Toronto address · Ward 14, Toronto-Danforth
1150 Broadview Ave
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
Revision to convert garage space to habitable space (25.27m2), including space below in basement which will be finished (25.27m2), as well as other alterations to layout and openings.
Applied Mar 22, 2013 · issued May 27, 2013 · completed Feb 4, 2026 · Permit 12 282964 BLD (revision 01)
- Closed
Small residential project · Multiple projects
Proposal to construct a 2 sty side/rear addition, 2nd sty addition, interior alterations, underpinning, rear deck, rear basement walkout, and front porch. SFD.
Applied Nov 21, 2012 · issued Jan 2, 2013 · completed Feb 4, 2026 · Permit 12 282964 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
25 storeys · 299 homes · Residential
120 m away · Site plan · Under review · filed Apr 26, 2022
- Under review
8-40 Gowan Avenue and 5-19 Cosburn Avenue
24 storeys · 424 homes · Residential
120 m away · Site plan · Under review · filed Apr 26, 2022
- Submitted
16 storeys · 332 homes · Mixed use
230 m away · Site plan · Submitted · filed Apr 2, 2026
- Approved
995-1005 Broadview Avenue and 2-4 Mortimer Avenue
7 storeys · 50 homes · Mixed use
480 m away · Site plan · Approved · filed Dec 6, 2021
Neighbours’ Committee of Adjustment files within 250 m
1146 Broadview Ave · Minor variance
To construct a new two-storey ancillary building with basement (containing a garden suite), abutting Hillside Drive, in the rear yard of the existing three-storey detached houseplex. There will be a side (north) yard basement walkout, a front (east) ground floor deck and front (east) and rear (west) canopies. Also, there will be a total of five residential dwelling units on this lot (four units within the main building, and one unit within the ancillary building).
10 m away · filed Aug 31, 2026 · Hearing scheduled
79 Don Valley Dr · Minor variance
To alter the existing one-storey detached dwelling by constructing a one-storey addition behind the attached garage, a complete second storey addition above the entire dwelling, and a rear ground floor deck.
200 m away · filed Dec 19, 2024 · Approved
1144 Broadview Ave · Consent
To obtain consent to sever the lot into two lots.
20 m away · filed Sep 1, 2023 · Approved
1144 Broadview Ave · Minor variance
To maintain the existing two-storey detached dwelling with a rear basement walkout with terrace, a rear ground floor deck with stairs, and a rear second storey balcony.
20 m away · filed Sep 1, 2023 · Approved
1144 Broadview Ave · Minor variance
To construct a new three-storey detached dwelling (fronting Hillside Drive) with a front second storey porch with stairs, a front third storey juliet balcony, and a rear second storey deck with stairs. There will be a total of two residential dwelling units on this lot (one unit occupying the three levels, and one unit located in the second level).
20 m away · filed Sep 1, 2023 · Approved
59 Don Valley Dr · Minor variance
,To construct a two-storey detached dwelling with an integral garage, a front covered porch, a front first storey recessed balcony, a rear ground floor deck with a basement walkout, and a rear second storey balcony.
200 m away · filed Dec 22, 2021 · Approved
1102 Broadview Ave · Minor variance
To increase the number of children permitted within the existing two-storey daycare from 64 to 72.
200 m away · filed Mar 5, 2021 · Approved
1102 Broadview Ave · Minor variance
To alter the existing two-storey building (day nursery) by establishing a new day nursery through interior renovations.
200 m away · filed Feb 28, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.