Toronto address · Ward 19, Beaches-East York
113 Hannaford St
The City of Toronto has 2 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Garage
REV01- Revision to proposed detached garageProposal to demolish the existing garage at the rear of an existing SFD-semi dwelling.See also 17 201202 PRS (violation of derelict garage)
Applied Jul 18, 2018 · issued Dec 19, 2019 · Permit 17 236781 BLD (revision 01)
- Inspections under way
Small residential project · Garage
Proposal to demolish the existing garage at the rear of an existing SFD-semi dwelling.See also 17 201202 PRS (violation of derelict garage)
Applied Sep 21, 2017 · issued Oct 4, 2017 · Permit 17 236781 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To demolish an existing detached garage (21.60 m2) located at the rear of a two-storey detached dwelling. To construct a replacement garage (28.53 m2) also located at the rear of the dwelling.
Decision: Refused (hearing Apr 3, 2019)
Filed Oct 26, 2018 · File A1018/18TEY
What’s planned nearby
Development sites within 500 m
- Approved
- Under review
Neighbours’ Committee of Adjustment files within 250 m
88 Malvern Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a partial front one-storey addition (porch enclosure), and a rear three-storey addition with a third storey deck (to replace the existing rear two-storey portion of the dwelling and rear ground floor deck). This rear three-storey addition will be cantilevered on the north side of the dwelling. The existing rear one-storey detached ancillary building (garage containing a workshop) will be maintained and unaltered.
150 m away · filed May 19, 2026 · Approved
2345 Gerrard St E · Consent
To obtain consent to sever the property into two residential lots and to maintain the existing easement/right-of-way.
100 m away · filed Sep 19, 2025 · Approved
103 Malvern Ave · Minor variance
To construct a new rear two-storey detached ancillary building (containing two garden suites) with two porches on the south wall.
110 m away · filed Jul 7, 2025 · Approved
217 Pickering St · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition (including a basement level and walkout) with a wood deck and stairs.
110 m away · filed Mar 11, 2025 · Approved
55 Hannaford St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a basement walkout, a ground floor deck, and a second storey rooftop terrace.
200 m away · filed Nov 12, 2024 · Approved
2333 Gerrard St E · Minor variance
To construct a new three-storey detached dwelling (fourplex) with a front covered entrance, a rear ground floor terrace, and a rear staircase leading to balconies on all levels. Also, to construct a new one-storey ancillary building (two-car garage) with two parking pads, abutting Hannaford Street. There will be a total of four residential dwelling units on this lot.
100 m away · filed Sep 11, 2024 · Approved
121 Hannaford St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing new rear stairs. Also, to construct a new ancillary building (detached garage) in the rear yard of the property, abutting the lane. The existing rear deck and detached garage will be demolished.
20 m away · filed Feb 7, 2024 · Approved
2295 Gerrard St E · Minor variance
To construct an ancillary structure (shed) in the rear yard of the property with canopy covered areas (trellis).
200 m away · filed Oct 25, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.