Apr 28, 2003 · issued Nov 12, 2003 · completed May 28, 2026 · Permit 03 126956 BLD
- Inspections under way
Heating and ventilation
HVAC - Make interior alterations to portion of the basement (rooms 70 & 72) for laboratory & office purposes. Also install skylight. (Best Institute) - Multiple Projects
Applied Sep 13, 2002 · issued Sep 16, 2002 · Permit 02 130792 HVA
- Permit issued
Addition or alteration · Multiple projects
Make interior alterations to portion of the basement (rooms 70 & 72) for laboratory & office purposes. Also install skylight. (Best Institute)
Applied Apr 26, 2002 · issued Sep 16, 2002 · Permit 02 130792 BLD
- Closed
Addition or alteration · Interior alterations
make interior alterations to portion of basement rooms 70 & 72, for wet lab researchbest institute
Applied Nov 9, 2001 · issued Dec 6, 2001 · completed May 27, 2026 · Permit 01 193717 BLD
- Inspections under way
Addition or alteration · Interior alterations
Make interior alterations to portion of the first floor for seminar room and alter portion of the South elevation for door and window opening. Also make interior alterations to portions of the 3rd and 4th floor for research labs.
Applied Aug 1, 2001 · issued Aug 3, 2001 · Permit 01 164618 CMB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
61 storeys · 475 homes · Residential
220 m away · Site plan · Under review · filed Sep 1, 2021
- Approved
- Submitted
249 homes · Not stated in the file
410 m away · Site plan · Submitted · filed Sep 2, 2026
- Under review
18 storeys · Non-residential
410 m away · Site plan · Under review · filed Jun 1, 2022
- Approved
1-23 College Street and 420-444 Yonge Street
96 storeys · 2,342 homes · Residential
430 m away · Rezoning · Approved · filed Jul 9, 2025
- Under review
64 storeys · 579 homes · Mixed use
490 m away · Site plan · Under review · filed Aug 17, 2022
Neighbours’ Committee of Adjustment files within 250 m
700 University Ave · Consent
To obtain consent to sever the property into three lots (one residential lot and two mixed-use lots).
210 m away · filed Jan 16, 2023 · Approved
700 University Ave · Minor variance
To alter Site Specific Zoning By-law 916-2022 to permit the construction of a development comprised of a 58-storey purpose-built rental residential building and to alter the existing 20-storey office building by constructing an additional 5 storeys.
210 m away · filed Jan 16, 2023 · Approved
150 College St · Minor variance
To legalize the existing parking deficiency for the University of Toronto's St. George Campus and permit an additional reduction of 27 parking spaces by constructing an underground parking structure for the Campus.
240 m away · filed Dec 23, 2020 · Approved
150 College St · Minor variance
To expand the pedestrian and cyclist focused open spaces and pathways at-grade and construct a new single level below-grade parking garage.
240 m away · filed Sep 26, 2019 · Approved
150 College St · Minor variance
To legalize and maintain a one-storey addition (a research lab) on the rooftop of an existing three-storey university building.
240 m away · filed May 3, 2019 · Approved
585 University Ave · Consent
To obtain consent for the creation of easements and rights-of-way.
240 m away · filed Dec 11, 2018 · Approved
661 University Ave · Consent
To obtain consent for the creation of easements and rights-of-way.
100 m away · filed Dec 11, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.