Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

1142 Greenwood Ave

The City of Toronto has 4 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    To raise the first floor level of the existing detached single family dwelling and construct additions above and to the front (160.86m2) . New front and rear platforms and stairs will be constructed. The existing detached garage in the rear yard will be maintained.

    Applied Sep 16, 2015 · issued Oct 5, 2015 · Permit 15 223568 BLD

    Inspections under way
  • Plumbing

    Plumbing - To raise the first floor level of the existing detached single family dwelling and construct additions above and to the front (160.86m2) . New front and rear platforms and stairs will be constructed. The existing detached garage in the rear yard will be maintained.

    Applied Sep 16, 2015 · issued Oct 5, 2015 · Permit 15 223568 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - To raise the first floor level of the existing detached single family dwelling and construct additions above and to the front (160.86m2) . New front and rear platforms and stairs will be constructed. The existing detached garage in the rear yard will be maintained.

    Applied Sep 16, 2015 · issued Oct 6, 2015 · Permit 15 223568 HVA

    Inspections under way
  • Drains and site services

    Drain - To raise the first floor level of the existing detached single family dwelling and construct additions above and to the front (160.86m2) . New front and rear platforms and stairs will be constructed. The existing detached garage in the rear yard will be maintained.

    Applied Sep 16, 2015 · issued Oct 5, 2015 · completed Apr 17, 2026 · Permit 15 223568 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 322 Cosburn Ave · Minor variance

    To construct a new three-storey (12-unit) apartment building which will span across two lots. This lot (Part 2) will contain six residential dwelling units with front and rear basement walkouts, a front porch with stairs, and a rear third storey balcony. The second storey will be cantilevered on the west side of the building. There will be a total of two short term and five long term bicycle parking spaces in the rear yard.

    230 m away · filed Aug 14, 2026 · Hearing scheduled

  • 322 Cosburn Ave · Minor variance

    To construct a new three-storey (12-unit) apartment building which will span across two lots. This lot (Part 1) will contain six residential dwelling units with front and rear basement walkouts, a front porch with stairs, and a rear third storey balcony. The second storey will be cantilevered on the east side of the building. There will be a total of one short-term and six long-term bicycle parking spaces in the rear yard.

    230 m away · filed Aug 14, 2026 · Hearing scheduled

  • 63 St Hubert Ave · Minor variance

    To construct a new three-storey detached dwelling (basement level is considered the first level) with an integral garage, a front porch, a rear second storey covered deck, and a rear basement walkout. There will be a total of two residential dwelling units on this lot (one unit within the basement (first) level and one unit occupying the second and third levels).

    90 m away · filed Feb 12, 2026 · Approved

  • 1107 Greenwood Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a rear two-storey addition with a covered ground floor deck, stairs, and basement walkout, and a covered front porch with stairs. There will be a total of two residential dwelling units on this lot (one dwelling unit occupying the basement, and one dwelling unit occupying the first and second levels). The existing rear enclosed porch will be demolished.

    180 m away · filed Nov 26, 2025 · Approved

  • 1128 Greenwood Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition (which will be cantilevered on the south side), a front ground floor porch with stairs, and a rear basement walkout. There will be one parking space along the south side of the dwelling.

    80 m away · filed Sep 18, 2025 · Approved

  • 346 O'Connor Dr · Minor variance

    To construct a new one-storey ancillary building (two-car garage), in the rear yard, abutting Cadorna Avenue.

    230 m away · filed Sep 17, 2025 · Hearing scheduled

  • 364 O'Connor Dr · Minor variance

    To permit a vehicle washing establishment use (other than using automatic, coin-operated or ride-through car washing establishments or facilities) within the one-storey detached building containing the existing Automotive Service Centre.

    210 m away · filed Jul 23, 2025 · Approved

  • 105 St Hubert Ave · Minor variance

    To construct a new two-storey detached dwelling with an integral garage, a front mezzanine living area above integral garage, a front covered porch with stairs and canopy, a rear first floor deck with stairs, a rear basement walkout and a front and rear second floor balcony. The existing rear detached garage will be demolished.

    150 m away · filed Jun 23, 2025 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.