Toronto address · Ward 19, Beaches-East York
115 Edgewood Ave
The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Underpinning
Full underpinning of front portion of basement (unfinished basement); construct new foundation walls under existing entry foyer
Applied Jul 13, 2007 · issued Jul 13, 2007 · Permit 07 242973 BLD
- Inspections under way
Drains and site services
Drain - Full underpinning (unfinished basement); construct new foundation walls under existing entry foyer
Applied Jul 13, 2007 · issued Jul 13, 2007 · Permit 07 242973 DRN
- Inspections under way
Small residential project · Multiple projects
New front porch, new deck at south side, interior renovations to first and second floor
Applied Jul 6, 2004 · issued Jul 9, 2004 · Permit 04 153248 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
10 storeys · 70 homes · Residential
370 m away · Rezoning · Under review · filed Apr 16, 2025
Neighbours’ Committee of Adjustment files within 250 m
5 Edgewood Gdns · Minor variance
To legalize and to maintain one additional ground floor deck, two ancillary buildings (sheds containing storage, utility, and garden equipment), and hard surface driveway and patio areas, which have been constructed without an authorized building permit. Also, to permit the existing two-storey detached ancillary building (containing one garden suite). There is a total of two residential dwelling units on this lot (one unit occupying the main dwelling, and one unit occupying the ancillary building.
70 m away · filed Nov 13, 2025 · Approved
8 Edgewood Grv · Minor variance
To construct a new two-storey detached dwelling (including a basement) with a front ground level covered deck (abutting Edgewood Grove), and a side (east) covered porch with stairs (abutting Edgewood Gardens). Also, to construct a new one-storey detached ancillary building (one-car garage), abutting Edgewood Gardens.
50 m away · filed Nov 4, 2025 · Approved
66 Edgewood Ave · Minor variance
To construct a new two-storey garden suite with a front basement walkout, a front ground floor entrance with external stairs, and north and south side second storey green roofs, in the rear yard of the lot. The existing two-storey detached main dwelling on the lot will remain unaltered.
190 m away · filed Jan 20, 2024 · Approved
63 Wrenson Rd · Minor variance
To install a front yard parking pad.
170 m away · filed Dec 19, 2023 · Deferred
182 Eastwood Rd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a one-storey rear addition, and a rear deck with stairs.
230 m away · filed Jan 12, 2023 · Approved
1 Edgewood Gdns · Minor variance
To alter the existing one-and-one-half-storey detached dwelling by constructing a complete second storey addition, a two-storey front addition, and a front second storey cantilevered window box.
70 m away · filed Nov 4, 2022 · Approved
76 Eastwood Rd · Minor variance
To construct a new three-storey four-unit dwelling with a rear basement walkout, front and rear basement level patios, a rear ground floor terrace, a side (west) ground floor entrance platform, a covered front porch, second storey front and rear balconies, and third storey front and rear terraces. Also, to construct a rear two-storey ancillary building (garden suite) with a first storey rear patio and rear second storey juliette balcony.
130 m away · filed Oct 24, 2022 · Approved
44 Highcroft Rd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a one-storey rear sunroom addition with a new deck.
190 m away · filed May 24, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.