The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Addition(s)
Proposal for dormer addition at east side (rear) of existing dwelling.
Applied Jan 26, 2015 · issued Apr 29, 2015 · completed Aug 11, 2017 · Permit 15 108278 BLD
- Closed
Plumbing · Fixtures/Roof Drains: SFD
Proposal to relocate and install new fixtures in bsmt & 2nd floor.
Applied Oct 4, 2006 · issued Oct 4, 2006 · completed Jun 5, 2017 · Permit 06 181442 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Submitted
20 storeys · 297 homes · Residential
30 m away · Site plan · Submitted · filed Apr 16, 2026
- Under review
50 storeys · 1,016 homes · Mixed use
220 m away · Rezoning · Under review · filed May 20, 2026
- Under review
29 storeys · 240 homes · Mixed use
250 m away · Site plan · Under review · filed Sep 16, 2022
- Under review
1-16 Sumach Street and 90 Eastern Avenue
55 storeys · 1,284 homes · Mixed use
270 m away · Site plan · Under review · filed Oct 21, 2025
- Under appeal
130-134 Parliament Street and 529 Richmond Street East
46 storeys · 419 homes · Mixed use
280 m away · Site plan · Under appeal · filed Aug 14, 2023
- Under appeal
56-60 Berkeley Street and 296-300 King Street East
42 storeys · 449 homes · Mixed use
310 m away · Site plan · Under appeal · filed Aug 14, 2023
Neighbours’ Committee of Adjustment files within 250 m
550 Adelaide St E · Minor variance
To alter the development standards as approved under Site Specific Zoning By-law 1306-2023, by increasing the maximum residential gross floor area from 19,800 m² to 24,000 m², the total gross floor area (for residential and non-residential uses) from 21,000 m² to 25,000 m², and the building height from 29 storeys (93 m) to 37 storeys (116.25 m). Also, to reduce the minimum required first storey height from 4.5 m to 2.74 m to accommodate the previously approved mezzanine within the automotive dealership. There will be a total of 302 residential dwelling units on this lot. A Site Plan Control a…
230 m away · filed Aug 28, 2026 · Postponed
4 Gilead Pl · Consent
To obtain consent to sever the property into three lots, and to maintain the existing easement/right-of-way.
40 m away · filed Apr 2, 2026 · Approved
4 Gilead Pl · Minor variance
The existing undersized public parking lot will be maintained and unaltered.
40 m away · filed Apr 2, 2026 · Approved
4 Gilead Pl · Minor variance
The existing one-storey and two-storey commercial buildings (retail and daycare) will be maintained and unaltered.
40 m away · filed Apr 2, 2026 · Approved
14 Eastern Ave · Minor variance
To permit and construct a second storey rooftop outdoor patio to be used as a children's play area. The existing two-storey non-residential detached building is under renovation for a day nursery (child care facility) as approved by Building Permit #25 143317 BLD 00 BA.
80 m away · filed Jan 13, 2026 · Approved
29 Sackville St · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a partial rooftop structure (pergola and wood deck above the existing flat roof dwelling), attached to the enclosed stair enclosure.
170 m away · filed Jun 6, 2024 · Approved
48 Power St · Consent
To obtain consent to sever the property into three lots and to create various easements/rights-of-way.
200 m away · filed Feb 27, 2023 · Approved
60 Trinity St · Consent
To obtain consent to a lease for a term in excess of 21 years.
230 m away · filed Oct 18, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.