Toronto address · Ward 4, Parkdale-High Park
115 Grenadier Rd
The City of Toronto has 3 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Multiple projects
Proposal for interior alterations to the first floor of an existing semi detached single family dwelling. Work includes removal of a non-load bearing partitions at the 1st floor, a new third floor dormer and a new third floor deck.
Applied Oct 14, 2020 · issued Dec 3, 2020 · Permit 20 206401 BLD
- Inspections under way
Drains and site services · Back water valve (Sewer only)
Proposed: installation of back water valve (sewer only)
Applied Jan 16, 2018 · issued Jan 16, 2018 · Permit 18 105508 DRN
- Closed
Small residential project · Party wall admin permits
Admin partywall permit in conjunction with 15 244057 BLD, 117 Grenadier Rd.
Applied Oct 28, 2015 · issued Dec 3, 2015 · completed Feb 17, 2023 · Permit 15 244061 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
11 storeys · 130 homes · Mixed use
360 m away · Condominium · Under review · filed Nov 8, 2021
Neighbours’ Committee of Adjustment files within 250 m
15 Constance St · Minor variance
180 m away · filed Sep 24, 2026 · Accepted
43 Grenadier Rd · Minor variance
To construct a new one-storey detached ancillary building (a one-car garage with storage space) in the rear yard, abutting the laneway.
210 m away · filed Jan 5, 2026 · Approved
289 Roncesvalles Ave · Minor variance
To alter the existing three-storey mixed-use building by constructing rear second and third storey additions (above the existing ground level that will be partially reconstructed with a new rear basement addition below), a complete fourth storey addition with front and rear balconies, a rear basement walkout, a south side second storey balcony, as well as rooftop access for maintenance from two staircase enclosures and one elevator enclosure (located above the fourth level). There will be a total of one commercial unit and six residential dwelling units on this lot (one commercial unit occupy…
140 m away · filed Sep 11, 2025 · Approved
73 Westminster Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front third storey (attic) addition.
230 m away · filed Jan 27, 2025 · Approved
76 Grenadier Rd · Minor variance
To alter the existing two-storey townhouse dwelling by reconstructing the front covered porch, as well as, to construct a rear second storey addition (above the existing one-storey), and a rear ground floor deck.
120 m away · filed Sep 1, 2024 · Approved
294 Roncesvalles Ave · Minor variance
To permit a wellness centre (located in the basement and ground floor) in the existing two-and-one-half-storey mixed-use building that contains two dwelling units (located on the second and third floor).
100 m away · filed Jan 19, 2024 · Approved
141 Geoffrey St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition with a rear ground floor patio and stairs. Also, to construct a one-storey ancillary building (detached garage with a west side deck and stairs) in the rear yard.
190 m away · filed Jul 24, 2023 · Approved
33 Parkway Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a third storey addition with a rear third storey deck. The existing one-storey ancillary building (detached garage), abutting the laneway, will be maintained and unaltered.
150 m away · filed Jun 6, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.