Toronto address · Ward 21, Scarborough Centre
114 Haileybury Dr
The City of Toronto has 10 building permits since 2017 (6 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
Revision 01- second furnance moved to second floor, second floor duct work designed on second floor ceiling, duct design modified in basementHVAC - To construct a two storey addition, interior alterations, rear deck, second floor balcony for two unit dwelling
Applied Dec 10, 2025 · issued Dec 15, 2025 · Permit 22 189008 HVA (revision 01)
- Revision issued
Small residential project · Multiple projects
Revision 01: interior changes, enlarging rear deck & balcony, secondary suite in basement, architectural elements in the front elevation of the building. To construct a two storey addition, interior alterations, rear deck, second floor balcony for two unit dwelling
Applied Sep 18, 2025 · issued Nov 18, 2025 · Permit 22 189008 BLD (revision 01)
- Inspections under way
Heating and ventilation
HVAC - To construct a two storey addition, interior alterations, rear deck, second floor balcony for two unit dwelling
Applied Aug 20, 2025 · issued Sep 5, 2025 · Permit 22 189008 HVA
- Inspections under way
Drains and site services
Drain - To construct a two storey addition, interior alterations, rear deck, second floor balcony for two unit dwelling
Applied Aug 11, 2022 · issued Feb 7, 2025 · Permit 22 189008 DRN
- Inspections under way
Small residential project · Multiple projects
To construct a two storey addition, interior alterations, rear deck, second floor balcony for two unit dwelling
Applied Aug 11, 2022 · issued Feb 7, 2025 · Permit 22 189008 BLD
- Inspections under way
Plumbing
Plumbing - To construct a two storey addition, interior alterations, rear deck, second floor balcony for two unit dwelling
Applied Aug 11, 2022 · issued Feb 7, 2025 · Permit 22 189008 PLB
- Cancelled
Drains and site services
Drain - To construct a two storey dwelling with attached garage and second unit in basement
Applied Jul 31, 2022 · completed Aug 11, 2022 · Permit 22 184287 DRN
- Cancelled
Plumbing
Plumbing - To construct a two storey dwelling with attached garage and second unit in basement
Applied Jul 31, 2022 · completed Aug 11, 2022 · Permit 22 184287 PLB
- Cancelled
New house · New building
To construct a two storey dwelling with attached garage and second unit in basement
Applied Jul 31, 2022 · completed Aug 11, 2022 · 1 home added · Permit 22 184287 BLD
- Cancelled
Demolition
To demolish existing dwelling and construct a two storey dwelling with attached garage and second unit in basement
Applied Jul 31, 2022 · completed Aug 11, 2022 · 1 home removed · Permit 22 184289 DEM
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a second storey addition to existing dwelling.
Decision: Approved (hearing Jun 2, 2022)
Filed Mar 8, 2022 · File A0063/22SC
What’s planned nearby
Development sites within 500 m
- Approved
11 storeys · 206 homes · Mixed use
390 m away · Site plan · Approved · filed Dec 5, 2024
Neighbours’ Committee of Adjustment files within 250 m
18 Camarel Cres · Minor variance
To construct a second storey addition to the existing dwelling.
240 m away · filed Mar 26, 2021 · Approved
147 Haileybury Dr · Minor variance
To construct a second storey addition over the existing dwelling and a new two-storey east-side addition. The proposed second suite will be located in the new second floor, with access from the front. This application was deferred at the August 13, 2020 virtual hearing so the applicant could address concerns from the neighbouring residents and the Councillor.
220 m away · filed May 20, 2020 · Approved
37 Canzone Dr · Minor variance
To construct a new two-storey detached dwelling.
250 m away · filed Jan 28, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.