The City of Toronto has 45 building permits since 2017 (18 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade · Fire alarm

    REV: Proposal for Fire Alarm Upgrades at Support Services Building within Hillcrest Complex.

    Applied May 15, 2026 · issued May 26, 2026 · Permit 25 229058 FSU (revision 01)

    Revision issued
  • Fire and security upgrade · Fire alarm

    Proposal for Fire Alarm Upgrades at Support Services Building within Hillcrest Complex.

    Applied Sep 22, 2025 · issued Sep 26, 2025 · Permit 25 229058 FSU

    Permit issued
  • Plumbing

    Plumbing - Proposal for M45-4 TTC Duncan Shop - Two (2) passenger elevators overhaul(DUN1L /DUN2L) and associated work

    Applied May 22, 2025 · issued Jul 7, 2025 · Permit 25 163528 PLB

    Permit issued
  • Heating and ventilation

    HVAC - Proposal for M45-4 TTC Duncan Shop - Two (2) passenger elevators overhaul(DUN1L /DUN2L) and associated work

    Applied May 22, 2025 · issued Jul 7, 2025 · Permit 25 163528 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for M45-4 TTC Duncan Shop - Two (2) passenger elevators overhaul(DUN1L /DUN2L) and associated work

    Applied May 22, 2025 · issued Jul 7, 2025 · Permit 25 163528 BLD

    Permit issued
  • Designated structure · Solar collector

    The scope of work is to add Solar (Photovoltaic) panels to the existing TTC Hillcrest facility as a part of the ZETF (zero emission transit fund) program

    Applied Dec 27, 2024 · issued Feb 10, 2025 · Permit 24 253909 DST

    Inspections under way
  • Plumbing · Other

    Proposal to provide non-freeze roof hydrants for cleaning hvac units complete with a backflow preventer.

    Applied Nov 25, 2024 · issued Dec 20, 2024 · Permit 24 243078 PSA

    Permit issued
  • Plumbing

    Plumbing - Proposed Full roof replacement (repairs) with limited mechanical work related to rooftop HVAC units, TTCAlteration to Communication Tower guy Anchors, New access staircase from upper roof to Lower.

    Applied Feb 22, 2024 · issued Mar 15, 2024 · completed Sep 24, 2026 · Permit 21 124748 PLB

    Closed
  • Addition or alteration · Other

    Replacement of existing dust collector and provision of new make-up RTU and related modifications

    Applied Apr 24, 2023 · issued May 23, 2023 · completed Feb 27, 2026 · Permit 23 137540 BLD

    Closed
  • Plumbing

    Revised 01- see cover letter for list of changesPlumbing - Reconstruction of existing stair leading to the roof, minor interior and roof reconstruction, modifications to electrical and HVAC systems

    Applied Apr 24, 2023 · issued May 24, 2023 · completed Jan 15, 2026 · Permit 22 229548 PLB (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Replacement of existing dust collector and provision of new make-up RTU and related modifications

    Applied Apr 24, 2023 · issued May 26, 2023 · completed Feb 23, 2026 · Permit 23 137540 HVA

    Closed
  • Heating and ventilation

    Revised 01- see cover letter for list of changesHVAC - Reconstruction of existing stair leading to the roof, minor interior and roof reconstruction, modifications to electrical and HVAC systems

    Applied Apr 24, 2023 · issued May 24, 2023 · completed Jan 12, 2026 · Permit 22 229548 HVA (revision 01)

    Closed
Show 33 more permits
  • Addition or alteration · Other

    Revised 01- see cover letter for list of changesReconstruction of existing stair leading to the roof, minor interior and roof reconstruction, modifications to electrical and HVAC systems

    Applied Apr 24, 2023 · issued May 16, 2023 · completed Jan 16, 2026 · Permit 22 229548 BLD (revision 01)

    Closed
  • Addition or alteration · Other

    Proposed upgrades (BLD, HVA, PLB) associated with the diesel fuel piping system that supports the testing of the skid-mounted diesel engines and the associated ancillary exhaust system. The upgraded system is located in the two diesel engine testing rooms within the Duncan Shops Facility as indicated on the site plan

    Applied Feb 24, 2023 · issued Mar 24, 2023 · completed Aug 14, 2025 · Permit 23 117325 BLD

    Closed
  • Plumbing

    Plumbing - Proposed upgrades (BLD, HVA, PLB) associated with the diesel fuel piping system that supports the testing of the skid-mounted diesel engines and the associated ancillary exhaust system. The upgraded system is located in the two diesel engine testing rooms within the Duncan Shops Facility as indicated on the site plan

    Applied Feb 24, 2023 · issued Mar 24, 2023 · completed Aug 8, 2025 · Permit 23 117325 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposed upgrades (BLD, HVA, PLB) associated with the diesel fuel piping system that supports the testing of the skid-mounted diesel engines and the associated ancillary exhaust system. The upgraded system is located in the two diesel engine testing rooms within the Duncan Shops Facility as indicated on the site plan

    Applied Feb 24, 2023 · issued Mar 24, 2023 · completed May 22, 2025 · Permit 23 117325 HVA

    Closed
  • Heating and ventilation

    HVAC - Reconstruction of existing stair leading to the roof, minor interior and roof reconstruction, modifications to electrical and HVAC systems

    Applied Nov 15, 2022 · issued Feb 23, 2023 · completed Jan 12, 2026 · Permit 22 229548 HVA

    Closed
  • Plumbing

    Plumbing - Reconstruction of existing stair leading to the roof, minor interior and roof reconstruction, modifications to electrical and HVAC systems

    Applied Nov 15, 2022 · issued Feb 15, 2023 · completed Jan 15, 2026 · Permit 22 229548 PLB

    Closed
  • Addition or alteration · Other

    Reconstruction of existing stair leading to the roof, minor interior and roof reconstruction, modifications to electrical and HVAC systems

    Applied Nov 15, 2022 · issued Feb 15, 2023 · completed Jan 16, 2026 · Permit 22 229548 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposed Full roof replacement (non-structural repairs) with limited mechanical work related to rooftop HVAC units - TTC

    Applied Mar 9, 2021 · issued Sep 10, 2021 · completed Sep 24, 2026 · Permit 21 124748 HVA

    Closed
  • Addition or alteration · Other

    Proposed Full roof replacement (repairs) with limited mechanical work related to rooftop HVAC units,Alteration to Communication Tower guy Anchors, New access staircase from upper roof to Lower. (TTC)

    Applied Mar 9, 2021 · issued Sep 10, 2021 · Permit 21 124748 BLD

    Inspections under way
  • Plumbing · Backflow prevention devices (Water only)

    Revisions to drawing titles changed and drawing S001 added to G001. S001 and E100 callouts added to M003.- Revisions to the new panelboard and associated conduit as seen on drawings E100 and E101. - Hand rails have been added to M101, as well as changes to notes and the extent of the high voltage cables shown in the drawing.proposal for the installation of 2 backflow prevention devices in existing transit station- Hillcrest complex

    Applied Mar 12, 2019 · issued Apr 9, 2019 · completed Aug 27, 2019 · Permit 18 167306 PSA (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to convert existing lunch rooms to offices on the second floor of the Inglish Building. Work to include new ceiling, sprinkler replacement, new mechanical and installation of new partitions and doors. Electrical work to support new layout is also required.

    Applied Jan 15, 2019 · issued Feb 25, 2019 · completed Nov 7, 2019 · Permit 19 104860 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to convert existing lunch rooms to offices on the second floor of the Inglis Building. Work to include new ceiling, sprinkler replacement, new mechanical and installation of new partitions and doors. Electrical work to support new layout is also required.

    Applied Jan 15, 2019 · issued Feb 5, 2019 · Permit 19 104860 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for interior alterations to convert existing lunch rooms to offices on the second floor of the Inglish Building. Work to include new ceiling, sprinkler replacement, new mechanical and installation of new partitions and doors. Electrical work to support new layout is also required.

    Applied Jan 15, 2019 · issued Feb 25, 2019 · completed Nov 6, 2019 · Permit 19 104860 PLB

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal for the installation of 2 backflow prevention devices in existing transit station- Hillcrest complex

    Applied May 29, 2018 · issued Sep 4, 2018 · completed Aug 27, 2019 · Permit 18 167306 PSA

    Closed
  • Fire and security upgrade · Sprinklers

    Proposal to upgrade fire sprinkler system over the new tire carousel area in duncan shop. Replace existing sprinkler heads and piping with new to meet the water demand requirement for tire carousel hazard classification.

    Applied Jan 22, 2018 · issued Feb 26, 2018 · Permit 18 107675 FSU

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to reconstruct the passenger elevator at Duncan TTC repair shop for the Toronto Transit Commission.

    Applied Sep 28, 2017 · issued Oct 11, 2017 · completed Apr 21, 2021 · Permit 17 240525 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to reconstruct the passenger elevator at Duncan TTC repair shop for the Toronto Transit Commission.

    Applied Sep 28, 2017 · issued Oct 16, 2017 · completed Feb 22, 2021 · Permit 17 240525 HVA

    Closed
  • Heating and ventilation

    Hvac - renovate existing women's locker room/washroom to meet barrier free requirements

    Applied Oct 31, 2016 · issued Dec 7, 2016 · completed Sep 29, 2020 · Permit 16 244878 HVA

    Closed
  • Addition or alteration · Interior alterations

    Renovate existing women's locker room/washroom to meet barrier free requirements

    Applied Oct 31, 2016 · issued Nov 15, 2016 · completed Dec 8, 2020 · Permit 16 244878 BLD

    Closed
  • Plumbing

    Plumbing - RENOVATE EXISTING WOMEN'S LOCKER ROOM/WASHROOM TO MEET BARRIER FREE REQUIREMENTS

    Applied Oct 31, 2016 · issued Dec 7, 2016 · completed Sep 29, 2020 · Permit 16 244878 PLB

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Proposal for fire protection upgrade - provide and install maglock at south exist onto Bathurst St. Maglock interloced to the fire alarm panel.

    Applied Jan 21, 2016 · issued Feb 23, 2016 · Permit 16 106911 FSU

    Permit issued
  • Addition or alteration · Interior alterations

    Stair access to roof of Hillcrest TTC operations building

    Applied May 26, 2015 · issued Jun 4, 2015 · Permit 15 163137 BLD

    Permit issued
  • Addition or alteration · Interior alterations

    REVISION - additional detailsTo complete interior alterations to the existing subway station to install a "Fall Arrest" along service bays.

    Applied Apr 9, 2015 · issued Apr 17, 2015 · Permit 14 200793 BLD (revision 01)

    Revision issued
  • Addition or alteration · Balcony/Guard repairs

    To repair the free standing guardrails, modify the existing guardrails, and install new guardrail secured to existing retaining wall.

    Applied Oct 24, 2014 · issued Nov 3, 2014 · Permit 14 242888 BLD

    Permit issued
  • Addition or alteration · Interior alterations

    To complete interior alterations to the existing subway station to install a "Fall Arrest" along service bays.

    Applied Aug 1, 2014 · issued Aug 26, 2014 · Permit 14 200793 BLD

    Permit issued
  • Addition or alteration · Other

    This is for the installation of a fall arrest system within the Duncan TTC repair shop for the Toronto Transit Commission.

    Applied Dec 19, 2011 · issued Feb 7, 2012 · Permit 11 328346 BLD

    Inspections under way
  • Heating and ventilation · Other

    Replacement of computer room air conditioning

    Applied Oct 14, 2010 · issued Nov 10, 2010 · completed Jun 8, 2026 · Permit 10 277413 MSA

    Closed (dormant)
  • Fire and security upgrade · Fire alarm

    Carry out fire alarm modifications in radio communication room.

    Applied Feb 19, 2009 · issued Mar 13, 2009 · completed Jun 8, 2026 · Permit 09 110602 FSU

    Closed (dormant)
  • Addition or alteration · Interior alterations

    Interior alterations to administrative for TTC Administrative and Maintenance building.. Single Tenant Floor/building. Re: Duncan Building Note: 1138 Bathurst Street is a convenience address for 1130 Bathurst St.

    Applied Apr 21, 2008 · issued Apr 23, 2008 · Permit 08 149627 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alterations to offices on 2nd floor. Single Tenant Floor/building. TTC Building

    Applied Apr 21, 2008 · issued May 21, 2008 · Permit 08 149627 HVA

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to demolish portions of existing hoist pits and reconstruct hoist pits and installation of new vehicle hoists, at the Duncan Repair Shop.

    Applied Apr 15, 2008 · issued May 9, 2008 · completed Jun 8, 2026 · Permit 08 147255 HVA

    Closed (dormant)
  • Addition or alteration · Multiple projects

    Proposal to demolish portions of existing hoist pits and reconstruct hoist pits and installation of new vehicle hoists, at the Duncan Repair Shop. Confirmed address: 1130 Bathurst St.

    Applied Apr 15, 2008 · issued Apr 22, 2008 · completed Jun 8, 2026 · Permit 08 147255 BLD

    Closed (dormant)
  • Addition or alteration · Unknown

    Make alterations to increase size of existing spray booth harvey shops ss

    Applied May 20, 1999 · issued Aug 20, 1999 · completed Jun 8, 2026 · Permit 99 016766 BLD

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 374-390 Dupont Street

    16 storeys · 257 homes · Mixed use

    380 m away · Site plan · Under review · filed Oct 31, 2021

    Under review
  • 574 Davenport Road

    Not stated in the file

    410 m away · Condominium · Approved · filed Oct 4, 2022

    Approved
  • 555 Davenport Road

    8 storeys · 134 homes · Residential

    450 m away · Site plan · Under review · filed Apr 25, 2022

    Under review
  • 500 Macpherson Avenue

    8 storeys · 135 homes · Residential

    460 m away · Site plan · Under review · filed Apr 25, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 1130 Bathurst St · Minor variance

    To construct a staff parking lot within the hydro corridor, located south of the TTC Hillcrest Complex, by reducing the accessible parking spaces, and driving aisle widths.

    10 m away · filed Mar 13, 2026 · Postponed

  • 343 Albany Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a third storey addition with a rear third floor deck on the roof of the second storey below, and a two-storey rear addition (at the southeast portion of the dwelling).

    120 m away · filed Jun 1, 2024 · Approved

  • 792 Davenport Rd · Minor variance

    To alter the existing two-storey detached dwelling by: constructing a complete third storey addition and a front basement walkout; reconstructing the front porch and stairs; and, converting the existing basement and garage into a secondary suite. A total of two dwelling units (one primary unit and one secondary suite) will be within this dwelling. Also, to install a front yard parking pad for two parking spaces.

    250 m away · filed Jul 4, 2022 · Approved

  • 332 Howland Ave · Minor variance

    To alter the existing 2 ½-storey detached fourplex by constructing a rear two storey addition, a rear third storey addition, a rear second storey deck, and a rear third storey deck.

    200 m away · filed Sep 1, 2020 · Approved

  • 367 Howland Ave · Minor variance

    To construct a new three-storey semi-detached triplex with a rear basement walkout, a rear balcony on each level, front first and second storey balconies and two rear parking spots on the conveyed lot (Part 1), as described application B0081/19TEY.

    230 m away · filed Aug 20, 2019 · Approved

  • 367 Howland Ave · Consent

    To obtain consent to sever the property into two undersized residential lots for redevelopment.

    230 m away · filed Aug 20, 2019 · Approved

  • 367 Howland Ave · Minor variance

    To convert the existing two-storey detached house into a three-storey semi detached triplex by constructing a side and rear two-storey addition, a new third storey, front and rear basement walkouts, a rear balcony on each level, front first and second storey balconies and one rear parking spot on the retained lot (Part 2), as described in application B0081/19TEY. The triplex will be attached to the new triplex on the conveyed lot (Part 1).

    230 m away · filed Aug 20, 2019 · Approved

  • 383 Albany Ave · Minor variance

    To alter the existing 2-storey townhouse dwelling by constructing a rear third-storey addition, a rear ground floor addition, and a rear ground floor deck.

    150 m away · filed Sep 26, 2018 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.