The City of Toronto has 10 building permits since 2017 (2 still open) and 2 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • New house · New building

    Rev 01:- Adding new windows & change cladding material including new HVAC designProposal to construct a new 2 storey detached dwelling with 2 units and a detached garage.

    Applied Aug 22, 2023 · issued Nov 27, 2023 · Permit 22 229541 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    Rev 01:- Adding new windows & change cladding material including new HVAC designHVAC - Proposal to construct a new 2 storey detached dwelling with 2 units and a detached garage.

    Applied Aug 22, 2023 · issued Nov 28, 2023 · completed Aug 14, 2025 · Permit 22 229541 HVA (revision 01)

    Closed
  • Plumbing

    propose to construct a new garden suite over the detached garage

    Applied Mar 8, 2023 · issued Dec 11, 2023 · completed Aug 20, 2025 · Permit 23 121199 PLB

    Closed
  • Small residential project · Second suite (New)

    propose to construct a new garden suite over the detached garage

    Applied Mar 8, 2023 · issued Dec 11, 2023 · completed Aug 7, 2025 · 1 home added · Permit 23 121199 BLD

    Closed
  • Heating and ventilation

    propose to construct a new garden suite over the detached garage

    Applied Mar 8, 2023 · completed Jun 14, 2023 · Permit 23 121199 HVA

    Cancelled
  • Drains and site services

    Drain - Proposal to construct a new 2 storey detached dwelling with 2 units and a detached garage.

    Applied Nov 15, 2022 · issued Mar 28, 2023 · completed Aug 13, 2025 · Permit 22 229541 DRN

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct a new 2 storey detached dwelling with 2 units and a detached garage.

    Applied Nov 15, 2022 · issued Apr 13, 2023 · completed Aug 14, 2025 · Permit 22 229541 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct a new 2 storey detached dwelling with 2 units and a detached garage.

    Applied Nov 15, 2022 · issued Mar 28, 2023 · completed Aug 14, 2025 · Permit 22 229541 PLB

    Closed
  • Demolition

    Proposal to demolish the existing 1 storey SFD-detached dwelling.

    Applied Nov 15, 2022 · issued Apr 19, 2023 · completed Aug 20, 2025 · 1 home removed · Permit 22 229522 DEM

    Closed
  • New house · New building

    Proposal to construct a new 2 storey detached dwelling with 2 units and a detached garage.

    Applied Nov 15, 2022 · issued Mar 28, 2023 · 2 homes added · Permit 22 229541 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a garden suite in the side yard. A minor variance was missed on a previously approved application from June 1st, 2023. A0085/23SC

    Decision: Approved (hearing Oct 18, 2023)

    Filed Aug 30, 2023 · File A0198/23SC

    Closed
  • Minor variance · New R building

    To construct a garden suite in the side yard

    Decision: Approved (hearing Jun 1, 2023)

    Filed Mar 30, 2023 · File A0085/23SC

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 25 Manhattan Dr · Minor variance

    To legalize the existing canopy in the north side yard. The existing dwelling will remain unchanged.

    220 m away · filed Nov 3, 2025 · Approved

  • 100 Elinor Ave · Minor variance

    To legalize the existing two-storey dwelling with a rear deck, rear balcony and front porch.

    230 m away · filed Aug 21, 2025 · Approved

  • 130 Lilian Dr · Minor variance

    To construct an additional basement dwelling unit and proposed basement walk-up to the existing dwelling.

    230 m away · filed Sep 14, 2024 · Approved

  • 79 Elinor Ave · Minor variance

    To permit a garden suite in the rear yard. This application was previously deferred at the October 16, 2024 hearing and was rescheduled from the December 4, 2024 hearing.

    180 m away · filed Aug 9, 2024 · Approved

  • 94 Elinor Ave · Minor variance

    To permit circular driveway.

    230 m away · filed Dec 22, 2023 · Approved

  • 103 Elinor Ave · Minor variance

    To permit a reduced lot area, resulting from a lot addition. This application is being jointly considered with Minor Variance Application A0240/23SC. Cross-Reference Consent Application B0042/23SC.

    200 m away · filed Oct 30, 2023 · Approved

  • 3 Joy Dr · Minor variance

    To permit a reduced lot area, resulting from a lot addition. This application is being jointly considered with Minor Variance Application A0241/23SC. Cross-Reference Consent Application B0042/23SC.

    190 m away · filed Oct 30, 2023 · Approved

  • 3 Joy Dr · Consent

    To obtain consent to sever a portion of the land for the purpose of a lot addition in favor of 103 Elinor Avenue for the purposes of vehicular access. Cross-Reference Minor Variance Applications A0240/23SC & A0241/23SC. This is a Delegated Consent, there is no public hearing.

    190 m away · filed Oct 30, 2023 · Approved

Everything planned in Scarborough Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.